Project Cleanup DRC
This issue has now blocked the project for approximately 10 days. I still have no confirmed diagnosis, assigned engineer, resolution timeline, or viable workaround. Please escalate this case to an engineering lead or support manager today and provide:
- The current case status and owner.
- Whether the virtual stitch-via failure has been reproduced.
- A target date for repair.
- A supported alternative, such as repairing the project data or providing a clean project copy that preserves the schematic and usable layout.
The board cannot proceed to production while these stale connectivity records remain. Please do not close the ticket as “needs routing,” because repeated routing attempts do not clear the affected airwires.
This project has been blocked for approximately 10 days, and I now need a concrete engineering timeline. Please provide:
- The assigned engineer or responsible team
- Whether the issue has been reproduced
- The current repair stage
- A target completion date
- A workaround or clean project migration plan if the backend repair cannot be completed within two business days
Please escalate this to a support manager or engineering lead. A general statement that the board “just needs routing” does not address the virtual stitch-via endpoints that cannot be selected, deleted, or satisfied by physical copper.
Waiting for input