Drone Autonomy Spec


flux

Escalated internally to the Flux engineering team with:
  • Compute Vision Board link
  • HTTP 524 preflight failures
  • Partial auto-route corruption
  • Airwire increase from 247 to 442
  • Ground-fill/stitching-via corruption when applying routing rules
  • Clean recovery commit c52f37c6
  • Current safe board state
For a human support case and status follow-up, use Contact Support and reference the KRYSTAL Compute Vision Board routing/rules corruption issue.
write a reportwith all info for a new engineer to take over the PCB and fix it.

flux

I’ll create a structured takeover report covering both boards, architecture, completed work, current live state, known blockers, recovery history, verification gates, and the exact order a new engineer should follow.

flux

Created the comprehensive PCB Engineering Takeover Report.
It covers:
  • Both project links and board responsibilities
  • Current CM5 and S32K344 architecture
  • Power, camera, radar, autopilot, Wi‑Fi, FHSS and SIYI interfaces
  • Board dimensions, stackups and enclosure direction
  • Completed fixes and verified checks
  • Routing-service failure and recovery history
  • Known footprints, software and regulatory risks
  • Recommended takeover sequence
  • Fabrication-release gates
  • Immediate first-day checklist and required engineer deliverables
The report clearly marks both boards HOLD for fabrication until routing, interface freeze, DRC, thermal, software and mechanical validation are complete.
Review takeover report
Audit live board states
Prepare migration package
Freeze external interfaces

Board Bring-Up Plan — KRYSTAL Two-Board System
Status
Draft for engineering review. Update after final routing/BOM freeze.
Prerequisites
  • Current-limited 0–40 V bench supply, DMM, oscilloscope, thermal camera, CAN FD adapter, Ethernet tester, JTAG/SWD debugger, programmable load.
  • Never connect the drone battery, autopilot, radar, cameras or SOM before resistance and current-limited rail checks pass.
  • Begin at 12 V with a conservative current limit; validate 9 V and 16.8 V only after nominal bring-up.
Base/Safety Board
1. Visual and Resistance Checks
  • Inspect J1, F1, D1, U1, Q1, U2, U13 and U14 orientation and soldering.
  • Inspect all exposed-pad/QFN thermal areas for bridges.
  • Measure resistance from VIN_RAW, VIN_MAIN_PROT, COMPUTE_VIN_PROT, RADAR_PWR_SW_TBD_9_36V, 5V_CAN_LOCAL and 3V3_AON to GND.
2. Power Sequence

Table


RailSourceExpectedInitial current-limit guidancePass criterion
VIN_RAWJ19–36 V0.2 A before loadsNo abnormal draw or heating
VIN_MAIN_PROTU2Approximately applied VIN0.5 ACorrect enable/fault behavior
3V3_AONU33.3 V0.5 AWithin ±5%, stable ripple
5V_CAN_LOCALU115.0 V0.5 AWithin ±5%, stable ripple
5V_AP_PROTECTEDU125.0 V when enabled0.1 A initiallyCurrent limiting and fault report operate
COMPUTE_VIN_PROTU13Protected aircraft busElectronic load onlyCurrent limit, PGOOD, IMON and shutdown verified
RADAR_PWR_SW_TBD_9_36VU14Protected aircraft busElectronic load onlyCurrent limit, PGOOD, IMON and shutdown verified
3. Safety Controller
  • Verify reset/debug connector J2 continuity before attaching debugger.
  • Read S32K344 device ID, flash a minimal safety test image and confirm watchdog servicing.
  • Stop watchdog servicing and verify EFUSE_EN is forced inactive.
  • Verify fault/PGOOD/current-monitor ADC channels with known injected states.
4. Interfaces
  • CAN1/CAN2 loopback and termination checks.
  • MAVLink UART loopback at J7; verify logic levels and no back-power when autopilot is off.
  • RS-485 half-duplex loopback and TVS leakage check.
  • ADS1232 load-cell zero/span test with calibrated bridge simulator.
  • LoRa module basic UART and RF self-test only after approved antenna/load is connected.
Compute/Vision Board
1. Power Sequence
  • Bring up protected input first without SOM, cameras or radio module fitted where assembly options allow.
  • Verify 5V_SOM, 1V0_GMSL, 1V2_GMSL, 1V8_GMSL, 2V5_ETH and RADIO_3V3 in dependency order.
  • Check LM5148 switching nodes and MOSFET temperature under stepped loads.
2. SOM and Network
  • Install Verdin module only after 5 V rail load test passes.
  • Confirm boot, console, eMMC, Wi-Fi region configuration and Ethernet link.
  • Verify base-board Ethernet and independent SIYI Ethernet separately.
3. Cameras and Guidance Inputs
  • Verify GMSL lock for each camera independently before dual-camera operation.
  • Confirm I2C configuration, frame rate, exposure, timestamps and synchronized frame capture.
  • Validate front/down camera calibration and dropped-frame detection.
  • Verify mmWave radar link, packet rate, timestamps and fault handling using the final selected radar.
4. Swarm Radio
  • Populate only the approved Singapore-region 917–925 MHz module and antenna combination.
  • Verify region lock, hopping configuration, conducted/EIRP settings, authentication, encryption and replay protection.
  • Run coexistence tests with Wi-Fi, SIYI and 2.4 GHz safety radio active.
System Tests
  • Remove Linux heartbeat and verify safety-controller response.
  • Interrupt CAN, Ethernet, camera, radar, FHSS and primary GCS links individually and verify defined degraded/failsafe behavior.
  • Run simultaneous dual-camera capture, radar ingest, SIYI stream and swarm messaging while monitoring CPU/NPU load, memory, packet loss, rail ripple and enclosure temperature.
  • Test GPS-denied guidance in simulation/HIL before tethered and controlled flight tests.
Environmental Tests
  • Sealed-enclosure thermal soak at worst-case ambient and maximum compute/radio workload.
  • Condensation/humidity cycling, ingress test target, vibration sweep and connector retention test.
  • Inspect conformal coating coverage and keep coating out of connectors, pressure vent, RF contacts and thermal interfaces.
Release Rule
A failed power, routing, interface, thermal, RF or failsafe test blocks flight deployment and requires documented corrective action.
  • Status

  • Prerequisites

  • Base/Safety Board

  • 1. Visual and Resistance Checks

  • 2. Power Sequence

  • 3. Safety Controller

  • 4. Interfaces

  • Compute/Vision Board

  • 1. Power Sequence

  • 2. SOM and Network

  • 3. Cameras and Guidance Inputs

  • 4. Swarm Radio

  • System Tests

  • Environmental Tests

  • Release Rule