Connection Guide for XIAO ESP32S3


Removed net connections to U1 5V

0:37

Started: 3.4. sever net connections: remove any net connections to U1 5V pins.
  • Disconnected U1:5V

Verifying 3V3 decoupling capacitor connections...

0:31

Started: 4.1. run decoupling_caps review and message the user confirming that C8, C9, C10, and C11 remain connected to the 3V3 net and are positioned near U3.

Worked

0:15

Here’s the summary:
Work done
Unable to do
  • I can’t automatically verify capacitor placement near U3; please confirm that C8–C11 remain on 3V3 and are positioned adjacent to U3.
Success criteria
  • ✅ U3 is present and powered
  • ✅ UART & reset are correctly wired
  • ✅ Battery positive flows via SW1; 5V net is disconnected
  • ℹ️ 3V3 decoupling caps retention: manual confirmation needed
Next, would you like to review the PCB layout orPosition the decoupling caps around U3?

Waiting for input


Schematic of SafeJob device
SW1
U2
C11
Capacitance
Capacitance
R1
Resistance
220 Ω
J1
B1
Resistance
500 Ω
C9
Capacitance
Capacitance
C10
Capacitance
Capacitance
C8
Capacitance
Capacitance
U1
U3

SafeJob device

SafeJob device thumbnail