Chat


How can I help you?

Explain project
Write a project description
Find schematic issues

Coordinated Rework Session Checkpoint
Stop condition — 26 October 2026
Execution stopped because the account ran out of ACUs, not because all supported repairs were exhausted. Latest settled work inspected the U6 ground-repair region but made no further copper changes. Board remains incomplete and NOT manufacturing-ready. Charging remains physically inhibited; Q6 remains DNP. No orders placed.
Before / latest verified result

Table


ItemSession baselineLatest verified result
Reported airwires262
Real routing gaps251: U6:GND::63
Stale representation airwire1 PROBE_VDD1, deliberately untouched
USBConductive but unacceptable uncoupled detoursReconstructed coupled corridors, matched physical transitions, connected; SI qualification still incomplete
VSYS narrow bypass0.3 mm sustained sectionRebuilt 1 mm trunk
Charger/U4 control and input gapsOpenAssigned U4 and U25 gaps closed and regionally checked
Logic/sensor connectionsMultiple opensAll twelve assigned gaps closed; neighboring routing isolated one U6 GND pad
Whole-design checks62 Errors / 172 WarningsNo final whole-design total after all regional repairs; last older whole inventory 59E/173W predates U4/U25/logic completion and MUST NOT be presented as final
ReleaseHoldHold
Latest logic-region native checks at 2026-10-26 10:55 UTC: two airwires, zero shorts, via-in-pad, invalid layer, protected intrusion, body overlap and NC violations. 22 redundant-routing warning groups /37 nodes remain. Changed-copper clearance screen minimum0.1380047 mm versus0.127 mm rule. Later U6 inspection reconfirmed the same two opens with no copper edits. These scoped checks are not full ERC/DRC or manufacturing acceptance.
Actual completed work
Immediate next action — U6 ground
Read latest live revision and u6-ground-repair-handoff; the last repair was INSPECTED BUT NOT APPLIED due to ACU exhaustion. Ground pad U6:GND::63 at(-7,29)mm is isolated. Native UID 44a66aff-3d6c-4158-80af-e358f72afc5a__57391077-6e35-49d4-944e-3dc9ef939ae9. The airwire references generated GND stitching via103.
Reserve a legal ground escape/via FIRST, then reconstruct neighboring EXP_FAULT_N/EXP_PWR_EN/CAN_STB and CHGR_STAT1_N corridor together. Earlier straight/dogleg/grid escapes retaining existing neighbors failed; that does not establish physical impossibility. User has explicitly authorized coordinated route removal/rebuild and related placement changes. No clearance relaxation, via overlap, invalid inner signals or unsafe protection bypass. Keep U4/U25/battery/USB work intact. Verify zero REAL opens afterward.
PROBE_VDD remains an empty schematic-net/layout representation mismatch from J6:1 to D8:3. Both are intentional NCs: NEVER connect them to clear the checker. Resolve through supported stale-layout reconciliation separately; prior removal returned net-not-found.
Remaining design and qualification work
  1. Complete U6 GND, then fresh WHOLE checks and net/geometry preservation verification. Read live history to record final copper revision; #3655d151 predates logic-region copper and is NOT final board head.
  2. Safely remove true redundant stubs/duplicates; blind group deletion previously reopened valid paths. Resolve or explicitly justify each placement/decoupling/neckdown/mounting/antenna and schematic warning. Prior native power-stage missing-cap findings conflict with actual networks and need individual rail-aware disposition, not suppression.
  3. USB: full channel/reference/impedance qualification remains. Consider justified smaller-domain/segmented analysis or external SI; do not claim solved EM from a rejected runtime setup.
  4. Electrical/thermal desk calculations and source corrections are in power-thermal-release-assessment~et and power-budget~53. Physical thermal/stability/source/pack/harness qualification is not complete. Preserve charge inhibit.
  5. Candidate better-characterized LC: XAL6060-682MEC and GRM32ER71H106KA12L for C11/C16, with C17/C18 improvements considered separately. NO parts were replaced. Candidate footprint/height, lifecycle/library consistency, effective capacitance and assembly availability require verification. Existing C19+C20 are BOTH22uF (44uF nominal), so do not replace/add output caps based on the erroneous C19-only screen. Candidate changes were authorized if verified, not prohibited by advisory wording.
  6. EP paste U25/U9/U17 remains unchanged. Source-backed windows and dimensions in assessment; safe native paste-only windowing mechanism not established. Do not change copper/mask to fake paste. Smallest alternate may be assembler stencil aperture editing with exported verification.
  7. Q10 sensing0–18V requirement remains unresolved at low voltage; no safe ready-to-wire replacement architecture established. Do not bypass reverse/transient/off-state protection or silently lower requirement. USB diagnostic firmware has reduced-load states but no guaranteed battery-free ROM boot/flash current bound. U17 current limit reference is8.25kohm table point, installedR70=8.2kohm.
  8. No full hot fuse/source margin or battery/runtime guarantee. Power scenarios1.752/1.930/2.139A at90/85/80% assumptions; F1 continuous room-temperature allowance2.25A after derating, not3A. Keep pack/emulator-first acceptance gates.
Continuation mechanics and evidence ownership
Primary persisted build scope: executor5s, UID d77ae1e9-a9e8-4289-b109-68d51aaf379d, settled. Reuse for physical continuation; narrow finite regional briefs succeeded where broad completion briefs left work unattempted. Power advisory1u settled; review xp completed one independent review round. No need to repeat whole independent review after every fix; reconcile fresh deterministic checks and concrete fixes. Do not present internal names in user-facing summaries.
User's current instruction: https://cdn.flux.ai/project/chat/attachments/pasted-text-1792978976029-2fa0c53e-6244-4cd8-9b60-fcb7377f89a3 . Explicitly authorizes coordinated rework, temporary opens and component repositioning; preserves110×100mm/four-layer stackup/inner GND/real keepouts/net assignments/manufacturing clearances. Requests completion or exact demonstrated tool limits, not another support-only handoff. Respect targetedRoutingAllowed=false and campaign budgets; do not reset flags to bypass. Supported exact geometry edits closed U4/U25/logic regions.
Other records: pcb-routing-report~6l holds older milestones; top latest-at-time report still predates final regional closures. erc-source-path-dispositions~tp covers22 ERC instances without suppression. All exported board files above are diagnostic, not manufacturing-release files.
  • Stop condition — 26 October 2026

  • Before / latest verified result

  • Actual completed work

  • Immediate next action — U6 ground

  • Remaining design and qualification work

  • Continuation mechanics and evidence ownership