Copper Import Verification


import the copper from the reference design.
I’ll identify the imported reference block, preview the copper reconciliation, import the compatible traces/vias/fills, then run a layout check.
The ledger ID is no longer exposed, but the last verified copper-import state is intact in history. I’m restoring that exact state; only the subsequent revert and copper deletion will be undone.
Copper state restored. I’m checking imported object counts and the remaining layout warnings now.
The restored layout matches the prior import structurally. I’m confirming the exact outstanding connectivity warnings before closing.
Imported the reference copper in commit #4f7612e0: 75 trace segments, 14 vias, 3 polygons, and 1 ruleset.
  • Excluded: LED2, removed L1, and modified VSYS / Net 1
  • Open: 9 airwires and 2 dangling-trace warnings remain around the modified power path.
Restore path and verify
Restore reference inductor
Fix routing issues
Inspect power-path changes
Run complete DRC

R5
Resistance
240 Ω
C8
Capacitance
4.7uF
C7
Capacitance
10uF
C5
Capacitance
0.047uF
R1
Resistance
2.2kΩ
LED1
U1

BQ25606 Charger Reference

BQ25606 Charger Reference thumbnail