Predictive Maintenance Device


Yes, finalize interfaces, select components, calculate the power budget, and build the carrier schematic.
I’ll freeze the modular interface standard, select the carrier components, calculate the verified power budget, build and wire the complete carrier schematic, then run connectivity/ERC checks and resolve concrete issues.
Created a project doc

Block Diagram

View Document

Block Diagram Carrier Architecture Functional Groups and Sourcing Gate Inter-block Nets
Power: 24V_RAW, 24V_PROT, FIELD24V_S1..S4, 5V, MODEM_VBAT, 3V3, GND, ISO_5V, ISO_GND.
Buses: I2C_SDA/SCL, SPI_SCK/MOSI/MISO, per-slot SLOTn_CS/INT/EN, CELL_TX/RX, RS485_TX/RX/DE, USB_D+/D-.
Execution is blocked because the account has no available ACUs. The universal POC/MVP requirements and modular architecture are documented, but no schematic components or nets were added.
Remaining work:
  • Finalize component selections and module connector pinout
  • Calculate the datasheet-based power budget
  • Build and wire the carrier schematic
  • Run ERC/connectivity verification
  • Create firmware starter and board bring-up files
Add ACUs to resume from this exact scope.
Add ACUs
Estimate ACU needs
Review documented requirements
No schematic yet

Talk to Flux to get started.