Electrical Verification


Routing requires Agent mode to inspect the updated PCB, check routing feasibility, route all nets, and verify remaining airwires/DRC.
Understood: routing only—no component placement or movement. Switch to Agent mode to route the existing placement and verify all airwires and routing DRC.
Continue in Agent Mode
I’ll preserve the current placement, run a routing feasibility check, route the board, then verify remaining airwires and routing DRC.
Auto-routing converged with the existing placement: all nets are routed. I’m running the final airwire and DRC verification now; no components were moved.
Board routing completed without moving components.
  • 0 airwires
  • 0 dangling traces
  • No routing-related DRC errors or warnings
  • Auto-router noted one skipped decoupling-routing preference on GND, but the net is fully routed and DRC-clean.
Review route quality
Clean up decoupling
Manufacturing readiness
Export fabrication files

ESP32 Dual Kelly Control Interface

ESP32 Dual Kelly Control Interface thumbnail