Getting Started with Flux


હું saved routing જાળવી પહેલાં IMU/USB blockersનું છેલ્લું પરિણામ વાંચીશ અને શક્ય સુધારા projectમાં સાચવીશ. Flight-ready જાહેર કરવા physical board પર props-off tests જરૂરી છે; અહીંથી વાસ્તવિક flight test કરી શકતો નથી.
Thought for 12 mins 32 sec
Thought for 14 sec
Checking routing progress.
Thought for 15 sec
Awaiting 1 task
retry fast
હું છેલ્લો routing પ્રયાસ ક્યાં અટક્યો તે વાંચીને ફરી પ્રયાસ કરીશ; સફળ ફેરફારો projectમાં સાચવીશ અને પછી fresh checks કરિશ.
Thought for 9 mins 42 sec
Thought for 14 sec
Checking routing progress.
Thought for 14 sec
Awaiting 1 task
Created a thread
"Bounded PCB Routing Repair" completed.
Retry સફળ થયો: 9 routing સુધારા Flux projectમાં save કર્યા છે; fresh checkમાં airwires 104થી 76 થયા. બાકી 3V3 branches જોડાઈ છે અને protected USB copper જાળવ્યું છે.
હજી USB, કેટલાક IMU/motor/UART અને sensing connectionsનું routing બાકી છે; પછી fresh ERC/DRC અને hardware safety tests જરૂરી છે—board હજી flight-ready નથી.

Bounded Routing Repair Results
Latest bounded retry — 2026-10-10 13:10 UTC
1. Connectivity and DRC findings
This section supersedes the historical counts below. Live initial airwires: 104. Final fresh routing_state: 76, a reduction of 28. Initial Design Rule Checks Error/Warning filter:105 findings =104 airwire Errors and one redundant-trace Warning. Final fresh filter at13:10:19Z:77 findings =76 airwire Errors and the same one Warning; zero other DRC Errors in that category. Placement/ERC findings were not included in these counts. Nine successful routing calls saved all new copper; five additional calls failed atomically, with no failed connection retried. No convergence block was returned by these calls; fresh checks confirm improvement.

Table


Assigned itemStatusSaved result
Remaining 3V3 branchesCompleted13 island joins; no remaining 3V3 airwire, including D3–D7, R26/R27/R36, J2:1 and U1:VDD3
FLASH_CSCompletedR3:P1, U1:PC12, U3:/CS joined;2 airwires removed
FLASH_MISOCompletedU1:PB4 to U3:DO_(IO1);1 removed
FLASH_MOSICompletedU1:PB5 to U3:DI_(IO0);1 removed
IMU_INTCompletedU1:PC4 to U2:INT1/INT;1 removed;28.315mm route
I2C1_SCLCompletedU1:PB6, J6:4, R26:P1, D6:I/O3;3 removed
I2C1_SDACompletedU1:PB7, J6:5, R27:P1, D6:I/O4;3 removed
UART6_TXCompletedJ6:1, R23:P2, D6:I/O1;2 removed
UART6_RXCompletedJ6:2, R24:P2, D6:I/O2;2 removed
FLASH_SCKFailedU1:PB3 to U3:CLK: blocked-no-path
IMU_CSFailedU1:PA4 to R4:P1 and U2:AP_CS: batch rejected because it would introduce6 Airwire errors; no mutation applied
IMU_MISOFailedU1:PA6 to U2:AP_SDO/AP_AD0: blocked-no-path
IMU_MOSIFailedU1:PA7 to U2:AP_SDA/AP_SDIO/AP_SDI: blocked-no-path
UART6_RX_MCUFailedU1:PC7 to R24:P1: batch rejected because it would introduce2 Airwire errors; no mutation applied
Other remaining nets, USB repair, placement edits, full-board autoroute, EM and ESCUnattemptedOutside this selected bounded pass; not claimed blocked merely because unrouted
Exact obstruction evidence from router:
  • FLASH_SCK cheapest path crosses Q1:S/GND on Top, FLASH_MOSI trace 352f8c0d-8989-4260-80d5-7d3dba124b77 on Top, and R36:P1/USB_VBUS_PRESENT_N on Bottom. Candidate transitions near(2.05,8.82) and(9.55,18.27)mm; zero off-board distance. Moving just one component is not established as sufficient.
  • IMU_MISO crosses R33:P2/ADC_CURRENT Bottom; C7:P2/GND Bottom; U1:PA5 and IMU_SCK traces 94856aed-5d6e-4ad4-8850-5f8f764eda57, ede3c0b8-a5c1-4209-9ba2-75b59af24de9, 48bd30ac-b7c3-4b41-b6cf-a86b5c3b2f7c Top; IMU_INT traces 5c123647-def7-49d0-9b17-7d88adae058c, 0570ece0-7e9d-4065-9273-898699ccf129 Top; its own endpoint pads also obstruct proposed vias. Candidate transitions(-1.225,-5.895),(-1.375,-7.020)mm; zero off-board distance.
  • IMU_MOSI crosses the same R33:P2, C7:P2 and three IMU_SCK traces, U1:PA5 and U1:PA6 Top, and IMU_INT traces 5c123647-def7-49d0-9b17-7d88adae058c, 4d64845e-e327-4714-8fae-a96c83bb768c, e730e388-4e8c-43b1-9d06-d826a08d89e7 Top. Candidate transitions(-1.25,-5.895),(-1.325,-6.495)mm; zero off-board distance.
  • IMU_CS and UART6_RX_MCU rejection reports did not identify the newly disconnected pins; the precise underlying cause remains uncertain and requires inspection rather than a blind retry.
  • Preflight returned four USB differential-pin feasibility Warnings: two D2 I/O1/I/O2 pad pairs and J1 DP1/DN2, DP2/DN1. No USB change attempted. These warnings remain unresolved, not fresh evidence of a non-USB routing blocker.
Board39x39mm, four-layer JLC3313 stackup, ground-plane layer purposes, manufacturing limits, component placement and netlist were unchanged. Existing design-rule trace widths were used, same-net via-pad clearance was copper-clearance, and no errors were suppressed. Protected USB group 52889a90-0993-479b-a194-07d0cdca310b, 5cc73652-28d0-412e-8a22-5eaa03641ad1, ce236b62-82d0-41ea-8e92-443aaf72f9d0 was preserved deliberately. ESC was untouched.
2. Routed critical nets
  • USB_DP: partial protected breakout retained; stub ce236b62-82d0-41ea-8e92-443aaf72f9d0 to U1:PA12 still unrouted; USB differential class.
  • USB_DM: partial protected breakout retained; stub 70ae3707-2978-46fb-873b-2d63976e6d7c to U1:PA11 still unrouted; USB differential class. EM check available now: Zdiff of the retained USB breakout geometry (5 to20 minutes per run); an end-to-end pair qualification requires completed routing. No EM values or signal-integrity qualification were obtained in this pass.
3. Repair plan and feasibility
Further routing is feasible in principle:28 airwires were eliminated without moving anything or weakening rules. The remaining76 are not all proven blocked. Before retrying the five failed items, inspect local geometry and repair the specific escape obstacles; consider minimally moving R33/C7 or Q1/R36 only after verifying all affected copper. Preserve successful copper; route still-unattempted low-speed connections separately. For any proposed IMU clock/interrupt reroute, verify its connectivity and timing afterward. USB repair remains a separate protected-pair task and its EM check must be repeated after a reroute. Do not repeat rejected batches without finding why they would create new airwires. This bounded batch is complete, not the PCB; no manufacturing/flight readiness or physical testing is claimed.
Scope and evidence — 2026-10-10
This batch used live project state, not the unavailable prior thread. Initial routing_state: 125 airwires, not historical147. Initial DRC/placement review at12:21:07–12:21:23Z:125 airwire Errors, four component-body overlap Warnings, one density Warning, one redundant group containing three USB-related segments. Preflight returned four USB differential-pin feasibility Warnings, not historical three. No non-USB pin-removal anomaly was returned.
Nine successful surgical route mutations were saved. Ten distinct connections were selected; the tenth failed twice and was stopped. No full-board autorouter, placement change, board/stackup edit, manufacturing-rule change, schematic edit, copper deletion, or USB routing mutation was performed. Existing USB copper, including the three reported redundant segments, was deliberately retained under the protected-copper instruction. USB findings remain a gate for bulk/USB routing, not proof that the independent MCU-supply connections were blocked.
Saved connections
All nine completed entries are on 3V3, with0.25mm trace width and one new through-via per tool result. Existing0.55mm via pad/0.25mm drill and manufacturing clearances were retained; same-net via-to-pad policy was copper-clearance (no via-in-pad).

Table


ItemRequested terminalsStatusAdded length (mm)Airwires afterward
1U4:VOUT — C17:P1Completed9.553124
2U1:VDDA — C9:P1Completed7.776123
3U1:VBAT — C8:P1Completed3.269122
4U1:VDD1 — C1:P1Completed8.189120
5U1:VDD2 — C2:P1Completed2.984119
6U1:VDD3 — C3:P1Completed2.834118
7U1:VDD4 — C4:P1Completed3.062117
8C17:P1 — C8:P1 islandCompleted5.792116
9C9:P1 — C11:P1 islandCompleted5.166115
103V3_IMU trace1cc7cb3a-b335-48bd-a319-ba5c0b18e1c4 — trace5aeb5ee8-fbaf-43ec-8e48-37675be71881Failed: two blocked-no-path attempts0115
Item4 also merged an additional existing same-net island: nine route calls removed ten airwires. The traces connect the requested islands, sometimes using a nearer point on their existing copper rather than the named pad center. Connectivity success does not qualify decoupling inductance, regulator stability, thermal performance, or the still-incomplete rail distribution.
Layer strategy matched the specification: Top0°, Bottom90°; Mid-Layer1/2 remain GND planes. Critical-net preferences passed unchanged: USB_DP/DM, HSE_8MHZ, IMU_SCK/MOSI/MISO/CS/CLKIN and FLASH_SCK/MOSI/MISO/CS on Top.
Failed item10: exact blockers and next decision
The requested fixed trace endpoints are Bottom(0.775,-8.000) and Top(1.165,-8.750), width0.15mm. Neither attempt timed out; both reported a via escape obstructed by pads, with zero off-board path length. No mutation was saved by either failed call.
First attempt blockers:
  • U2:INT2/FSYNC/CLKIN, IMU_CLKIN, Top: f999d062-d315-425e-8c1a-6ac4b557b85e__bc26a577-8602-49ba-bdc9-c92d93298eba
  • U2:RESV_7, GND, Top: f999d062-d315-425e-8c1a-6ac4b557b85e__6988d491-5c47-427a-8d42-2f84235a09fa
  • C13:P1,3V3_IMU, via collision: 5de397e9-376b-495b-a835-c85bfa60dc33__5237503d-4662-b83a-7859-31969858b9c0
  • U2:VDD,3V3_IMU, via collision: f999d062-d315-425e-8c1a-6ac4b557b85e__dee82735-fcde-4c62-9094-857ce91eb7e2
First required route outlines (mm; obstruction evidence, NOT saved copper):
  • Bottom: 0.475,-7.7 0.475,-8.675 0.351,-8.375 1.075,-9.099 1.499,-8.675 1.075,-8.251 1.075,-7.7
  • Top: 0.651,-8.675 1.15,-9.174 0.85,-9.05 1.465,-9.05 1.465,-8.45 1.274,-8.45 1.075,-8.251
Second attempt used a call-local, nonpersisted Bottom keepout 0.45,-9.4 1.7,-9.4 1.7,-8.3 0.45,-8.3 to force a transition outside that blocked direct escape, without weakening rules. It remained blocked at an alternative transition near(0.325,-6.575):
  • U2:AP_CS, IMU_CS, Top: f999d062-d315-425e-8c1a-6ac4b557b85e__6dbecff8-b79f-4835-9498-6aab533fb0e4
  • U2:AP_SCL/AP_SCLK, IMU_SCK, Top: f999d062-d315-425e-8c1a-6ac4b557b85e__f4efbe0b-ac11-4dd9-953b-c68d12d49226
  • R33:P1, CURRENT_DIVIDED, Bottom; R33:P2, ADC_CURRENT, Bottom (router supplied these exact node labels; full UUIDs not needed for this unapproved move).
Second required route outlines:
  • Bottom: 1.199,-8 0.625,-7.426 0.625,-6.275 0.025,-6.275 0.025,-7.85 -0.099,-7.55 0.775,-8.424
  • Top: 0.325,-6.999 0.524,-6.8 2.151,-6.8 2.35,-6.999 2.35,-8.476 2.376,-8.45 0.865,-8.45 0.865,-9.05 2.8,-9.05 2.5,-9.174 3.074,-8.6 2.95,-8.9 2.95,-6.575 3.074,-6.875 2.275,-6.076 2.575,-6.2 0.1,-6.2 0.4,-6.076 -0.099,-6.575
Stop condition reached: no third attempt. These results establish failure of the two chosen endpoint escape searches, not proof that every possible connection of the two whole copper islands needs placement changes. Geometry shows existing3V3_IMU copper from U2:VDD continuing east to a via at(4.7,-8.15), and onward to C14. A later authorized diagnosis should inspect whether a Bottom C13:P1–C14:P1 island connection avoids adding a crowded via; it was not attempted in this batch.
Concrete fallback placement proposal, not approved or applied: move C13 on Bottom from(0,-8.0) to(0,-8.8)mm, same rotation, to expose a southern escape toward a candidate via near(1.9,-9.0). Preserve U2 and R33. This is a candidate for local clearance verification, not a guaranteed route: inspect R16/R17, C14, existing copper and mirrored bottom-pad coordinates before committing; regenerate only affected local connectivity after approval. The SVG pad-label locations and router coordinates differ on mirrored Bottom parts, so use routing/physical-pad verification rather than trusting the unmirrored SVG labels for this move.
Final milestone
  • Fresh routing_state: 115 airwires, same protected redundant group of three segments.
  • get_checks at12:27:12.992Z:121 Error/Warning findings in DRC+Placement =115 airwire Errors + six unchanged Warnings.
  • Dedicated airwire check at12:27:54.474Z independently reports115.
  • Final board preflight: same four USB differential-pin Warnings (two D2 I/O1/I/O2 pad pairs; J1 DP1/DN2 and DP2/DN1), no new non-USB feasibility finding.
  • DRC delta: airwires −10; other DRC/placement Error/Warning findings no change. No new overlap, via-in-pad, protected-intrusion or invalid-layer finding appeared in this review filter.
Individually outstanding / unattempted items
  • 3V3_IMU island connection: failed twice as detailed above; retained partial result.
  • USB_DP and USB_DM: unattempted by scope; each still has a trace-to-MCU airwire, and all four preflight warnings remain. No EM was run because the requested critical USB routed continuity is absent.
  • D8–J3 overlap: unchanged Warning,8.43mm²; no approved placement move.
  • D8–J7 overlap: unchanged Warning,3.35mm²; no approved placement move.
  • F2–J7 overlap: unchanged Warning,0.47mm²; no approved placement move.
  • U3–J5 overlap: unchanged Warning,5.20mm²; no approved placement move. Header body-datum claims were not reinterpreted as permission to move components.
  • Density: unchanged Warning; no board-size or placement authorization.
  • Protected redundant USB group: intentionally not removed:52889a90-0993-479b-a194-07d0cdca310b,5cc73652-28d0-412e-8a22-5eaa03641ad1,ce236b62-82d0-41ea-8e92-443aaf72f9d0.
  • Remaining rail/signal connections: unattempted beyond the ten named items; fresh routing_state is the authoritative115-airwire endpoint list. Remaining3V3 islands are not a completed rail.
  • Root-cause rule changes: unattempted because this batch established no safe global rule correction; existing power widths, USB impedance-derived width and manufacturing minima were retained.
  • ERC/MPN remediation, full-board routing, EM, physical hardware and55A ESC testing: unattempted/outside this bounded batch. Historical ERC/MPN counts were not reasserted as fresh measurements.
This bounded repair batch is finished, but the overall PCB is incomplete and is not manufacturing-ready or flight-ready.
  • Latest bounded retry — 2026-10-10 13:10 UTC

  • 1. Connectivity and DRC findings

  • 2. Routed critical nets

  • 3. Repair plan and feasibility

  • Scope and evidence — 2026-10-10

  • Saved connections

  • Failed item10: exact blockers and next decision

  • Final milestone

  • Individually outstanding / unattempted items