Project Started


I’ll make the PCB placeholder a continuous annulus—keeping its center opening and mounting holes—and measure how far it must rise to clear J1. I’ll check the raised position against the cap, tray, and battery, and flag any mounting changes it requires rather than hiding collisions.
Finished execution
Updated the green placeholder to a continuous 55/30 mm annulus, retaining its mounting holes, and raised its underside 8 mm to z=11 mm, providing 0.5 mm nominal clearance above J1.
It is provisional, not fitted: the raised ring intersects the battery and no longer engages the cap supports or spring contacts. Everything else is unchanged; measurements and renders are in Continuous Ring Clearance Check.
"Continuous Ring PCB Clearance Update" completed.
The ring is now continuous and raised 8 mm, giving 0.5 mm clearance above J1, but it intersects the battery and is not a fitted assembly.
  • Preserved: 55 mm OD, 30 mm center opening, 1 mm thickness, and three mounting holes.
  • Existing support pins/hooks no longer engage; the spring contacts now have 8 mm gaps.
  • Raising it further cannot solve this inside the current cap: the battery and roof limits conflict by 0.75 mm, even before adding clearance.
Only the ring placeholder changed; everything else remains untouched. I recommend keeping this position provisional while checking a revised internal stack. Which direction would you like?

Waiting for input

1. Check a revised internal stack
2. Assess a taller cap

Contact Repair Verification
Final restoration pass — current status, 2026-09-18 20:29 UTC
All five assigned connections are restored and the board now has zero airwires and zero overlapping-copper findings. The zero-routing-state-redundancy gate remains blocked by a demonstrated unsafe classifier discrepancy. This section supersedes all previous status/counts below. No placement, design-rule, keepout, schematic, or unrelated topology changes were made in this pass. All routes were reconstructed explicitly; no generic routing or autorouting was used.
Worklist results

Table


Assigned itemStatusRestoration evidence
GND fill → C3:P2CompletedRecreated historical 0.15 mm Top path from (-4.1000028467,-0.825) through (-3.35,-1.575), (-3.35,-2.775), (-2.375,-3.75), (-2.375,-3.825) to historical via location (-2.45,-3.9). Restored a rendered through-hole via using the current existing stackup configuration; the surviving historical Smart Via at that coordinate did not render copper.
GND fill → U2:REFCLKCompletedRecreated the exact historical two Top segment rules and deleted GND via at (-1.052,-3.249), rotation 135°, Top/Bottom.
GND stitching via → U1:GND::33CompletedRecreated historical Top corridor from (10.1000048942,-4.8000072902), through (9.8,-4.8), (8.975,-3.975), (8.975,-3.2216), (8.874,-3.1205) to existing ground stitching landing near (6.3175,-3.1205). Removed one genuinely redundant pin-internal segment after fresh DRC; connection remains intact.
ID_NTC R3:P2 → U1:P0.02/AIN0CompletedRecreated original U1 Top escape, historical via (14.0068,2.9976), and original Bottom cross-board approach. Only final P3 landing adapted to its approved new center (-20.1885589368,-3.5597876422). Existing P3→R3 Top route was preserved.
PWM_B_GATE endpoint → Q3:GCompletedOriginal historical 0.15 mm Top segment restored first. Checker deletion reopened the gate connection, so same local connection was terminated at the verified pad center through (9.475,15.45), (9.825,15.1), (10,15.1). No reroute of the gate trunk.
Post-restoration redundant cleanupFailed acceptance gate; deletion attempted and rolled back where unsafeTwo explicit DRC UIDs removed; the required PWM connection was reconstructed as above. Deleting the remaining 16 routing-state-only candidates created four GND airwires, so that single deletion batch was atomically reverted. Essential GND copper retained.
Fresh final checksCompletedCounts below; no new DRC errors, placement changes, rule changes, or schematic changes.
Historical source: pre-swap commit 0a9f5d0b, cross-checked with previously inspected 74e4b942 ground geometry and current pad coordinates. The pre-swap snapshot itself reports five airwires on other nets when inspected today, but none of these five assigned disconnections; this pass did not assume the entire historical board was universally DRC-clean.
Final exact counts
Full ERC/placement/DRC check: 2026-09-18T20:29:09.395Z. Focused airwire, overlapping-copper, redundant-trace, and floating-copper check: 2026-09-18T20:29:43.275Z. Routing state independently confirms zero airwires.

Table


Gate or categoryFinal result
Airwires, whole board0
Overlapping copper0 findings
Floating copper0 findings
Explicit redundant-trace DRC0 findings
Design Rule Checks category0 errors / 0 warnings returned
Routing-state redundancy16 nodes in 4 groups — gate not met
New DRC errors introduced by this pass0
Existing placement checks10 errors / 3 warnings, unchanged
Existing electrical checks5 errors / 1 warning, unchanged
The five connection-restoration items are completed; the entire acceptance batch is not fully complete because the zero-redundant-nodes/groups gate cannot be claimed. Existing unrelated ERC/placement errors also mean manufacturing readiness is not established.
Controlled cleanup test and rollback proof
  1. Snapshot e6cf765a: all five restored; zero airwires and explicit DRC clean.
  2. Deletion 26face99 removed exactly the 16 routing-state-flagged GND nodes in one batch, after all five were connected as requested.
  3. Read-only routing state immediately showed 4 airwires / 0 redundant candidates: C3:P2, U2:REFCLK, U1:GND::33, and Q1:S disconnected from GND. This directly disproves safe deletion of those groups in this state.
  4. History dry-run confirmed only that single deletion commit would be reverted. Atomic revert to e6cf765a restored all 16 nodes without undoing any connection repair or other work.
  5. Fresh final checks again show 0 airwires / 0 overlaps, but routing state continues flagging the same 16 nodes. Do not repeat that deletion or conceal the flags by changing protection/rules.
Retained disputed candidates, grouped as returned:

Text


Group 1 (Q1 return):
30055845-8eb6-4483-a6e5-0da544f03a69
dbf7cb6b-79b6-44f8-98c7-bcb191d41dd1
f4861af7-db96-4d16-a1f1-e0c9567d06b1

Group 2:
3cd03745-ade0-414c-9ccc-61e29eff9565
55433fd9-f5dd-428f-ab95-9b96a311876e
5621ae2a-2a05-42bb-be6c-97c1681b68e5

Group 3:
4546086a-4859-4a0b-8cea-1b1168e902b5
542ddcfa-150c-4991-9c5f-28e586ab57c6
596ef8f5-1eaf-4353-8bac-7d1ca8490422
ddd6758d-6abb-42f9-aaec-fe0dcc16d3fe

Group 4:
6bc89867-ea3c-4510-b6be-76e1b635a45b
8d6f95c9-b1a0-4db2-818c-83bfce5f0d37
a91918a6-3023-4e94-a0db-a26d96567a05
aa5d6c09-93f1-4bcd-b9ec-b4fb3e74ddf8
d2f610a5-4a51-4122-a1ba-ea53edc20621
e65cb42c-63c5-44cf-a816-b2a390fda3a0
Two removals remain persisted: 1ce740e5-f3d4-4882-9c1d-ddd663fd4ef8 (unneeded U1 GND pad-internal segment) and 2fb0755b-c524-4adb-a10f-2d356a335ff7 (old PWM_B edge-landing segment, replaced with pad-center connection). The 16-node deletion was fully rolled back, not left as collateral damage.
Read-only routing preflight returned Board valid: yes, with no feasibility issues. Editor display was attempted but the frontend session was unavailable. Internal feedback submission about the reproducible classifier mismatch failed; no report/ticket was filed. The remaining blocker is checker/ground-fill connectivity reconciliation, not permission to remove functional copper or alter placement/rules.
Required recovery — current result, 2026-09-18 20:18 UTC
Dock contact routing and the two named collateral repairs are completed; the full acceptance criteria are not certified because the two redundant-copper inspectors disagree. This section supersedes earlier status/counts below. No component placement, keepout, design rule, schematic, or D1 identity was changed. No generic targeted routing or whole-board autorouting was used in this recovery; copper was authored explicitly from historical approaches.
Assigned worklist

Table


ItemStatusEvidence / qualification
Restore +3V0 C4:P1 → U3:V+CompletedHistorical Top endpoints rejoined; no remaining +3V0 airwire or copper overlap. Local west bypass avoids P3.
Restore TEMP_ALERT_P0.24CompletedHistorical Top approach and horizontal trunk rejoined, with a local north bypass of P6; no remaining TEMP_ALERT airwire or overlap.
Assess/delete original nine redundant UIDsAssessment completed; deletion unattempted because required for restorationAll nine were preserved approaches on these two nets. Reconnection made all nine cease to be flagged. Deleting them would destroy the recovered routes, so the prerequisite for their deletion was not met.
Recover prior routes from historyCompleted, with necessary local deviationsInspected commits 332a613c and 74e4b942, plus diffs 10680220, 1a167ff2, 894994f2. Existing new pads intersected original copper, so verbatim restoration everywhere would reintroduce shorts.
P1 DOCK_VBAT → D1:1CompletedOriginal 0.7814 mm Top approach restored. One new layer-transition via at former landing (-14.7224,8.5) and a Bottom tail reach P1 without crossing Top SCL. This is a departure from the earlier no-new-via restriction, not a claim of exact history restoration.
P5 LED_R → Q1:DCompletedOriginal signal via and Top/Bottom approaches restored, Bottom bypass around P3, northward pad access at unchanged P5 center. No P5 copper/keepout finding in final checks.
P6 LED_G → Q2:DCompletedOriginal via and approach restored; terminal tail shortened/shifted north of P7 to prevent an inter-net crossing.
P7 LED_B → Q3:DCompletedOriginal via and approach restored; shortened southern tail reaches new P7.
P2 GND and P4 PRESENTCompleted verificationNeither contact occurs in remaining airwires; no pad, placement, or rule edits.
Preserve P3 → R3CompletedExisting P3 route unchanged. Pre-existing internal R3 → U1 ID_NTC airwire remains.
Remove newly redundant stubsPartially completed; clean-state certification failedRemoved two checker-flagged Q2/Q3 drain stubs together. Q1 GND recovery has three disputed cleanup candidates; retained to avoid recreating Q1:S airwire.
Final read-only checksCompletedCounts and exact discrepancy below.
Restoration geometry and safeguards
The +3V0 restoration uses Top 0.3 mm copper from (-19.409533,-1.585807) via (-20.9,-1.585807), (-21.5,-2.185807), (-21.5,-4.7), (-18.2,-8) to historical endpoint (-16.465072,-8), all mm. The preceding SCL repair was shifted locally from x=-21.65 to x=-22.1 to provide this corridor, keeping its historical endpoints; replacement SCL was added before deleting its three superseded segments, preventing an open net.
TEMP_ALERT uses Top 0.254 mm copper from (-13.03,-13.106752) through (-8.236752,-17.9), (-6,-17.9), (-4.928874,-18.971126) to (10.242351,-18.971126), reusing surviving trunk copper. Original nine cleanup candidates on +3V0/TEMP_ALERT are now functional, not deleted stubs.
Three deleted LED signal vias were recreated at their historical coordinates: LED_R (1.1055,6.3337), LED_G (11.498,6.299), LED_B (12.9437,-1.5089), using existing 0.6/0.3 mm stackup via configuration. LED widths remain 0.254 mm. Bottom historical local X coordinates are mirrored relative to document coordinates; explicit geometry was authored in document coordinates, not copied with the wrong sign.
Restoring LED_R exposed a Q1:S GND airwire. A history-based source return removed it, but cleanup classified that return as redundant; deleting it recreated Q1:S airwire. The final retained repair reaches the actual Q1:S center (2.8,8.8), then (3.25,9.25), then restored historical GND via (3.8,9.25), width 0.254 mm. A failed alternative to historical Smart Via (3.8,10.275) was removed: that Smart Via has no rendered copper in the inspected view. No unrelated airwire introduced in this recovery remains; the three remaining GND disconnections were present before this request, although the representative endpoints of one fill-island airwire changed.
Exact final counts and remaining connections
Fresh full checks at 2026-09-18T20:17:37.626Z, and focused redundant/overlap checks at 20:18:02.294Z:

Table


InspectionErrorsWarnings / candidates
DRC5, all airwires0 warnings returned
Overlapping copper00
Explicit redundant-trace DRC00 findings returned
Routing-state redundant classifier—3 nodes in 1 group, inconsistent with DRC
Electrical checks51
Placement checks103
There are 0 contact-to-destination airwires for P1–P7, 0 +3V0/TEMP_ALERT collateral airwires, and 5 total board airwires:
  • GND fill → C3:P2 (same previously disconnected C3/U2 ground region; representative endpoints changed).
  • GND fill → U2:REFCLK.
  • GND fill stitching via → U1:GND::33.
  • ID_NTC_P0.02_AIN0: R3:P2 → U1:P0.02/AIN0 (pre-existing internal dock-net gap, not repaired in this batch).
  • PWM_B_GATE: original trace ending 7f3742f977aa7a97c63a5ebd23d59577 → Q3:G.
Thus a literal criterion of zero airwires anywhere on a dock-associated net is not met, because ID_NTC still has its pre-existing internal gap. The narrower explicitly requested P3-to-R3 connection remains intact.
Disputed final Q1 GND cleanup candidates, deliberately retained:

Text


30055845-8eb6-4483-a6e5-0da544f03a69
dbf7cb6b-79b6-44f8-98c7-bcb191d41dd1
f4861af7-db96-4d16-a1f1-e0c9567d06b1
Do not blindly delete these: the equivalent preceding via/trace deletion recreated the Q1:S airwire. Repeated fresh routing-state reads retain these flags while explicit DRC returns none. This tool disagreement blocks an unqualified zero-redundancy completion claim. Internal feedback submission failed; no ticket was filed.
Deletion audit in this recovery
Only superseded repair copper and freshly flagged stubs were removed; none of the original nine needed restoration segments were deleted:

Text


d7b2b16e-72a1-4408-8314-af4154d75383  superseded SCL
f3bcc538-8b8f-4b38-abd5-82f97bd45646  superseded SCL
d2c6baf6-2186-477d-9020-d8723845e34f  superseded SCL
5f7ea0a2-8174-4817-8476-e180cfb1d9f7  redundant LED_B drain stub
a536461f-a68c-446b-9b64-95b257c907c0  redundant LED_G drain stub
162799af-3f43-4af2-bc92-1f62e4079d05  superseded temporary Q1 GND via
8c4cc0f7-de8e-417f-ad1b-efe4c6edc666  superseded temporary Q1 GND trace
5052719f-0a18-44dd-be7c-295081b25319  ineffective temporary Q1 GND trace
Each mutation requested delta checks, and routing-state/full DRC were subsequently read. Editor display was attempted but unavailable because the requester frontend session was not found. Overall board readiness remains separate from completion of the four named dock connections and two mandatory collateral restorations.
Surgical routing pass — latest status, 2026-09-18
Partial; not complete and not ready for manufacture. This section supersedes prior check counts, not the contact-position acceptance below. Final full checks at 2026-09-18T19:59:55.380Z: DRC 11 errors (all airwires), 4 warnings (redundant groups); ERC 5 errors / 1 warning; placement 10 errors / 3 warnings. A fresh focused overlapping/floating-copper check at 20:01:11.056Z returned no findings. Copper overlaps improved 7 → 0, while total airwires changed 10 → 11 because two collateral connections remain open after conflict removal and one dock connection was completed.
Assigned-item outcomes

Table


ItemStatusEvidence / blocker
Remove six conflicting segmentsCompletedSix exact UIDs below deleted; all seven copper-overlap findings cleared. No other pre-existing copper deleted.
Restore I2C_SCL_P0.27CompletedTargeted attempt timed out at 15 s. Added three local Top segments, width 0.254 mm, through (-21.163442,-8.794780), (-21.650000,-8.308222), (-21.650000,4.005222), (-21.163442,4.491780) mm. Original endpoint approaches retained; final SCL airwires zero.
P3 CONTACT → R3:P2CompletedOne targeted route, 5.733051 mm; final P3 airwire cleared. Existing R3:P2 → U1:P0.02/AIN0 airwire remains outside this connection's scope.
P2 GND and P4 PRESENT verificationCompletedNeither has an airwire in the fresh baseline or final routing state; no copper edits made on these nets. This is connectivity-check evidence, not a separately simulated ground-return certification.
Restore +3V0FailedTwo attempts, including reversed search direction, rejected without persistence because each proposed route introduced one checked airwire error. C4:P1 → U3:V+ remains open following conflict deletion.
Restore TEMP_ALERT_P0.24FailedTwo attempts rejected without persistence: proposed routes introduced two and three checked airwire errors respectively. Original surviving approaches preserved; gap remains.
P1 CONTACT → D1:1FailedOne attempted route rejected without persistence: one new floating-copper error. No repeat of the same rejected route.
P6 CONTACT → Q2:DFailedOne attempted route rejected without persistence: two new floating-copper errors.
P7 CONTACT → Q3:DFailedOne attempted route rejected without persistence: one new floating-copper error.
P5 CONTACT → Q1:DUnattemptedPreflight reports ROUTING_PIN_INSIDE_KEEPOUT on P5 and says that keepout would be ignored. Moving contacts or changing keepouts is outside authorization; did not route through an ignored keepout.
Further redundant cleanupUnattemptedFresh final state flags nine surviving segments in four groups on +3V0 and TEMP_ALERT. These are the preserved approaches for the two open collateral connections, not stale contact tails. Deleting them would discard the expressly preserved routing approaches.
Final read-only checksCompletedCounts above; routing_state independently confirms eleven airwires and nine redundant nodes in four groups.
One targeted-routing call persisted copper (P3); three additional SCL segments were authored directly. Readback lists seven new trace nodes across SCL and ID_NTC and only the two pre-existing SCL vias; no new vias were added. No components, rotations, layers, schematic nets, D1 identity, board geometry, stackup, or existing rules were changed. Full-board autorouting was not invoked. PCB editor display was attempted but failed because the requester frontend session was unavailable.
Exact deletion audit for this pass

Text


autoRouted.auto-layout-7e31b1c3-9c91-418b-bfb1-c0d3370a9a80.e8580f13-c74b-449c-bba3-5c28dd484a4f.Trace.755b3001eeae9f4b926fe94dcf97494f
autoRouted.auto-layout-7e31b1c3-9c91-418b-bfb1-c0d3370a9a80.e8580f13-c74b-449c-bba3-5c28dd484a4f.Trace.79c2b86be002d94f8de1c51a463722f0
autoRouted.auto-layout-449bca1e-3948-4e9a-92cf-0f8089e8fdf0.3a76fec7-94e8-4c14-aa05-8dc364869445.Trace.e78b7421df0aa325da29f945682458f0
autoRouted.auto-layout-449bca1e-3948-4e9a-92cf-0f8089e8fdf0.e852a7f0-e57b-4e50-8e6e-2d6c32e0736d.Trace.1331e0f9f9a7bfa242d06a31eb6bbd48
autoRouted.auto-layout-449bca1e-3948-4e9a-92cf-0f8089e8fdf0.e852a7f0-e57b-4e50-8e6e-2d6c32e0736d.Trace.48e281b6c0bee53b7e5b2cc30365b96d
autoRouted.auto-layout-449bca1e-3948-4e9a-92cf-0f8089e8fdf0.e852a7f0-e57b-4e50-8e6e-2d6c32e0736d.Trace.58aa567e0b29850c671db50921665e1a
The first two belong to TEMP_ALERT, the third SCL, and the last three +3V0. Cumulative deletion including prior passes is now 82 trace segments and 6 vias; this pass itself removed only six traces and no vias.
Final eleven airwires
  • +3V0: C4:P1 → U3:V+ (new collateral gap).
  • TEMP_ALERT_P0.24: original trace ending cfa01905220f26972a27dd64dbb8c44c → trace ending 80874d6339113e331f8ebfa097f98e0f (new collateral gap).
  • DOCK_VBAT: D1:1 → P1:CONTACT.
  • ID_NTC_P0.02_AIN0: R3:P2 → U1:P0.02/AIN0.
  • LED_R: P5:CONTACT → Q1:D.
  • LED_G: P6:CONTACT → Q2:D.
  • LED_B: P7:CONTACT → Q3:D.
  • GND: fill → U2:REFCLK; stitching via → U1:GND::33; U2:DBG1 → C3:P2 (three pre-existing airwires).
  • PWM_B_GATE: original trace ending 7f3742f977aa7a97c63a5ebd23d59577 → Q3:G.
Next work needs an explicitly reviewed local route/ground-fill strategy for the rejected connections and clarification of P5's keepout, not a whole-board reroute or deletion of the remaining approaches. The route rejection messages give counts, but not identities, of proposed new ground/floating-copper defects; their exact root cause remains uncertain.
Final precision correction — latest verification
Completed: only P2, P3, P5, and P6 element centers were changed to the newly approved coordinates. Direct readback matches all four exactly; P1, P4, and P7 remain unchanged. No traces or vias were added, deleted, or edited in this precision pass, and no autorouting was performed.
Completed: fresh redundant-trace DRC at 2026-09-18T19:24:54.608Z found no redundant UIDs. Fresh routing state independently returned 0 redundant nodes in 0 groups. Conditional copper cleanup was therefore unattempted/not needed.
Latest full checks at 2026-09-18T19:25:20.333Z: ERC 5 errors / 1 warning; schematic legibility 0 errors / 0 warnings returned; placement 10 errors / 3 warnings; DRC 17 errors / 0 warnings, comprising 10 airwires and 7 overlapping-copper errors. Findings and affected connections match the preceding reconciliation; no new violations were found in this precision pass. The board is still not DRC-clean.
Read-back coordinates and calculated radii below are in mm. Radius was computed from the read-back center using r=x2+y2r=\sqrt{x^2+y^2}. Displayed radii are rounded numerical calculations, not claims of infinite-precision coordinates.

Table


ContactRead-back XRead-back YCalculated radiusThis pass
P1-17.753520810.250000020.500000019415Unchanged
P2-20.18855893683.559787642220.500000000054Corrected
P3-20.1885589368-3.559787642220.500000000054Corrected
P4-17.7535208-10.250000020.500000019415Unchanged
P5-13.1771459986-15.703911083920.499999999987Corrected
P6-7.0114129382-19.263698726120.499999999998Corrected
P70.0000000-20.500000020.500000000000Unchanged
No blockers remain for this four-center correction batch. D1, unrelated placement, and all existing ERC/DRC findings were left untouched. The following sections retain the earlier repair and reconciliation audit; the latest coordinates and verification above supersede earlier acceptance and timestamps.
Final reconciled scope status
  • Completed: P1–P7 exact Mill-Max replacement, sourcing metadata, and preservation of all seven original logical net assignments.
  • Completed: direct element-center readback matches every supplied coordinate exactly. The earlier placement-failure characterization is withdrawn: the owner-supplied coordinates are the acceptance reference for the nominal 20.5 mm contact circle. No position discrepancy was found and no position was changed during reconciliation.
  • Completed: the additional 12 redundant UIDs in five groups were freshly read from routing_state and deleted in one batch, exactly as approved. Both fresh routing state and redundant-trace DRC now report zero remaining redundant copper.
  • Completed: fresh read-only checks and element-center verification.
  • Unattempted by instruction: autorouting, airwire repair, overlapping-copper repair, D1 substitution, unrelated placement changes, and unrelated ERC remediation.
The cleanup batch is complete; the board is not DRC-clean or ready for manufacture. The 12-node deletion introduced three additional GND airwires, documented below. No additional copper was modified to conceal or clear them.
Fresh check counts
Final full check timestamp: 2026-09-18T19:16:05.918Z. Redundant-trace DRC timestamp: 2026-09-18T19:15:57.441Z. Counts are individual findings, not review-category counts.

Table


CategoryErrorsWarnings
Schematic electrical checks51
Schematic legibility findings returned00
Layout placement checks103
Design Rule Checks170
DRC errors comprise 10 airwires and 7 overlapping-copper errors. Both redundant-trace checks show 0 nodes in 0 groups. Schematic, placement, and copper-overlap counts are unchanged from before reconciliation; airwires increased 7 → 10.
Unchanged schematic findings are five U1/U2 power-input errors and the D1 unspecified-pin-type warning. Unchanged placement findings are two U1 keepout errors, eight switching-power-stage errors, and three warnings: Q3/R7 clearance, U1 body overhang, and C8 decoupling loop. These were not fixed.
Exact replacement identity
All P1–P7 use 0906-0-15-20-76-14-11-0:
  • Part UID: 4279468e-253c-46bd-87a6-90abe1a6c7ec
  • Version: 90f1e30a-b039-42c9-9611-ea8d35f06f8f
  • Manufacturer Part Number: 0906-0-15-20-76-14-11-0
  • Manufacturer Name: Mill-Max Manufacturing Corp.
  • Digi-Key Part Number: ED8180-ND
  • Passive pin CONTACT, pin 1
  • Circular PTH copper diameter 1.829 mm, holeSize 0.5334 mm; local pad center (0, 0).
The original replacement encountered a pin-name mismatch (~ versus CONTACT). Only the seven contact pins were temporarily disconnected and reconnected to their saved original nets; final schematic inspection verified the mapping.
Direct element-center readback
All dimensions are mm, referenced to board origin (0, 0). The following values were freshly read after reconciliation and match the supplied values exactly. Intended circle radius: 20.5 mm; acceptance is against the supplied center coordinates as clarified by the owner.

Table


ContactPreserved net on CONTACT pin 1XY
P1DOCK_VBAT-17.753520810.2500000
P2GND-20.18855893683.5597876422
P3ID_NTC_P0.02_AIN0-20.1885589368-3.5597876422
P4PRESENT_P0.03_AIN1-17.7535208-10.2500000
P5LED_R-13.1771459986-15.7039110839
P6LED_G-7.0114129382-19.2636987261
P7LED_B0.0000000-20.5000000
P1's original net was DOCK_VBAT, not downstream VBAT. P3/P4's original longer names were retained. No nets were renamed or merged. D1 was not substituted or otherwise edited.
Copper deletion audit

Table


StageRedundant groupsNodes removed
Original repair, first fresh DRC batch1869: 65 traces + 4 vias
Original repair, follow-up fresh DRC batch11 trace
Reconciliation, fresh routing-state batch512: 10 traces + 2 vias
Final routing state00 remaining
Final redundant-trace DRC00 remaining
Cumulative removal across the repair and reconciliation: 82 nodes: 76 trace segments and 6 vias. Reconciliation removed only these 12 freshly returned UIDs, in one call:

Text


2780c45b-b8ff-4438-916b-3a96f9fa5214
b10121c6-8954-403b-b7a8-7b1ea5f98025
d6f8a888-e8e2-4f06-ba38-1b466e866e67
2ca49e6e-b6c2-41a7-a65d-3add48c100ca
bb9b525d-f0a5-4f6d-98f4-1fbbfa9c3665
326ec953-9b18-4780-9e0d-8a39982c1aaa
3457bb16-b355-4687-889d-4a96d5e26d66
38492811-544a-496e-b7fe-3677da7f6b18
5a04ab3c-d088-49df-9ec9-38aa1c973c43
abfdb553-bb4d-45d3-a200-585be546c7ce
bb8ebee5-d1ff-4292-b694-8660b4a1dc28
f2e1c5e5-4bbd-47a6-ba7c-932ac5f6f539
All 12 were on GND. The earlier discrepancy between routing state and redundant DRC is now resolved as to remaining count: both report zero.
Remaining airwires and new findings

Table


NetUnrouted connectionReconciliation delta
DOCK_VBATD1:1 → P1:CONTACTUnchanged
GNDGND fill → U2:REFCLKNew
GNDGND fill stitching via → U1:GND::33New
GNDU2:DBG1 → C3:P2New
ID_NTC_P0.02_AIN0R3:P2 → P3:CONTACTUnchanged
ID_NTC_P0.02_AIN0R3:P2 → U1:P0.02/AIN0Unchanged
LED_BP7:CONTACT → Q3:DUnchanged
LED_GP6:CONTACT → Q2:DUnchanged
LED_RP5:CONTACT → Q1:DUnchanged
PWM_B_GATEExisting trace ending 7f3742f977aa7a97c63a5ebd23d59577 → Q3:GUnchanged
Seven overlapping-copper errors remain: P6 against two existing traces, P3 against four existing traces, and P2 against one existing trace. They are errors, not warnings. No attempt was made to reroute or modify functional copper to clear them.
Deletion followed the explicit UID authorization, but the three new GND airwires mean the classifier's claim of redundancy does not establish preservation of all physical connectivity. That remains a review concern, not permission for further mutations.
Scope preservation
During reconciliation, the only PCB mutation was the one 12-UID deletion batch. No component placement, D1, schematic connectivity, stackup, or design-rule change was performed; no autorouting occurred. Opening the PCB editor was attempted but the requester frontend session was unavailable. Verification and mutation tools remained available.
  • Final restoration pass — current status, 2026-09-18 20:29 UTC

  • Worklist results

  • Final exact counts

  • Controlled cleanup test and rollback proof

  • Required recovery — current result, 2026-09-18 20:18 UTC

  • Assigned worklist

  • Restoration geometry and safeguards

  • Exact final counts and remaining connections

  • Deletion audit in this recovery

  • Surgical routing pass — latest status, 2026-09-18

  • Assigned-item outcomes

  • Exact deletion audit for this pass

  • Final eleven airwires

  • Final precision correction — latest verification

  • Final reconciled scope status

  • Fresh check counts

  • Exact replacement identity

  • Direct element-center readback

  • Copper deletion audit

  • Remaining airwires and new findings

  • Scope preservation