Project Start


flux

I started the full wiring pass and made real schematic changes, but I’m blocked now because there are no available ACUs, so I can’t continue executing mutations or ERC cleanup.
What was completed:
  • Added support passives for USB VBUS, eFuse, AP63203 buck, isolated power filtering, LDOs, MCU decoupling, isolated I2C pull-ups, SRC4392 decoupling, clock decoupling, reset, and AES3 termination.
  • Wired USB-C VBUS/GND, USB D+/D− with ESD, CC1/CC2 to TUSB320, TPS25210 eFuse, AP63203 3.3 V buck, and TUSB320 power/config/I2C.
  • Datasheet check found an important correction: AP63203 is fixed 3.3 V, so the added FB divider must be removed and FB tied to the 3.3 V output sense.
  • Datasheet check also confirmed RT1024 needs internal DCDC support: 4.7 µH inductor, 33 µF output cap, and delayed DCDC_PSWITCH assertion.
Open items:
  • Remove AP63203 FB divider R4/R5 and tie U5 FB to 3V3_MCU.
  • Change AP63203 inductor L1 from 2.2 µH to 3.9 µH.
  • Add/wire RT1024 internal DCDC parts and 24 MHz MCU clock source.
  • Finish MCU power/reset/debug, isolation barrier, SRC4392, clocks, AES3 transformer/XLR wiring.
  • Run ERC and fix both electrical issues and schematic-wire collision/label cleanup once ACUs are available.
Continue, decide whats to do

flux

I’ll continue from the partial wiring, make the necessary regulator/MCU corrections, complete each functional block, then run ERC and iterate until only intentional warnings remain.
Received notification from "AES3 USB Schematic" that it finished — picking the work back up.

flux

The schematic executor completed, but I can’t inspect/reconcile its report or run the independent ERC verification because no ACUs are currently available.
Current state:
  • The full-schematic completion task was dispatched with the fixed isolation, dual-clock, power, MCU, SRC4392, and AES3 requirements.
  • The executor reports completed, so its changes should now be present in the project.
  • Still required: independently inspect the committed wiring, review remaining ERC findings, verify no accidental isolation-barrier connection exists, and confirm clock/I2S timing and AES3 termination before proceeding to PCB layout.
Inspect schematic changes
Verify isolation barrier
Check clocks and I2S
Review AES3 termination

J1
Y2
U1
U5
C3
Capacitance
10nF
C1
Capacitance
10uF
C5
Capacitance
10uF
PS1
R1
Resistance
20kΩ
J4
U6
D2
L1
Inductance
2.2uH
U8
U7
U10
Y1
U3
U11
D1
U4
U9

AES3-USB

AES3-USB thumbnail