The Phase 1 schematic and engineering package were substantially completed:
  • Expanded to 78 components and 42 nets
  • Added independent battery-temperature telemetry
  • Corrected the bulk capacitor, regulator inductor, and motor-connector selections
  • Selected low-cost JYC1027 ERM motors
  • Updated the power budget, BLE protocol, BOM, firmware starter, and bring-up plan
  • Added wireless compliance, safety-analysis, and preliminary FMEA files
  • Builder checks reported no electrical, passive, system, or schematic-legibility errors or warnings
The independent review executor finished, but I could not retrieve and reconcile its final findings. The schematic also remains visually crowded; electrical connectivity is complete, but functional-block organization still needs improvement before PCB layout.
We are effectively at the schematic-completion checkpoint, pending:
  • Reconcile the independent review findings
  • Apply any required corrections
  • Clean up the schematic canvas
  • Obtain your approval before PCB placement and routing
Execution stopped because your ACUs ran out.

Waiting for input


Board Bring-Up Plan
Safety and equipment
Use a current-limited bench supply, DMM, oscilloscope, SWD/J-Link probe, BLE phone/test client, temperature reference, four known-good 3 V ERM motors, protected 1S LiPo, resistance decade box or fixed resistors for NTC simulation, and thermal camera if available. Do not start with a battery connected. Do not connect motors until logic, charging, firmware, and failsafes pass.
Test-point map

Table


Test pointNetExpected use
TP1DOCK_5V_PROTECTEDProtected charger input
TP2BAT_PROTECTEDBattery/motor rail
TP3SYS_OUTBQ24074 power-path output/U2 input
TP43V3Regulated logic rail
TP5GNDGround reference
TP6BAT_ADCDivided battery ADC node
TP7I2C_SDASensor bus data
TP8I2C_SCLSensor bus clock
TP9SWDIODebug data
TP10SWDCLKDebug clock
TP11CHG_STATUS_NBQ24074 charge-status output
TP12PGOOD_STATUS_NDock/input power-good output
TP13BAT_TEMP_ADCIndependent battery-temperature divider node
1. Unpowered inspection
  1. Verify IC1, U2, U3, U4, U5, Q1–Q4, D1–D6, LED1, J1–J7 orientation and pin-1 marks.
  2. Confirm U3 antenna end has no copper, battery, motor wiring, enclosure metal, or ground pour in the module keepout region.
  3. Confirm D1 orientation: J1 pin 1 → D1 anode, D1 cathode → TP1/IC1 IN.
  4. Confirm D3–D6 cathodes face BAT_PROTECTED; anodes face H1–H4 switched nodes.
  5. Confirm Q1–Q4 source to GND, drain to switched motor return, and gate through R11–R14.
  6. Confirm J2 protected-LiPo polarity: pin 1 BAT_PROTECTED, pin 2 GND.
  7. Confirm J3/J4/J5/J6 are JST B2B-ZR(LF)(SN), each with exactly two contacts: pin 1 battery positive and pin 2 switched negative.
  8. Confirm C13 is KEMET T491C227K010AT case C, pin 1 positive to BAT_PROTECTED, pin 2 negative to GND.
  9. Confirm L3 is Bourns SRP2010-1R5M and TH2 is bonded to the battery independently of TH1.
Pass: no reversed polarized/active parts, no solder bridges, no damaged module antenna, and connector polarity documented on the assembly traveler.
2. Resistance and short checks
With all external connectors empty:
  • TP4 (3V3) to TP5: initially capacitor charging, then >10 kΩ after settling. Any stable value 10 kΩ** after settling.
  • TP2 (BAT_PROTECTED) to GND: >10 kΩ after settling; R9/R10 divider alone is 1.33 MΩ.
  • TP1 (DOCK_5V_PROTECTED) to GND: >10 kΩ after settling.
  • Each H1–H4 switched node to GND: MOSFET off; >100 kΩ is expected with no motor connected. Low ohms is fail.
  • J7 grounds pins 3/5/9 must have 4.7 V.
  • TP4 3V3: 3.20–3.40 V; target 3.30 V.
  • Input current before firmware: expected 10 °C above ambient within 30 s.
Increase limit to 150 mA only after TP4 is valid. Verify LED1 remains off or in a bounded firmware-defined state.
4. Regulator quality
At TP4:
  • DC value: 3.30 V ±3% (3.20–3.40 V).
  • Startup: monotonic, no sustained overshoot above 3.50 V.
  • Idle ripple: 0.9×3V3 and can be driven low by the probe.
  1. Firmware starts with all four gates low (100 mV after filtering.
8. I2C sensors
Use TP7/TP8 and firmware diagnostics.
  • U4 skin sensor: 7-bit address 0x3F.
  • U5 ambient sensor: 7-bit address 0x38.
  • Both WHOAMI registers at 0x01 must read 0xA0.
  • Idle bus high level: >0.8×3V3; low level: 0.9×3V3 only during the measurement and return below 0.2 V afterward. TP13 should be approximately 1.65 V at 25 °C with the 10 kΩ/10 kΩ divider. Use precision substitution resistors at TH2 pads: 28.7 kΩ ≈ 0 °C, 10.0 kΩ = 25 °C, 4.10 kΩ ≈ 50 °C. Pass: firmware within ±2 °C before calibration and bias off between samples. Open/short TH2 must set a telemetry fault and stop haptics, while charger TS behavior through TH1 remains unaffected.
9. RGB LED
LED1 common anode is on 3V3. Active-low controls are red P0.08/R19 680 Ω, green P1.08/R20 150 Ω, blue P0.11/R21 150 Ω.
Test each die individually at 10% then 100% commanded duty:
  • Correct color, no unintended other die.
  • GPIO low when commanded on and high when off.
  • No GPIO or resistor overheating.
  • Yellow produced by red+green PWM mixing.
Pass current targets are approximate because LED forward voltage varies: red about 1–3 mA and green/blue should be firmware duty-limited because a 3.3 V rail plus 150 Ω may provide little voltage headroom or strong unit-to-unit variation. The LED datasheet gives red Vf 1.6–2.4 V and green/blue 2.7–3.9 V at 20 mA.
10. Motor channels, one at a time
Connect one known-good motor at a time:
  • H1 J3, gate net from U3 P0.04 through R11/Q1, switched node HAPTIC_H1_SW.
  • H2 J4, P0.05 through R12/Q2.
  • H3 J5, P0.06 through R13/Q3.
  • H4 J6, P0.07 through R14/Q4.
For each channel:
  1. Battery 3.7 V, bench/current monitor in series, other motor connectors empty.
  2. Command 100 ms at 25% PWM, then 250 ms at 50%, then 500 ms at the firmware's battery-compensated 3 V-equivalent maximum.
  3. Verify only the requested motor runs.
  4. Gate high amplitude >2.8 V, gate low <0.2 V.
  5. MOSFET drain low during on-state, normally <0.15 V at the assumed 80–120 mA.
  6. Record running and startup current. Initial expected running range 40–100 mA and startup <150 mA; values outside this range require motor-datasheet review, not automatic acceptance.
  7. Check flyback waveform at drain; no excursion beyond device/rail limits and no MCU reset.
  8. Q1–Q4 temperature rise <10 °C for the bounded test.
Do not enable simultaneous channels until all four pass independently.
11. Peak and bulk-capacitance test
With four instrumented motors and a protected cell capable of ≥1 A:
  • Inject a service-only 100 ms four-channel pulse at 25%, then 50%.
  • Current limit must not trip below the expected measured sum.
  • TP2 droop must remain above 3.0 V and TP4 must remain above 3.20 V.
  • No U3 reset, I2C error burst, or charger latch-off.
  • Stop if total current exceeds 600 mA, any connector heats, or cell protection trips.
C13/C14 are noise/transient support only; the battery path must carry the surge.
12. BLE/protocol tests
  1. Write legacy 50 30: all motors off immediately.
  2. Exercise legacy N/E/S/W through the configured coordinate transform.
  3. Send valid V1 frames to H1/H3 and semantic LEFT/RIGHT on both wrist settings; verify H2/H4 swap exactly as specified.
  4. Duplicate sequence does not retrigger.
  5. Same sequence/different payload is rejected.
  6. Bad CRC, length, version, reserved field and out-of-range duration are rejected with motors unchanged/off.
  7. Telemetry battery voltage, skin, ambient, and TH2 battery temperature update at 1 Hz.
  8. Disconnect or short TH2: battery-temperature field becomes unavailable, fault bit sets, and haptics stop; charging safety remains governed independently by TH1/IC1 TS.
13. Failsafe tests
All are mandatory passes:
  • Disconnect BLE during motor operation: motor off within 50 ms after disconnect processing.
  • Stop refreshing command: motor off by 750 ms default expiry.
  • Request continuous motor: forced off by 2.0 s.
  • Exceed rolling 10 s/30 s duty limit: lockout and fault notification.
  • Pull reset low or trigger watchdog: all gates default low during reboot.
  • Battery <3.20 V for 2 s: haptic lockout; recover only above 3.35 V for 10 s.
  • Skin sensor ≥43 °C simulated/read: haptic lockout.
  • Ambient sensor ≥60 °C simulated/read: haptic lockout.
  • Insert dock during haptic: immediate stop; normal haptic writes rejected while TP12 indicates power good.
  • Corrupt/unset wrist configuration: lateral semantic commands rejected.
  • Sensor absent/stuck bus: safe stop after bounded retry count and fault telemetry.
14. Runtime acceptance
With a conditioned 650 mAh cell, run the representative profile used in the Power Budget: connected BLE, active telemetry, one 80 mA-class motor at 50% aggregate duty, LEDs only for brief status. Pass is ≥8 h; design target is approximately 10.4 h. Log battery voltage, current, resets, temperature, haptic on-time, and disconnects. Repeat on at least three cells and three assembled boards before claiming the target.
Remaining release dependencies
  • Validate JYC1027 motor mechanics, incoming-lot current, lead length, and JST-ZH harness termination.
  • Verify C13 surge/polarity robustness and L3 temperature/current margin on first articles.
  • Obtain Raytac's current certificate package explicitly covering the purchased MDBT50Q-1MV2 lot and complete final-product wireless, EMC, labeling, battery, and ingress testing.
  • Safety and equipment

  • Test-point map

  • 1. Unpowered inspection

  • 2. Resistance and short checks

  • 3. Current-limited dock power, no battery

  • 4. Regulator quality

  • 5. SWD and first firmware

  • 6. Charger without and with battery

  • 7. Battery ADC

  • 8. I2C sensors

  • 8A. Battery-temperature telemetry

  • 9. RGB LED

  • 10. Motor channels, one at a time

  • 11. Peak and bulk-capacitance test

  • 12. BLE/protocol tests

  • 13. Failsafe tests

  • 14. Runtime acceptance

  • Remaining release dependencies