Routing handoff
Latest settled routing report: added THT jumpers R25–R27 and completed seven successful targeted routes; saved airwires reduced 38 to 34. A6 and LED4 driver/anode paths routed. Report states all 378 traces Bottom, zero vias, fresh DRC only 34 airwire errors. Y1 remains blocked; failed Y1 jumper experiment removed. Detailed evidence and pending verification are in Layout Progress. Lead has not independently inspected final saved geometry in this session.
Constraints: 140 x 100 mm; six bit columns; keep working power/GND and traces. Bottom copper only, no vias. Signal 0.4 mm, power/GND 0.8 mm, clearance 0.3 mm. User authorizes properly net-split through-hole wire jumpers on component side at blockers. Preserve current-limiting resistors. No wholesale reroute/deletion.
Next: verify saved connectivity and R25–R27 continuity, power/GND intact, Bottom-only copper and zero vias; inspect remaining net/pin list and Y1 obstacle in Layout Progress before another attempt. Continue bounded routing batches with jumpers; fresh DRC/airwire checks before completion. PCB not fabrication-ready with 34 airwires. Execution stopped due to ACUs exhaustion.