Connector Design Options


I’ll review the pasted Rev B requirements and reconcile them with the existing direct-relocation architecture before making changes.
Created a thread; Cloned a project
BF-SR-PCBv1-RevB
BF-SR-PCBv1 signal relocation PCB for ESP32-S3-DEVKITC-1-N32R16V
Build Rev B schematic
Starting...
View Thread
Rev B has been cloned separately, so Rev A remains untouched. The Rev B schematic build is underway now, including verification of the original 44 pass-through nets before any active circuitry is added.
Created the separate BF-SR-PCBv1-RevB clone, leaving Rev A unchanged. The Rev B schematic task completed its baseline 44-net inspection and continued through component research/build work, but I cannot inspect or validate the final report because no ACUs remain.
Remaining:
  • Review the completed Rev B schematic changes and selected parts.
  • Confirm all 44 pass-through nets remained unchanged.
  • Resolve ERC issues and approve the schematic checkpoint.
  • Place components, verify ESP32 socket geometry, route, and run final DRC.
Review Rev B schematic
Review selected components
Verify pass-through nets
Document Rev B decisions

BF-SR-PCBv1

BF-SR-PCBv1 thumbnail