Radxa CM5 PoE Carrier Design


I couldn’t switch your browser tab because the editor session disconnected. In the PCB layout, U1 is at (408.91, −55.80) mm—its current footprint is incorrectly collapsed to 1.6 × 1.6 mm, confirming the CM5 footprint defect.
please give me all the project files in a PDF format to download.
I’ll collect the current project documents, generate a consolidated PDF package, and provide direct download links.
Exported a file export
radxa-cm5-ip-camera-carrier.pdf
PDF export
Done — the complete project PDF is ready:
i only need the markdown text files in the PDF, nothing else. can you try again
I’ll rebuild the PDF using only the project’s Markdown documents—no schematic, PCB, BOM, or other design exports.
I removed the schematic, PCB, BOM, and manufacturing pages. This PDF contains only the Markdown project-document index with links to all eight text files:

Waiting for input


System Architecture
Status
Architecture checkpoint for the first EVT carrier. This document selects a concrete, lower-risk allocation of the Radxa CM5 interfaces. Schematic capture should use this as the block-level brief.
Verified CM5 Capabilities
  • Radxa CM5 uses RK3588S2 and exposes three 100-pin board-to-board connectors.
  • The module includes a Gigabit Ethernet PHY; the carrier receives Ethernet MDI pairs rather than a spare second RGMII MAC interface.
  • The reference IO board provides two USB 2.0 host ports and USB 3.0 host/OTG connectivity.
  • The SoC high-speed multiplexed interfaces provide PCIe 2.0 x1 and SATA/USB3 options; they cannot all be used independently at once.
  • Two camera interfaces are demonstrated by Radxa: one 4-lane 31-pin MIPI CSI and one 2-lane 15-pin MIPI CSI. The first EVT will implement one interface.
  • CM5 GPIO includes mixed voltage domains; voltage level must be checked per pin rather than assuming all exposed signals are 3.3 V.
Authoritative references:
Selected Interface Allocation

Table


FunctionCM5 connectionSelected implementation
WAN EthernetCM5 onboard Gigabit PHY MDIDirect protected 1000BASE-T RJ45, non-PoE
Three camera Ethernet portsUSB 3.0 hostIndustrial USB 3 hub feeding three Linux-supported USB-to-Gigabit-Ethernet controllers; each controller feeds protected magnetics/RJ45 and an independent PSE channel
NVMeCM5 PCIe 2.0 x1 through U41 downstream port 1M.2 M-key socket, 2280/2260/2242 mounting positions where practical
SATA HDD dataUSB 3.0 hub downstream portUSB 3.0-to-SATA bridge and J7 SATA connector, matching the live schematic
Cellular modemDedicated USB 2.0 host initiallyM.2 B-key modem socket with SIM; USB 2.0 is sufficient for LTE and basic 5G fallback but limits peak 5G throughput
Wi-Fi/BluetoothU41 downstream PCIe port 2 + CM5 USB2_HOST2J16 Amphenol MDT420E01411 M.2 Key E socket; PCIe Wi-Fi shares the CM5 lane through U41 and Bluetooth USB passes through U43 ESD protection. U22 is absent.
MIPI cameraDedicated MIPI CSIUse Radxa-compatible 31-pin 4-lane CSI as the default; add an adapter option for 15-pin 2-lane cameras if layout allows
SDSDMMCmicroSD recovery/boot socket
Supervisory MCUI2C/UART/GPIOSTM32-class low-power MCU, always-on rail, independent watchdog and load-switch control
RTC/securityI2CRTC with replaceable battery plus ATECC608A-class secure element
Field I/OMCU GPIO/ADCTwo protected inputs and two protected outputs; isolate or level-shift for field voltage
Why This Architecture
The CM5 does not provide enough independently exposed high-speed ports to give NVMe and PCIe Wi-Fi dedicated root-complex lanes. The live design resolves this with U41, a PI7C9X2G304SLBFDEX PCIe switch: CM5 is the upstream port, J6 NVMe is downstream port 1, and J16 Key E Wi-Fi is downstream port 2. USB3_HOST1 remains assigned to U9, while the free USB2_HOST2 pair provides Key E Bluetooth through U43.
U42 generates the U41 1.0 V rail from 3V3_AUX. The switch uses its integrated clock buffer in common-clock mode, distributing independent references to J6 and J16. Schematic metadata declares 85 ohm PCIe data pairs, 100 ohm PCIe clock pairs, and 90 ohm Bluetooth USB pairs; PCB layout must preserve those constraints and minimize coupling-capacitor stubs.
The camera ports are separate Linux network interfaces. ExNVR/Linux can bridge or route them as required. Hardware PoE is independent of the network-controller choice.
Ethernet and PoE
  • Port 1: IEEE 802.3at Type 2 PSE, 30 W PSE allocation.
  • Ports 2 and 3: IEEE 802.3af Type 1 PSE, 15.4 W allocation each.
  • Use a multi-channel standards-compliant PSE controller or three independently controlled channels with detection, classification, current limiting, disconnect detection, fault telemetry, and MCU shutdown control.
  • Generate a nominal 54 V PoE bus. Provide 60.8 W minimum at the PSE outputs; design the 54 V converter for at least 70 W continuous.
  • Use integrated-magnetics RJ45s or discrete magnetics rated for the selected PoE current, with Ethernet surge/ESD protection at each external port.
Power Architecture
  • Preferred deployment input: certified external 24 VDC supply, at least 150 W for unrestricted operation.
  • Carrier input range: 9-36 V electrical survival and controlled operation.
  • Full PoE + HDD spin-up + compute/modem peak is not practical at 9 V without approximately 20 A input current. Therefore:
    • 18-36 V: unrestricted operation subject to final thermal validation.
    • 9-17 V: firmware-enforced reduced-power mode; inhibit HDD spin-up and/or reduce PoE allocation before enabling high loads.
  • Protected input stage: fuse/eFuse, reverse-polarity MOSFET, surge TVS sized for the target environment, conducted-EMI filter, voltage/current monitoring.
  • Main rails:
    • 54 V / >=70 W isolated or non-isolated boost/buck-boost for PSE, depending grounding/compliance decision.
    • 12 V / >=5 A buck-boost for HDD spin-up and intermediate loads.
    • 5 V / >=6 A buck for CM5 and USB/storage loads.
    • 3.3 V auxiliary rail for logic and peripherals.
    • Always-on low-power rail for supervisor/RTC.
  • HDD 5 V and 12 V rails must be jointly switched and sequenced; the 12 V path must tolerate at least 2 A spin-up current.
  • Subsystem load switches: CM5, NVMe, HDD, modem, Wi-Fi, and PoE bus/channels.
Backup and Shutdown
A small battery cannot run the unrestricted system for several hours if all PoE cameras remain powered. Use a 24 V-class external battery pack/BMS or UPS module. The default backup policy should shed PoE and spin down the HDD, keeping the CM5 and communications alive long enough for orderly shutdown or reduced-power operation. Final capacity requires the desired backup policy and duration.
A supercapacitor should not support the entire peak system. Place hold-up energy on a reduced-power shutdown rail after the supervisor has disabled PoE, HDD, modem, and other discretionary loads.
Key Risks Before Schematic
  1. Validate U41 PCIe-switch enumeration, integrated-clock operation, reset sequencing, and simultaneous J6/J16 traffic on the selected CM5 BSP. The lane-allocation architecture is implemented; validation remains open.
  2. Confirm Linux/BSP support for the selected USB hub and three USB Ethernet controllers under sustained load.
  3. Select the exact MIPI camera and connector; camera drivers and device-tree support are as important as electrical compatibility.
  4. Select the cellular modem and decide whether USB 2.0 throughput is acceptable. If full-rate 5G is mandatory, the high-speed allocation must change.
  5. Define whether full functionality is mandatory at 9 V. The present architecture intentionally power-limits low input voltages.
  6. Define isolation and surge standards for Ethernet, DC input, and field I/O.
Schematic Block Order
  1. CM5 connectors, boot/recovery, power sequencing, and reference interfaces.
  2. Input protection and always-on supervisor.
  3. 5 V/12 V/54 V power tree and load switching.
  4. Native WAN Ethernet.
  5. USB hub and three camera Ethernet/PSE channels.
  6. NVMe and SATA/HDD power.
  7. Cellular, SIM/eSIM, and Wi-Fi.
  8. MIPI CSI, SD, RTC/security, field I/O, debug, and telemetry.
  • Status

  • Verified CM5 Capabilities

  • Selected Interface Allocation

  • Why This Architecture

  • Ethernet and PoE

  • Power Architecture

  • Backup and Shutdown

  • Key Risks Before Schematic

  • Schematic Block Order