Redundant Traces Fix


The "Redundant Traces" review flagged a warning on Smart Via, Trace auto.
Reports traces and vias that no connection needs: copper that can be removed without disconnecting any pad, custom trace, fill, or polygon. This includes dangling stubs, floating trace islands, and loops.
Name: Smart Via, Trace auto; Net: BATTERY
Context: Reports traces and vias that no connection needs: copper that can be removed without disconnecting any pad, custom trace, fill, or polygon. This includes dangling stubs, floating trace islands, and loops.
Help me fix this.
I can fix this by locating the Smart Via / Trace auto copper on BATTERY, removing only the redundant stub/loop and rerunning the DRC to confirm connectivity remains intact. The warning isn’t currently reproduced by the read-only review, so I need Agent mode to inspect and edit the live PCB geometry.

Power Budget
Design basis
  • The MCP73831 charge current is programmed by R3 = 10 kΩ, using the datasheet relationship IREG = 1000 V / RPROG, giving 100 mA.
  • The provisional SMT-0927-S-HT-R sounder draws no more than 100 mA at rated voltage.
  • Allow 10 mA for the ATtiny202, light-sensor bias, and switching losses. This is a conservative design allowance rather than a measured operating value.
Rail budgets

Table


RailContinuous / peak design budgetNotes
USB_VBUS_RAW / USB_5V100 mA normal charge inputLoad is battery-backed; the charger remains connected when SW1 is off.
BATTERY110 mA alarm-on load, plus battery charge/discharge currentProtected 1-cell LiPo required.
VSYS110 mA peak design loadDominated by the sounder; switch rating has ample margin.
BUZZER_LOW100 mAAO3400A low-side path.
Protection sizing
F1 is a 0ZCK0020FF2G resettable fuse with 0.20 A hold, 0.50 A trip, and 9 V maximum rating, providing margin over the 100 mA charger input.
Open validation
The selected sounder is retained for this revision, but its datasheet minimum is only 95 dBA at 10 cm, so it does not establish compliance with the product target of greater than 100 dB at 10 cm.
  • Design basis

  • Rail budgets

  • Protection sizing

  • Open validation