I mapped the next three USB routing trials and found a via geometry that meets JLCPCB’s published HDI limits. I made no edits to the main-board fork. The 20 × 60 mm outline, main sensors, and current mux placement remain unchanged. None of the USB paths is verified yet.
Table
USB pair
Next routing trial within the existing outline
Receptacle → mux
Reroute the inner-layer CC1 leg and bottom raw-VBUS fan-out together. Then try the adjacent DP1/DN1 launch while preserving both plug orientations, ESD, and VBUS isolation. The fixed CC1 pad still limits the exit. Reject the previous path: it had 24 mm uncoupled and 17 mm of length mismatch.
SAMD21 → mux
Shift the I²S data via near (0.99, −8.04) mm and the +3V3 vias near (0.64, −6.26) and (1.83, −5.00) mm to open a shared corridor. The regulator’s SYS_5V and +3V3 copper is a second bottleneck.
Recovery MCU → mux
Relocate the SWDIO via near (−2.86, 27.07) mm and check the adjacent reset escape. Then test the corridor past the sensor and connector routing without moving the sensors or breaking LIM_UVOV_N.
The outer-layer 90 Ω estimate uses 0.173 mm traces and a 0.100 mm gap: 0.446 mm total before clearance to surrounding copper. Each trial still needs matched layer transitions, a continuous ground reference, and a check against the 0.15 mm length-mismatch target.
UVOV via recommendation: Keep the existing route and correct the minimum-hole clamp for the two outer laser-via types only, if the rule can be scoped that narrowly. All three UVOV vias are Bottom ↔ Mid-Layer 2. The nominal 0.260 mm pad / 0.1016 mm laser hole gives a 0.0792 mm annular ring and a 0.85:1 depth-to-hole ratio, within JLCPCB’s published HDI limits. The effective 0.250 mm hole shown in the layout leaves only a 0.005 mm ring. I did not verify which hole size the drill export emits.
A 0.450 mm pad / 0.250 mm mechanical through-via meets the published geometry limits, but it is not a verified drop-in replacement. At the limiter escape, the existing FLAG drill would be exactly at the board’s 0.250 mm drill-spacing minimum, and the added copper on the other layers has not been cleared. If the laser rule cannot be scoped, the fallback is to reroute FLAG and the local UVOV escape to a separately cleared off-pad through-via site.
I recommend validating the laser-only rule and drill export first, then testing the receptacle pair before disturbing either MCU corridor. Do not fabricate or energize this revision.
The read-only review is complete. I’m pausing before any layout or rule changes, as requested. The integrated power work also remains on hold pending source and pack qualification.
Waiting for input
1. Validate the laser-via rule and try USB routing
DRAFT — partial placement only; not manufacturing-ready. Recorded 2026-10-22. Independent final review belongs to the lead. This record does not release the split interface, cable geometry, PCB, or power system.
Motor-safe focused completion — superseding disposition, 2026-10-22 17:04 UTC
This is the latest status and supersedes every earlier pose, check-count, motor-rework proposal and connectivity statement below. The bounded placement study FAILED; motor phase connectivity is recovered, not traded for fit. The focused brief fixed J1 at its original pose, U1/C1 and all fourteen old Bottom parts, allowed only J2/J3/R10–R21 and interface labels to move, and allowed at most two genuine alternatives plus safety/label cleanup. Both alternatives were performed; no further placement search is claimed.
Assigned-item accounting
Completed: read the prior report/current layout; FIRST restored J1 to (0,-9.1)/0° Top; tested an edge-aligned upper arrangement and a genuinely different lower arrangement; rolled back resulting shorts; cleaned interface silk; performed fresh DRC/ERC/routing inspection and a complete direct preservation diff. All four original phase connections are recovered. U1/C1 and old Bottom poses stayed fixed.
Failed: complete fourteen-part placement and all twelve series resistors immediately behind FFC. Thirteen interface parts have short-free on-board reservations, but R13 is explicitly offboard, and the eleven on-board resistors are unaccepted distributed reservations, not a qualified close bank. J2 retains one edge warning. No mechanical service-envelope release is claimed.
Unattempted: all copper deletion, motor rework, new routing/autorouting, circuit/pinout changes, resize/stackup changes, added Bottom parts, testpoints and manufacturing release. No reviewer was spawned. Batch completion is not overall design completion.
Actual final poses — all Top
Coordinates are board mm/degrees. The table includes all fourteen interface parts and restored J1; no other old Top part changed.
Table
Ref
x
y
Rotation
Final status
J2
-10.05
-6.5
90
Short-free reservation, mouth −X; edge datum unresolved
J3
7.2
-6
90
Short-free power reservation, wire exit +X
R10
-3.8
9.5
0
Upper reservation; not close behind FFC
R11
-7
9.5
0
Upper reservation; not close behind FFC
R12
3.8
11
0
Upper reservation; not close behind FFC
R13
7.99
-41.56
0
Offboard, unresolved; do not fabricate
R14
5
-10.6
90
Lower-right reservation; not close bank
R15
8
-10.6
90
Lower-right reservation; not close bank
R16
8.2
9.5
0
Upper reservation; not close behind FFC
R17
5
9.5
0
Upper reservation; not close behind FFC
R18
3.7
-4.4
90
Motor-side reservation; not close bank
R19
-7
1.5
90
Left-upper reservation; not accepted as close bank
R20
-7
4.8
90
Left-upper reservation; not close behind FFC
R21
0.6
6.5
0
Upper reservation; not close behind FFC
J1
0
-9.1
0
Original motor pose restored and retained
U1 remains (0,1.5)/0° Top, C1 (6.6,3.7)/90° Top. The entire inherited contact/resistor/local-endpoint table in “Inherited interface capture” remains unchanged: J2 contacts 1–12 go exclusively through R10–R21 respectively, J2 on resistor terminal 1 and local circuitry on terminal 2. J3 stays logical 1 SYS_5V, 2 GND, 3 USB_VBUS. Control n → companion 13−n remains the continuity contract. No local pulls/caps moved to the exposed cable side.
No unsupported proximity relaxation is accepted: for example R10 at y=9.5 is 13.25 mm longitudinally from its J2 pin-1 center at y=-3.75, before any routing. These are safe storage/reservation poses only, not a claim of immediate series protection placement. Actual trace lengths remain unknown because routing was prohibited.
Two alternatives and exact observed blockers
Upper arrangement: J2 (-8.95,6.5)/90° aligns the library edge datum with x=-10; J3 (7.2,-6)/90°; all twelve resistors in a coherent 4×3 upper array at x=-1,2,5,8 and y=6.5,8.7,10.9. Fresh check at 16:54:21 UTC: 50 copper shorts, four via-in-pad findings, three body/clearance findings. J2 overlaps fixed U1 by 3.16 mm²; FFC contacts 4–12 encounter the preserved VREF custom copper and/or fixed U1 VREF pads. This is not solved by deleting obsolete inter-board branches. R20/R21 also encounter C1 clearance. The upper trial was rejected, not retained.
Lower arrangement: J2 (-8.95,-6.9)/90°, with interface reservations redistributed around fixed J1/U1, leaves four copper shorts, two body/clearance findings and one J2 bounds Error, despite zero edge-datum findings. Fresh check 16:55:18 UTC reports J2/J1 body overlap 1.20 mm² and J2/U1 clearance-only conflict. The J2 shield pad intersects preserved ADECAY via autoRouted.auto-layout-a6065b2e-5d08-4864-8dc0-7d78c3c69017.d4f30902-0c43-4c18-9304-9bd6d3727646.SmartVia.ee4993fad33dbc0109fca7298c294a28.ebd74c21-046b-48f6-90cd-abf7228f4add.0-0; R13 intersects motor phase traces on net UID 8b315afc-fb1c-4401-8616-3fef5a7cbd49. Nothing was deleted.
The measured library datum requires J2 origin x=-8.95 at 90°, whereas the retained short-free reservation x=-10.05 puts that datum at -11.10, 1.10 mm outward from the left edge. In the edge-aligned trial its depicted back-body edge is x=-2.85; fixed U1's occupied box begins x=-3.795, a 0.945 mm horizontal intrusion when their longitudinal envelopes meet. Upper-body trial y=6.5 spans y=1.95…11.05 and intersects the driver. Lower trial body spans y=-11.45…-2.35; its lower mount copper reaches approximately y=-12.45, only 0.05 mm inside the physical outline, and the fresh bounds check still fails. These exact trial constraints do not establish global geometric impossibility or a qualified minimum resize.
Targeted safety cleanup restored the prior short-free J2 x/y and removed R13 from phase copper. Its one attempted safety reservation at (7,-0.5)/0° encountered three shorts and one via-in-pad finding involving existing nFAULT/STEP copper; R13 was then returned to its inherited offboard pose instead of continuing a third arrangement search. No motor part was moved to make room.
Next decision, not an unauthorized change: retain this incomplete motor-safe checkpoint for lead review; if completion is still required, approve a specific interface-only mechanical alternative (for example permission to source a different FFC footprint/connector) or explicitly revise the edge/close-bank requirement. No motor-copper rework is requested or authorized by this report, and no new connector qualification was attempted.
Motor restoration, stale copper and direct preservation evidence
Final J1 signal pads return to their original world centers: (-1.5,-7.16), (-0.5,-7.16), (0.5,-7.16), (1.5,-7.16). No pad geometry or trace was changed. Final routing state and fresh airwire DRC both show 20, down from the prior 24, with no MOTOR_A1/A2/B1/B2 airwires. The introduced four phase opens are recovered; zero introduced phase opens remain. The intermediate 22 count immediately after restoration included duplicate LINK_DIR/MOTOR_DIR findings while interface shorts still existed; it is not the final result.
The twenty remaining gaps are the twelve LINK_* nets; local 3V3_REF, MOTOR_DIR, MOTOR_NENBL, MOTOR_NFAULT, MOTOR_NSLEEP and MOTOR_STEP; and two SYS_5V gaps (J3 plus inherited U1 VM::19). Moving new interface pads does not reconnect their old-header stubs. 43 redundant items/seven groups remain; the extra four stale phase groups caused by the previous J1 move are gone. All retained stubs are untouched, not blindly classified for deletion.
The complete 8d000c88 → final layout diff, 548 lines, was read to its end after the last label edit. Changes are limited to interface element poses/explicit zero rotations, the restored J1 explicit 0° rule (computed pose identical to baseline), interface-owned text/rulesets, and the generated GND exception below. No route-segment, smart-via, fill-source, polygon-source, outline, stackup, U1/C1, old Bottom pose or side delta appears. Separate schematic diff returns “no textual changes.” This is direct evidence, not merely unchanged counts.
Generated-copper exception remains: GND node 8c7fed0e-23a9-47f8-83d6-de22d5110f50.via.stitch.5 is now (-7.5,-7) versus baseline (-5.925,-7.375). The former batch's final (-7.5,-5.8) is superseded. No direct generated-node mutation was retried; no explicit via/trace move was requested. Source motor geometry is unchanged, but exact displayed/computed whole-copper identity is NOT claimed. Placement also changes computed pour clearances; final computed GND areas are Top 325.921, Mid1 442.874, Mid2 444.909, Bottom 403.457 mm², each one island/six generated stitches.
Outline remains 20×25 mm, x±10/y±12.5. Four-layer HDI stackup remains 1.53 mm substrate, dielectric 0.086/1.323/0.086 mm and copper 0.035/0.018/0.018/0.035 mm. Bottom read-back contains exactly the fourteen poses in the preserved Bottom table below, unchanged; their absence from the full final diff confirms preservation. No Bottom labels or other old-part rules were changed in this focused batch.
Pre-deletion inventory / actual subset
Proposed segment deletion inventory: EMPTY. Actual removed subset: EMPTY. No deletion was attempted, so there are no removed segment IDs/net/location/reason/affected-pad rows to inventory. The identified upper/lower obstacles include actual VREF/ADECAY/phase circuitry, which was preserved. Any future deletion must first append its exact pre-deletion rows to this same file and successfully persist them; the redundant-copper list is not deletion permission.
Fresh final checks and label read-back
Final DRC/placement review 2026-10-22 17:03:50 UTC, after the last label change; ERC 17:02:48 UTC, with no subsequent schematic edit:
Table
Check
Findings
Disposition
Copper shorts
0
Success
Via in pad
0
Success
Body overlap
0
Success
Keepout
0
Success
Pad access
0
Success
Decoupling-loop area
0
Success; fixed motor passives retained
Outside board
1 Warning
R13 offboard, explicit unresolved blocker
Edge placement
1 Warning
J2, 1.10 mm datum nonalignment
Silk label/pad overlap
0
Success; earlier 16/14 warnings cleared
Airwires
20 Errors
Interface/inherited gaps above; no new phase opens
ERC
12 Errors
Six inherited unfinished single-pin endpoints and six undriven U1 inputs
Component overrides
23 Info entries
15 new interface-label entries, eight inherited; not electrical errors
Missing footprints, invalid layer, floating copper, under-connected vias and protected intrusion also returned zero findings at 16:59 UTC, after the final component move; later mutations were interface-text-only. No full manufacturing or unreported neckdown pass is claimed.
Silk cleanup uses component-owned text selector rulesets only: primary reference labels moved clear of copper; all twelve confirmed duplicate REF prints disabled (not component/pad deletion), leaving one active reference per resistor. The value nodes were already inactive and are unchanged. Final full diff confirms all twelve duplicate active flags are false; R15's retained primary is restored to 1 mm font. J2 reference is beside its back edge at approximately (-3.355,-6.5); J3 at (7.2,-2.356). No motor labels were moved. Copper-overlap success does not certify all text-to-text/actuator/enclosure clearances; final fabrication review remains open.
Access, assembly constraint and unchanged release holds
J2 remains mouth −X, control J2 (8.5,14)/270° mouth +X. The retained draft y=-6.5 requires companion-center Y = control-center Y +20.5 mm for a parallel, coplanar top-up centerline match; pin reversal remains n→13−n. The edge warning means this is not a released assembly datum. No valid 50 mm cable gap, board-center X separation, insertion depth, latch-open, cable bend or enclosure envelope is released.
J3 now exits +X, separated from the −X FFC corridor; top-entry mating/removal access must remain open. Restored J1 exits −Y, as at baseline, with no interface body placed in its outward motor-plug corridor. Eleven on-board resistor reservations have no body/pad conflicts in final checks, but those checks do not include the complete mated housings, open FH12 actuator, finger/tool envelope or strain relief. Their physical service access is unqualified, not assumed from a clean 2D check.
All inherited holds remain unchanged: continuity before power; ACH 2 A/AWG28 return zero rating headroom and thermal qualification; lateral tab ±2.35 mm dimension unverified; resistor DC proof only for ≤11 V endpoint/≤5.5 V ground-difference assumptions, not backpower/hotplug/ESD/startup safety; six unfinished power endpoints and charger/boost absent. Qualification source remains the linked Low Profile Interface Decision Study below. No powered release is implied.
HISTORICAL: superseded by the motor-safe focused completion section above, including its restored J1 pose and prohibition on requesting motor rework yet. Broader Top re-placement was approved for this earlier study; Bottom, outline, stackup, circuit/pinout and unrelated motor copper were to remain fixed. Only identified obsolete inter-board copper could be deleted after a persisted inventory. No new routing was allowed.
Scope accounting
Completed: all fourteen interface parts now have on-board Top reservations; J1 was relocated to the right edge; fresh body-overlap, bounds, copper-short, via-in-pad, keepout, pad-access and decoupling-loop checks have zero findings. U1/C1 and all fourteen old Bottom parts were kept fixed. No schematic changes or new routing were made.
Failed / not released: all twelve resistors immediately behind J2. Eight are in the lower protected-side reservation, but R12, R19, R20 and R21 are explicitly upper fallback reservations, not an accepted relaxation of the brief. J2 still has one Edge Placement Warning. Full latch/plug service-envelope qualification remains open. An automatically regenerated GND stitching-via position differs from baseline; exact preservation of all displayed copper is therefore NOT claimed.
Unattempted: inter-board copper deletion, motor-copper deletion/rework, new routing, auto-routing, board/stackup changes, bottom migration, circuit/pinout changes, testpoints and manufacturing release. Independent final review belongs to the lead; no reviewer was spawned.
Latest exact poses
Board coordinates in mm, degrees CCW; every row is Top. This table contains all fourteen interface parts and the one changed old Top component.
Table
Ref
x
y
Rotation
Status
J2
-10.05
-6.5
90
In bounds; mouth −X; edge warning remains
J3
-7.2
9.2
270
In bounds; power-wire exit −X; top-entry service access required
R10
-2.8
-4.9
90
Lower reservation
R11
-2.8
-7.95
90
Lower reservation
R12
3.8
11
0
Upper fallback; not immediately behind J2
R13
-0.2
-8.2
0
Lower reservation
R14
-0.2
-9.8
0
Lower reservation
R15
-0.2
-11.4
0
Lower reservation
R16
3.2
-4.4
90
Lower reservation
R17
3.2
-7.6
90
Lower reservation
R18
3.2
-10.8
90
Lower reservation
R19
-7
1.5
90
Upper fallback; not immediately behind J2
R20
-7
4.8
90
Upper fallback; not immediately behind J2
R21
7
9.5
0
Upper fallback; not immediately behind J2
J1
6.7
-8.4
90
Motor mouth +X; four old routed phase connections now open
Old Top U1 remains (0,1.5)/0° and C1 remains (6.6,3.7)/90°. All twelve resistors remain between their exclusive LINK_* conductor and the local endpoint; no local pull/cap network moved onto the cable side. The complete J2/R10–R21 map and J3 logical 1 SYS_5V / 2 GND / 3 USB_VBUS table below are unchanged. Component count remains 31; net count remains 37. No new part/cable qualification is asserted.
Preservation evidence and generated-copper exception
The complete 8d000c88 → current layout diff, 289 lines, was read after final placement. It changes only position/rotation on the fifteen elements above, a computed J3 text orientation, and the generated GND stitching item described next. It contains no route-segment, smart-via, fill-source, outline, stackup, U1, C1, Bottom-component or side changes. Separate schematic diff for the same baseline returns “no textual changes.” This is direct diff evidence, not a count-only preservation assertion.
Exception: displayed generated node 8c7fed0e-23a9-47f8-83d6-de22d5110f50.via.stitch.5, GND, changes from (-5.925,-7.375) to (-7.5,-5.8). Placement automatically regenerated this pour stitching position; no explicit routing/via move was requested. An earlier trial regenerated it at (5.775,-4.225). Moving J2 inward removed the calculated pad conflict with its original location, but did not recover the baseline generated position. A targeted baseline-restoration call was rejected with Unknown pcb node uid because this is generated rather than a directly editable source node; that failed call applied no edit. All explicit motor trace geometry, including VREF, remains unchanged, but this generated-GND delta requires lead disposition before claiming exact whole-copper preservation.
Read-back confirms the 20×25 mm outline, x±10/y±12.5, and the unchanged four-layer HDI stackup / 1.53 mm substrate, with dielectric thicknesses 0.086 / 1.323 / 0.086 mm and copper 0.035 / 0.018 / 0.018 / 0.035 mm. Fourteen old Bottom poses were read back and their absence from the complete layout diff confirms no changes:
Table
Bottom ref
x
y
Rotation
C2
3.4
4.5
90
C3
-0.3
4.6
180
C4
-0.4
6.3
0
C5
-0.4
8
180
C6
3
7.5
0
R1
-6
-1.5
0
R2
5.8
-1.5
0
R3
-6
0.5
0
R4
5.8
0.3
0
R5
-6
2.7
0
R6
6.5
4.8
0
R7
-4
5.4
0
R8
-2
-3.2
90
R9
2
-3.2
90
Pre-deletion inventory and actual removed subset
Planned deletion set: empty. Actual removed subset: empty. No segment, via, fill or polygon was deleted, and no deletion tool was called. Thus no segment-ID/net/location/affected-pad deletion rows exist to list. The inherited 43 obsolete-header cleanup candidates remain. No blanket VREF or other motor-copper deletion was used to force fit. The generated stitching-coordinate exception above is not a deletion and is explicitly disclosed rather than hidden in this empty inventory.
Connectivity and DRC findings
Fresh selected DRC/placement checks ran through 2026-10-22 16:43–16:45 UTC after the last component move; ERC ran at 16:40 UTC with no subsequent schematic edit.
Table
Check
Latest findings
Severity / disposition
Body overlap
0
Success
Components outside board
0
Success; edge-mounted connector exemption does not qualify its service envelope
Overlapping copper
0
Success
Via in pad
0
Success
Keepout
0
Success
Pad-access clearance
0
Success
Decoupling loop area
0
Success; U1 and its fixed passives unchanged
Edge placement
1
Warning, J2
Silk label overlap
16
Warnings; inherited self-pad labels plus new cross-pad/neighbor-label conflicts; no silk edit performed
Airwires
24
Errors; routing intentionally not attempted
ERC
12
Inherited Errors: six single-pin nets and six undriven inputs
The selected neckdown check emitted no review entry; no independent neckdown reachability pass is claimed. Additional selected checks for missing footprints, invalid layers, floating copper, under-connected vias, multiple fills and protected intrusions returned zero findings before the final small placement correction. Invalid Pads emitted an inherited Info on U1's repaired footprint, not an Error. These results are not full manufacturing approval.
J1 connectivity was invalidated by its authorized move. Its old phase routes still terminate at original J1 pad locations (-1.5,-7.16), (-0.5,-7.16), (0.5,-7.16), (1.5,-7.16). New J1 pad centers are approximately (4.76,-9.9), (4.76,-8.9), (4.76,-7.9), (4.76,-6.9); all four require future re-routing. Airwires increased 20 → 24, exactly these four phase links. Copper geometry preservation does not mean preserved connectivity.
The other 20 airwires remain the twelve LINK_* J2-to-resistor nets, local 3V3_REF, MOTOR_DIR, MOTOR_STEP, MOTOR_NSLEEP, MOTOR_NENBL, MOTOR_NFAULT, and two SYS_5V gaps. The inherited SYS_5V gap toward U1 VM::19 remains; J3 SYS_5V also remains unrouted. Fresh routing-state inspection reports 65 redundant copper items in 11 groups, up from 43/seven due to four newly stale J1 phase-route groups. None were deleted. No USB differential/RF/high-speed controlled-impedance link was added.
Routed critical nets: none in the routing-review high-speed/RF classification. Motor phase/sense/power loops remain electrically important even though they are not that EM-review class.
Fit constraints and minimum next approval
Two broader arrangements were tried, followed by targeted bound/short cleanup and one diff-driven generated-copper preservation correction, not an unbounded re-pack. Lower-left placement avoided the preserved upper VREF copper, but the first arrangement encountered actual MOTOR_ADECAY copper at y=-3.408401: traces autoRouted.auto-layout-a6065b2e-5d08-4864-8dc0-7d78c3c69017.d4f30902-0c43-4c18-9304-9bd6d3727646.Trace.64e7c60a56da22b2bda28f25d189f682, .Trace.2d93e4c5c708116685d1d20cc5067b40, and .Trace.536dfa04942887e76b8287bb6f7d4217. Their connected route spans approximately x -5.409401…-2.275/y -3.408401…-1.37. These are motor escape copper, not obsolete inter-board traces, and were preserved. The first horizontal resistor column also overlapped J2's back body by 0.05 mm² per affected pair. Vertical-column compaction avoided those overlaps, but its third lower resistor failed the board/body bound; it is now upper fallback R12. Upper-right ACH trials conflicted with preserved nFAULT via (5.7256,7.585); moving ACH to the upper-left avoided this without deletion. A rotated R21 trial also shorted SYS_5V and was corrected.
The current J2 library edge-rule datum is x=-11.10, 1.10 mm outside the left board edge, versus required alignment x=-10. Its body depiction is inside x=-9.55…-3.95/y=-11.05…-1.95, but body clearance alone does not close the edge/mouth datum. Simply aligning that rule by moving J2 to x=-8.95 drives its back body toward U1 and into the narrow resistor/motor-fanout corridor. This is a bounded failed compact-layout study, not a mathematical proof of global impossibility.
Repair plan: (1) obtain approval for a narrowly scoped motor-copper rework/placement study of the lower ADECAY escape and phase fanout, while still retaining the fixed Bottom passives and electrical proximities, or explicitly accept the four upper resistor reservations and qualify the nonaligned J2 mechanical datum; (2) after placement approval, inventory any specific proposed copper removals before deletion and separately obtain routing approval to reconnect J1 and the interface; (3) finish silk/clearance verification and repeat checks. Do not blanket-delete VREF or silently relax “immediately behind.” Lead must also decide whether automatic GND stitching regeneration is acceptable; exact generated-copper identity has not been achieved.
Assembly/access constraints — not a released 50 mm cable geometry
J2 mouth remains −X at 90°, matching the control J2 (8.5,14)/270° mouth +X. For top-up coplanar parallel boards, aligning ribbon centerlines requires companion center Y = control center Y +20.5 mm, because 14−(-6.5)=20.5. Pin-order contract remains control n → companion 13−n, conditional on physical continuity/contact-face confirmation. This is an analytical alignment constraint of a draft pose, not a released jig or board gap.
No fixed board-center X separation, board gap, seated insertion depth or valid straight-50 mm assembly is released. Use the inherited adjustable fixture/measured-cable procedure only after actual mouths and latch-open geometry are checked; do not hide excess cable in a sharp fold or assume the prior harness trial still fits the new longitudinal offset.
J2 has an unobstructed outward left insertion corridor in the inspected 2D layout, and J3 is separated longitudinally on that edge; neither 2D body checks nor absent keepouts certify the open actuator, cable backing, tooling, bow or enclosure envelope. The existing FH12 3D model transform is not reliable service-envelope evidence.
J3 wire exit is −X toward the inter-board gap, with mating/removal access required from above. J1 motor insertion is +X, away from the signal cable. No neighboring footprint occupies those outward insertion corridors in the final image. Actual mated housing, wire bend/strain relief and removal-tool envelopes remain physical-fit holds; no new numeric access dimension was guessed.
Powered-release holds retained
The Low Profile Interface Decision Study remains the qualification source of record. Continuity before power; ACH 2 A/AWG28 return zero rating headroom and thermal qualification; lateral tab ±2.35 mm dimension unverified; resistor DC proof only within ≤11 V endpoint and ≤5.5 V ground-difference assumptions, not backpower/hotplug/ESD/startup safety; six unfinished power endpoints and absent charger/boost. These were not closed or waived by on-board reservations. The unchanged six single-pin endpoints and six undriven U1 inputs are listed in the inherited verification section below. Placement-batch disposition is separate from overall power-board completion.
Historical first assigned-batch disposition
Completed: inspect inherited capture and qualification; perform two bounded placement/check rounds; retain J3 and five resistor reservations; roll back conflicting trial placements; read-only DRC/ERC/routing inspection; implementation record.
Failed within the two-round budget: obtain a valid on-board J2 pose and a complete twelve-resistor bank immediately behind it without disturbing preserved layout. This is a bounded fit failure, not proof that every arrangement is impossible.
Unattempted: routing, old-copper cleanup, old-component movement, board resize, stackup changes, bottom-side migration, new charger/boost circuitry, and manufacturing release. These were outside authorized scope. The overall split-link task remains incomplete.
Inherited interface capture
31 components, 37 nets. Interface parts supplied by the lead before this placement batch: J2 FH12-12S-0.5SH(55) ×1; J3 BM03B-ACHSS-GAN-TF ×1; R10–R20 ERJ-PA3F4700V, 470 Ω ×11; R21 ERJ-PA3F1000V, 100 Ω ×1. Library resistor MPN display omits hyphens. No components or schematic connections were created or changed in this placement batch.
Table
J2 contact
Series resistor
Companion-local endpoint
1
R10 470 Ω
USB_CURRENT_PERMISSION
2
R11 470 Ω
POWER_VALID
3
R12 470 Ω
CHARGE_DISABLE
4
R13 470 Ω
CHARGE_STATUS
5
R14 470 Ω
BAT_SENSE
6
R15 470 Ω
MOTOR_NFAULT
7
R16 470 Ω
MOTOR_NENBL
8
R17 470 Ω
MOTOR_NSLEEP
9
R18 470 Ω
MOTOR_DIR
10
R19 470 Ω
MOTOR_STEP
11
R20 470 Ω
3V3_REF
12
R21 100 Ω
GND
J2 is on the LINK_* side of each resistor; resistor terminal 2 is the local endpoint. J3 logical contacts: 1 SYS_5V; 2 GND; 3 USB_VBUS. Cable pin-number reversal is control n → companion 13−n; verify the actual cable and both connector contact faces by continuity before applying power.
Positions are board millimeters, rotations degrees, all Top. Offboard means deliberately unresolved, not excluded from manufacturing data.
Table
Ref
x
y
Rotation
Disposition
J2
-4.2
-21.8614
90
Offboard; rejected trial poses removed
J3
7.2
-5.8
90
Retained on-board reservation
R10
-3.8
9.5
0
Retained reservation
R11
-7
9.5
0
Retained reservation
R12
7.99
-34.4
0
Offboard
R13
7.99
-41.56
0
Offboard
R14
7.99
-48.72
0
Offboard
R15
7.99
-55.88
0
Offboard
R16
8.2
9.5
0
Retained reservation
R17
5
9.5
0
Retained reservation
R18
7.99
-77.36
0
Offboard
R19
7.99
-84.52
0
Offboard
R20
7.99
-91.68
0
Offboard
R21
0.6
6.5
0
Retained reservation
These are not a qualified routed resistor bank. J2 90° was used to face the mouth toward −X; its retained offboard pose does not define cable alignment.
Bounded placement feedback
J2 (−10.1, 6.4), 90°, and J3 (7.2, −5.8), 90°, Top. Body/keepout checks were clear, but J2 introduced four shorts against the preserved MOTOR_VREF_2V custom copper and an edge-placement warning. Twelve resistors were still offboard.
Shifted J2 to (−10.1, 2.4), 90°, and tried the resistor bank in the upper bay. The VREF shorts cleared, but J2 contact 12 overlapped a preserved nSLEEP via. Combined trial report: seven copper errors, one via-in-pad error, four bounds warnings, C1/R19 clearance conflict, and five introduced silk findings.
Safety rollback returned J2 and the seven problematic resistors offboard, retaining the six reservations listed above. This was removal of known conflicts, not a third fit round. No further fit attempts were made.
No valid final J2 pose exists, so no straight-50 mm-FFC board offset is released. Rejected trial longitudinal center offsets would have been 14−6.4=7.6 mm or 14−2.4=11.6 mm; neither is an approved assembly geometry.
Preserved layout and evidence
Outline remains 20×25 mm, x ±10/y ±12.5; four-layer HDI stackup, 1.53 mm substrate. U1's actual starting pose is (0, 1.5), 0°, Top, not the origin.
All seventeen old components remain at their observed starting poses:
The complete layout diff 1f6c48ae → current, 196 lines, contains only position/rotation rules on the fourteen interface elements. It contains no copper, outline, stackup, old-component, side, or silkscreen mutations. This is direct evidence of preservation during this placement batch, not a count-only assertion.
The broader 19673645 → current layout diff was read to its end (7,850 lines), but component/net ordering and asset-payload serialization make it unsuitable as a fully normalized UID-by-UID preservation proof. Independent review should reconcile the broader capture baseline if requiring that stronger proof. Inherited baseline copper counts supplied by the lead were 157 route segments, 28 vias, 22 smart vias, and one fill; these counts alone are not claimed as geometric identity evidence.
Fresh routing inspection still reports 43 redundant old-header copper items in seven groups; none were deleted. Their removal/rework requires explicit scope approval. Fourteen old parts remain on Bottom: this batch did not turn the existing two-sided board into a one-sided assembly.
Fresh read-only verification after rollback
Reviewed at approximately 2026-10-22 15:37–15:38 UTC:
Success: overlapping copper, via-in-pad, body overlap, pad-access clearance, and keepout checks: zero findings.
Error: J2 outside board and edge placement, because J2 remains deliberately offboard.
Warning: seven offboard resistors R12–R15 and R18–R20. Severity is the tool's classification; these remain unresolved placement blockers.
Warning: twelve resistor designator labels overlap their own pads, R10–R21. Five are on retained reservations; seven are offboard. No label mutations were authorized or performed.
Unrouted: 20 remaining airwires, including the twelve J2-to-resistor nets, motor-side connections, 3V3_REF, and SYS_5V. SYS_5V additionally reports an inherited connection gap toward U1 VM::19; investigate during the authorized routing review.
ERC Error: twelve inherited findings: six single-pin nets and six undriven inputs. The six unfinished endpoint nets are USB_CURRENT_PERMISSION (R10:2), POWER_VALID (R11:2), CHARGE_DISABLE (R12:2), CHARGE_STATUS (R13:2), BAT_SENSE (R14:2), and USB_VBUS (J3:3). Undriven U1 inputs: nSLEEP, DIR/BPHASE, STEP/BENBL, nENBL/AENBL, BDECAY, ADECAY. These were not silenced with invented sources.
Passing the selected conflict checks does not constitute full DRC, electrical-safety, or manufacturing approval.
Holds and next approval
Do not energize before cable/connector continuity confirms contact numbering and reversal.
ACH 2 A/AWG28 return path has zero current headroom at the inherited design limit; harness and thermal qualification remain open.
Lateral tab ±2.35 mm dimension remains unverified; do not use it as a released mechanical datum.
Resistor stress proof applies only to ≤11 V endpoint and ≤5.5 V ground-difference assumptions. It does not establish backpower, hotplug, ESD, startup, or overall fault safety.
Charger/boost implementation remains absent and held; the six unfinished endpoints are intentional design holds, not completed power architecture.
Minimum next approval: narrowly scoped old-layout/copper rework study addressing J2 versus preserved VREF/nSLEEP copper and driver/upper-bay escape access. Do not silently delete copper, move U1, resize, migrate to Bottom, or auto-repack.
Motor-safe focused completion — superseding disposition, 2026-10-22 17:04 UTC
Assigned-item accounting
Actual final poses — all Top
Two alternatives and exact observed blockers
Motor restoration, stale copper and direct preservation evidence
Pre-deletion inventory / actual subset
Fresh final checks and label read-back
Access, assembly constraint and unchanged release holds