ESP32 Sensor and Control Schematic


  • Set GND's connectedLayers to ""
  • Set GND's layer to "Top"
  • Set GND's traceWidth to "0.3mm"
  • Set GND's keepOut to "0.254mm"
  • Set GND's connectedLayers to ""
  • Set GND's layer to "Top"
  • Set GND's traceWidth to "0.3mm"
  • Set GND's keepOut to "0.254mm"
Placed 15 component(s): U3, U5, U2, J1, K1, U1, BZ1, R2, D1, LED1, J2, R3, U4, R1, SW1
Work done
  • Applied the required explicit per-net trace-width rules: 12V and HEATER_12V_SW at 2.0mm, GND at 1.0mm with Bottom preference, 3V3/5V at 0.8mm, and remaining named signal/control nets at 0.3mm.
  • Reconfirmed the PCB is on a 120mm × 100mm, Standard 2-layer stackup.
  • Reworked placement once to improve separation and keep the high-current zone on the right; relay/J1/J2 remain intended for the right-side power/heater area.
  • Fixed the Layers with Multiple Fills issue by limiting unintended sublayout fill participation; latest review shows that category is now clean.
Success criteria review
  • ✅ Net-specific trace-width rules applied and verified for the listed power/signal nets.
  • ✅ Bottom-layer GND fill conflict improved: Layers with Multiple Fills is now clean.
  • ❌ Routing is not complete: latest review still reports 24 airwires.
  • ❌ DRC is not clean: latest review still reports 15 overlapping copper errors and 24 airwire errors.
  • ❌ Final fabrication-ready state could not be confirmed: not at 0 airwires / 0 DRC errors.
Next steps
  • Continue with the fix-verify loop: resolve the remaining U5/TFT and 46116ccf copper overlaps, then route all nets in phases — high-current 12V/heater first, then 5V/3V3/GND, then SPI/control/sensor signals — and rerun DRC until clean.

Schematic of NSS Heater — Automatic Normal Saline Solution Warming System
Schematic Not Placed

The schematic has not been placed. Flux can arrange symbols and draw wires to be more readable. This takes about 10–60 mins.

NSS Heater — Automatic Normal Saline Solution Warming System