EV5 wearable placement and 3D repair


Thanks - 20 of the 29 moves persisted. Nine did not: the rows you pasted for D1, R6 and FB1 contain values like 2.85mm !important, and the project layout still shows those parts (and six others) at the old positions. Please re-apply ONLY these nine with plain numeric values (board-local mm, Top; long axis as stated), then paste the project get_layout rows for them as proof, and re-run DRC:

Table


RefXYOrientation
C152.55-4.6keep current (long axis along x)
FB16.05-5.85long axis along y
D12.85-6.2keep current
L20.5-4.95keep current
R6-5.76.15long axis along y
TP2-3.352.75keep current
R43.754.3keep current (long axis along y)
C140.15-3.975keep current
R156.20.6keep current (long axis along y)
Nothing else moves. Keep the reply short.
I’ll reapply only those nine using plain numeric placement values, then verify the project readback before running fresh DRC. No other component or geometry will be touched.
Thought for 5 mins 52 sec
Thought for 8 sec
Awaiting 1 background task
"PCB Geometry Corrections" completed.
The nine-part write is complete. I’m now checking the committed project rows directly and reconciling the fresh DRC before closing.
All nine positions now read back correctly:

Text


D1   2.85, -6.2     0°
C14  0.15, -3.975   0°
R6  -5.7,   6.15   90°
R15  6.2,   0.6    90°
R4   3.75,  4.3    90°
C15  2.55, -4.6     0°
L2   0.5,  -4.95    0°
FB1  6.05, -5.85   90°
TP2 -3.35,  2.75    0°
Fresh DRC: one copper overlap, R4–C10. Body/clearance pairs: C11–R4, C16–C13, C17–R11, C8–C15, C9–C15, C9–C8, D1–FB1, J2–C10/C11/C12/R4/U2, L2–FB1, R12–U3, R13–U3, and R4–C10.

Power Domain Design Report
Scope status
  • Completed: dock-input electrical interface; series reverse-polarity blocking; resettable fault-current limiting; low-leakage TVS clamp; exact BQ25120AYFPR charger/power path; protected-pack B+/B-/NTC interface; PROTECTED_5V, VBAT_PROT, VSYS, 1V8, and single GND; 1.8 V buck support; LS/LDO controlled output; host stubs; charge/input/termination programming; ERC and schematic-legibility review.
  • Incomplete / blocked: production TS bias resistor values require the protected pack's NTC resistance curve, required hot/cold thresholds, and final PCM/pack wiring. R8/R9 are wired as provisions but set TBD and excluded from BOM. Schematic visual placement is not cleanly arranged because the available mutation API had no schematic-arrangement operation; connectivity and automated legibility checks are clean, but the rendered sheet remains spatially scattered.
  • Not attempted by instruction: PCB board sizing, stackup, physical placement, routing, or any non-power functional block.
Selected parts and packages

Table


RefSelected partPackage / footprintPurpose
U1Texas Instruments BQ25120AYFPR25-ball YFP DSBGA1S charger, power path, buck, LS/LDO. Exact required orderable MPN; YFP is the 25-pin DSBGA package.
F1Bel Fuse 0ZCM0008FF2G0603 / 1608 metric, 0.35–0.75 mm high80 mA hold, 200 mA trip resettable PTC; 15 V rated, 2.8 Ω initial resistance.
D1Nexperia PMEG2010AEBFSC-79 / SOD-523, about 0.6 mm highSeries reverse-polarity Schottky; 20 V, 1 A.
D2Nexperia PESD5V0S1BB,115SC-79 / SOD-523, 1.2 × 0.8 × 0.6 mm5 V TVS/ESD clamp; 5 nA typical/100 nA max leakage at 5 V.
L1Samsung Electro-Mechanics CIGT201610LH2R2MNE0806 / 2016 metric2.2 µH shielded buck inductor, 1.8 A, 139 mΩ max DCR.
J1Molex 05339840022-position 1.25 mm SMT headerSchematic-only electrical stand-in for the two custom flush dock pads. It is not a commitment to place this connector on the PCB.
J2TE Connectivity 292448-13-position SMT spring battery contact connectorProtected pack interface. Pins 1/2/3 are used as B+/B-/NTC; library terminals 4/5 are no-connect mechanical terminals. Final mating and height fit remain to be verified.
R1–R10Generic resistors0201 / 0603 metricProgramming, pull-ups, control defaults, TS provisions. R10 is the 100 kΩ BQ_CD pull-up to VBAT_PROT.
C1–C4, C6–C7Generic ceramic capacitors0402 / 1005 metricInput, PMID, battery, VINLS, and LS/LDO support.
C5Generic ceramic capacitor0603 / 1608 metric10 µF 1.8 V buck output capacitor.
Rail topology
  1. Dock positive enters at J1 and passes through F1 and D1. D2 clamps the post-diode node to GND. That protected node is exactly PROTECTED_5V and feeds U1 IN plus the IN bypass capacitor.
  2. U1 PMID is the high-side bypass/power-path node. With valid input, input current is shared at PMID among charging and system loads; the battery can supplement system demand when the input limit is exceeded. Therefore PMID is named exactly VSYS.
  3. The protected external pack positive J2.1 connects only to U1 BAT and C4, forming exactly VBAT_PROT. J2.2 is the single GND. No on-board protection FETs or bypass path around the external PCM were added.
  4. U1 SW drives L1; the far side of L1 connects to U1 SYS sense and C5, forming exactly 1V8. The BQ25120A SYS pin is a system-output sense input and is connected to the buck output after the inductor, not to the raw power-path node.
  5. U1 VINLS is fed from VSYS. U1 LS/LDO output is AUX_LS_LDO and is controlled by LS_LDO_EN. It defaults off through R7. The future host must program the desired LDO voltage or pass-through/load-switch mode before enabling it.
  6. VBAT_PROT is already exposed as a named net stub for the future haptic driver. The haptic provision has no connection to VSYS/PMID or PROTECTED_5V.
Power and current budget
The supplied simultaneous modeled instantaneous loads total 46 mA at their load rails: 15 mA voice + 3 mA status + 3 mA reconnect + 25 mA haptic. For dock-input sizing, the 25 mA haptic load was reflected from a nominal 3.7 V battery to 5 V (about 18.5 mA ideal), and the remaining 21 mA was conservatively treated as 1.8 V buck load at 90% efficiency (about 8.4 mA at 5 V). Adding 10 mA charge current and about 1 mA allowance for PMIC/conversion losses gives an estimated ~38 mA dock draw.
  • U1 ILIM is set to approximately 50–51 mA with R2 = 3.92 kΩ, 1%. TI Table 4 gives 48.47 mA minimum, 51.02 mA typical, and 53.57 mA maximum for 3.92 kΩ. This coordinates the hardware input limit below F1's 80 mA hold rating at 23°C.
  • F1's 80 mA hold rating is just over 2× the modeled ~38 mA dock draw. Its initial drop is approximately 0.11 V at 38 mA. This is intentionally compact and zero-Iq, but it has less hot-temperature margin than a larger/higher-current PTC.
  • D1 drop is bounded by the datasheet values of up to 190 mV at 10 mA and 290 mV at 100 mA.
  • The BQ25120A IN pin tolerates up to 20 V absolute maximum and internally disconnects on input OVP at 5.35–5.75 V (5.55 V typical). D2 provides transient clamping, not precision 5.5 V regulation: its 5 V standoff part has 10 V maximum clamp at 1 A.
Charge configuration
  • Nominal fast-charge current: 10 mA, set by R1 = 20 kΩ from ISET to GND using RISET = KISET / ICHG with nominal 200 AΩ.
  • Precharge and termination: 10% of ISET (~1 mA nominal), set by R3 = 4.99 kΩ from IPRETERM to GND.
  • Change the current later by replacing R1 in default/external-programming mode, or by writing the charger register in host mode. Do not assume the resistor continues to govern once host-mode register control overrides external programming.
  • 10 mA is approximately 0.27 C for the modeled 37.5 mAh usable capacity. This is a conservative provisional choice only; it is not validated by VARTA for CP1240 A4X with BQ25120A. Charge regulation voltage, recharge threshold, temperature policy, and termination behavior must be confirmed against the cell vendor's approved profile before release.
Host-control nets
  • I²C: SDA, SCL with 10 kΩ pull-ups to 1V8. TI's pin guidance specifies 10 kΩ pull-ups to the logic rail.
  • Interrupt: BQ_INT, open-drain with 10 kΩ pull-up to 1V8; INT is the charge/fault interrupt output.
  • Charger/chip control: BQ_CD remains exposed and is pulled to VBAT_PROT by R10 = 100 kΩ. With battery only, high selects Active Battery; with valid VIN, high disables charging, while low enables charging. Thus the deliberate default is operational while undocked and charge-inhibited while docked until the future host actively pulls BQ_CD low.
  • Load-switch/LDO control: LS_LDO_EN. LSCTRL high enables and low disables the LS/LDO output.
  • Separately controlled output: AUX_LS_LDO.
Support components
The BQ25120A typical application requires external ISET, ILIM, and IPRETERM resistors; a 2.2 µH buck inductor with 10 µF output capacitance; at least 1 µF at IN; at least 3 µF effective at PMID; at least 4.7 µF effective at the buck output; 1 µF effective at VINLS and LS/LDO; and at least 1 µF at BAT. Nominal capacitances were increased where needed for MLCC DC-bias loss.
Conflicts, assumptions, and unresolved checks
  1. VSYS naming versus TI pin name: TI calls the buck-sense pin SYS, while the actual power-path bypass node is PMID. The required VSYS name was assigned to PMID and the required 1V8 name to the post-inductor buck output. This preserves both the user's semantic rail names and the TI topology.
  2. Buck configuration: the SYS VOUT register at 0x06 controls the buck and its enable. Available datasheet extraction indicates the reset field corresponds to 1.8 V, but that field decoding was not machine-verified. Firmware should explicitly write/read back the 1.8 V setting rather than rely solely on reset state.
  3. LS/LDO output voltage unspecified: the schematic exposes a safely disabled rail but does not invent a voltage. Firmware and the next-stage load requirements must select LDO voltage or pass-through mode before enabling.
  4. TS network blocked by missing pack facts: U1 TS is connected to the protected pack's NTC terminal, with R8 upper bias and R9 lower/linearization provisions. TI requires TS at the divider center and the pack NTC from TS to GND. The resistor equations require the NTC resistances at the selected hot and cold limits. Those facts were not supplied, so R8/R9 are deliberately not production values. Charging must not be released until they are calculated and validated.
  5. Routine cutoff: no on-board battery protector was added. BQ_CD is exposed so a future host can request BQ high-Z above the external PCM's undervoltage trip. The complete cutoff/recovery strategy still depends on MCU brownout thresholds, firmware, wake sources, and the selected PCM.
  6. Dock interface: J1 is only an electrical stand-in. The required flush exposed pads need custom PCB copper/contact geometry in a later PCB-layout stage; that work was explicitly out of scope.
  7. Pack connector mechanics: J2 is a real three-contact battery connector, but its exact height/mating suitability and the mapping of library mechanical pins 4/5 require later mechanical verification. No cell, holder, or PCM was added.
  8. TVS behavior: D2 meets low-leakage and transient-clamp goals, but it is not a precision crowbar. Sustained dock overvoltage is handled primarily by U1's internal OVP disconnect plus F1; dock source fault testing remains required.
Verification evidence
  • Full ERC and schematic-legibility review returned no open errors or warnings after wiring and no-connect marking.
  • Required named nets exist and are connected: PROTECTED_5V, VBAT_PROT, VSYS, 1V8, GND, SDA, SCL, BQ_INT, BQ_CD, LS_LDO_EN, and AUX_LS_LDO.
  • U1 unused PG_N, RESET_N, and MR_N, plus J2 mechanical terminals 4/5, are explicitly no-connect.
  • No PCB mutation, placement, board sizing, stackup, or routing operation was performed.
Independent verification reconciliation
  1. ILIM coordination corrected: R2 changed from 2 kΩ to 3.92 kΩ, 1%, 0201. The resulting external hardware limit is about 50–51 mA typical (48.47–53.57 mA across the datasheet programming constant), rather than 100 mA.
  2. CD startup policy corrected: R10 = 100 kΩ, 1%, 0201 was added between BQ_CD and VBAT_PROT. BQ_CD remains the future host-control stub. Default high means Active Battery when undocked and charging disabled when docked; the host must pull low to charge.
  3. MR intentionally floating: U1 MR_N/E1 has an explicit no-connect marker and no external resistor. The MR input has an internal pull-up to BAT, specified as 120 kΩ typical.
  4. Protected-pack boundary preserved: J2.1 remains the sole board entry to VBAT_PROT, J2.2 remains the protected return on GND, and J2.3 remains the PACK_NTC_TS path. No raw-cell, PCM-bypass, or additional pack-entry net was introduced.
First-power validation checklist
  1. Populate neither R8 nor R9 until the NTC/pack data is approved; do not enable charging without a validated TS network.
  2. Apply a current-limited 5.0 V dock source and verify polarity-blocking and PROTECTED_5V voltage.
  3. Verify U1 rejects a slowly raised input above its OVP threshold without exceeding device thermal limits.
  4. Verify VSYS on dock only, battery only, and dock-plus-battery.
  5. Program and read back the 1.8 V buck setting, then verify 1V8 unloaded and under modeled pulse loads.
  6. Confirm charge current near 10 mA and termination/precharge near 1 mA only after cell-vendor approval.
  7. Validate BQ_CD behavior separately for dock-present and battery-only states.
  8. Program and verify the intended LS/LDO mode before asserting LS_LDO_EN.
  9. Confirm normal system cutoff occurs above the external PCM undervoltage trip and that recovery/wake behavior is deterministic.
  • Scope status

  • Selected parts and packages

  • Rail topology

  • Power and current budget

  • Charge configuration

  • Host-control nets

  • Support components

  • Conflicts, assumptions, and unresolved checks

  • Verification evidence

  • Independent verification reconciliation

  • First-power validation checklist