Input Power Protection


Reconciled against the live PCB rather than the executor’s stale intermediate report.
  • Current DRC: exactly 1 airwire
  • Endpoint: Q1.S (d4702a34…) → GND fill
  • 0 reported floating copper, overlapping copper/traces, dangling traces, under-connected vias, component-boundary/body-overlap, pad-clearance, or keepout violations
  • Protected power placement and wide VLED copper remain preserved
No newer successful routing change was available to apply; the board remains one local Q1 ground connection short of fully routed.
Received notification from "PCB Routing Recovery" that it finished — picking the work back up.
I’m checking the newest executor report against the live PCB and rerunning the relevant connectivity/DRC checks. I’ll only retain it if it improves on the verified one-airwire state.
Reconciled against the live PCB. The latest recovery successfully cleared the final Q1.S GND airwire using a local stitching via and three adjusted Z1 bottom-layer segments.
Final DRC: clean — 0 airwires, 0 dangling traces, and no critical DRC errors or warnings in the checked clearance, copper-overlap, via, layer, keepout, boundary, and protected-intrusion categories. The board is now fully routed.
Received notification from "PCB Routing Recovery" that it finished — picking the work back up.
Reconciled. The latest executor output matches the live board:
  • Fully routed: 0 airwires
  • Final DRC: 0 critical errors or warnings
  • 0 dangling traces, floating/overlapping copper, clearance, via, layer, keepout, boundary, or protected-intrusion violations
  • The J6 protection group and 5 A VLED/GND routing remain intact
No remaining PCB work from this routing task.

Final Routing Handoff
Batch status
  • Completed: Reduced the board from five GND airwires to one by completing the RN1, RN3, RN5, and DLED1 return connections.
  • Failed after two genuine attempts: Q1.S ↔ GND fill remains unrouted. Both attempted solutions were reverted because they created copper overlaps with the existing ZSEL3 corridor.
  • Unattempted: No component placement, power-routing, stackup, or design-rule changes were made.
Completed GND work

Table


ConnectionResultDedicated GND via
RN5 B-side GND busRouted to the GND structure; airwire cleared(29.0, -30.5) mm, UID 78435a23-cc48-4210-9e72-28419b64fa9f
RN3 B-side GND busRouted to the GND structure; airwire cleared(-11.5, -31.2) mm, UID 961c6526-9dac-4a7c-beb6-6fa05464b135
RN1 B-side GND busRouted to the GND structure; airwire cleared(-50.5, -31.5) mm, UID 290b8ba6-54d3-4b7f-bd02-984be274c93f
DLED1.KGND-fill airwire cleared after adding a local GND via(-19.0, 24.0) mm, UID 8b9f82f3-74e9-4021-b203-a1ae01725de7
All unsuccessful routing that introduced overlaps was reverted. The final routing state has zero dangling traces.
Sole remaining airwire
  • Net: GND
  • Endpoint: Q1.S, pad center (-50.00, 2.95) mm
  • Other endpoint: GND fill UID 375d52bb-9df3-48e6-be16-b5062aa39c56.fill
  • Airwire count: 1
Why it is blocked
The through-hole transition required at Q1.S conflicts with the existing ZSEL3 vertical trace:
  • Blocking trace UID: e7804be8-3a90-41cb-ac78-4bbacea7ad45
  • Existing path: approximately (-49.561, 9.034) → (-49.561, -4.351) mm
  • Width: 0.5 mm
  • It passes only about 0.439 mm center-to-center from a via placed at Q1.S, which is insufficient for the 0.6 mm through-via plus copper clearance.
The first attempt routed Q1.S to Q2.S; its two generated vias overlapped this ZSEL3 segment and the nearby Bottom-layer Z1 diagonal. The second attempt placed a via directly in the Q1.S pad; it still overlapped the same ZSEL3 segment. Both attempts were reverted.
Minimum required fix
Surgically reroute the ZSEL3 segment so no copper passes within approximately 0.65 mm centerline distance of Q1.S at (-50.00, 2.95) mm, then add a through-hole GND via at Q1.S. No component movement should be necessary if that local ZSEL3 corridor is cleared.
Final DRC counts
Fresh requested DRC review timestamp: 2026-09-03T14:20:25.594Z.

Table


CategoryCount
Airwires1
Floating copper0
Overlapping copper0
Overlapping traces0
Dangling traces0
Under-connected vias0
Components outside board0
Component body overlaps0
Routing-state inspection independently confirmed 1 airwire and 0 dangling traces.
Preserved requirements
  • J6 protection placement group: preserved; J6, F1, QRP1, R57, and C7 were not moved.
  • C10–C15 beside QP1–QP6: preserved; none were moved.
  • Four signal copper layers: preserved. Top, Mid-Layer 1, Mid-Layer 2, and Bottom remain Signal; Mid-Layer 2 remains available for ordinary signal routing.
  • Ordinary signal minimum: preserved at 0.15 mm.
  • VLED_RAW: preserved at 3.5 mm minimum / 4 mm nominal / 5 mm maximum.
  • VLED_FUSED: rule and existing copper preserved.
  • Protected VLED: rule and existing copper preserved.
  • GND return: stitched all-layer GND fill and power-return rule preserved; only local low-current GND ties and dedicated through-hole vias were added.
  • Via technology: through-hole only remains enforced.
Additional preflight note
Routing preflight reported four duplicate generated-via warnings near (-31.72,-30.06), (-31.92,-28.46), (-36.32,24.09), and (-29.32,14.09). These did not appear in the requested final DRC categories and were not modified during this batch.
Final status
The assigned cleanup batch is partially completed: four of five starting GND airwires were cleared, and the board finishes with one precisely identified GND airwire and no other requested DRC errors.
  • Batch status

  • Completed GND work

  • Sole remaining airwire

  • Why it is blocked

  • Minimum required fix

  • Final DRC counts

  • Preserved requirements

  • Additional preflight note

  • Final status