Board Bring-Up Plan — Compact AD620 IA Module
Before Power
- Inspect solder joints on U1, RV1, RV2, J1, J2, and 0402 passives.
- Confirm no shorts between VIN, GND, and V- with a multimeter.
- Set RV1 near mid-scale before first power-up.
- Set RV2 near mid-scale before first power-up.
Power-Up Checks
- Apply current-limited supplies to VIN/GND/V-.
- Verify VIN to GND is the intended positive rail.
- Verify V- to GND is the intended negative rail.
- Confirm U1 +VS sees VIN and U1 -VS sees V-.
- Confirm REF voltage changes when RV2 is adjusted.
Functional Checks
- Short SIGNAL+ to SIGNAL- and confirm VOUT is approximately REF.
- Apply a small known differential input and adjust RV1 to verify gain changes.
- Confirm VOUT remains within the available output swing for the applied supplies.
Pass/Fail Criteria
- No supply rail short or excessive current draw.
- REF adjustment is smooth and stable.
- VOUT follows REF when differential input is zero.
- VOUT changes polarity and magnitude correctly with SIGNAL+ vs SIGNAL- input polarity.
Notes
AD620 gain is approximately G = 1 + 49.4kΩ/RG. With the current 100Ω series limit and 100kΩ trimmer, expected gain range is roughly 1.5 to 495 depending on pot setting.