The final power/isolation closure executor completed, but I could not retrieve and reconcile its report before tool access ended.
Last independently known state:
- 0 airwires
- 0 dangling traces
- Full DRC previously clean
- Four intentional same-net pad overlaps on PS2 accepted
- High-current routes were still largely 0.25 mm
- Explicit all-layer verification of the ≥6 mm isolation corridors remained pending
Therefore, manufacturing readiness is not yet confirmed. The executor’s latest changes still need to be inspected, followed by fresh DRC, connectivity, high-current copper, and all-layer isolation checks. Execution stopped because your ACUs ran out.