Saved build and remaining verification
Actual schematic and preliminary PCB placement were created this session; do not rebuild.
Saved schematic
Capture executor 7p reports 23 components, exactly 17 nets and ERC zero errors/warnings. Lead independently read all17 saved nets and confirmed output/monitor membership, with no J1 membership.
- J1 Molex0430451200, all12 pins unconnected; rear-view U/L harness mapping and warnings in Role Details.
- J2 Molex0430451000: pins1..9 provisionally B_NEG,B1..B8; pin10 NC.
- J3,J4,J5 Phoenix1715734 each3 ways: B_NEG/B1/B2; B3/B4/B5; B6/B7/B8 respectively.
- J6 Phoenix1715789: pins1..8 B9..B16.
- TP1..TP17 Keystone5019, one per tap in B_NEG,B1..B16 sequence.
- 43 pin-to-net memberships (9×3 +8×2), not43 copper routes. No routing requested or performed.
- J1 NTC owner positions remain isolated with all J1 pins; duplicate B8 wire remains unjoined. High-bank B9..B16 lack battery inputs intentionally.
Board placement
Layout executor ql completed3 mutation calls and reports saved140×90mm rectangle, two1oz copper layers,1.500mm FR4 core,all23 components placed and all17 nets preserved; zero overlap,bounds,keepout,edge-placement violations. Existing Placement Results project document contains positions/evidence (locate its actual slug/short ID). User requested J1/J2 together on left facing out,9/8 balancer banks and17 monitoring pads separate. Placement remains provisional; official Molex drawing verification missing, J2 footprint geometry uncertain. Inherited manufacturing profile metadata still references four layers although actual board reports two; reconcile before manufacturing, without altering the approved two-layer board.
Pending review recovery
Fresh read-only reviewer jw was dispatched to verify actual inventory,net mapping,isolation,stackup/placement and manufacturing metadata. Completion notification arrived, but its report was not retrieved because ACUs ran out. Recover jw report via lifecycle/status before making further edits; do not launch another review blindly. Lead has not independently read back the placed board. Todo verification remains in progress for this reason.
Safety and future work
Not build-ready. Confirm J1 manufacturer-number mapping and J2 harness orientation; check both B8 wires independently before joining; verify connector footprints against official drawings; resolve fault protection and EK-C16S5A suitability for2.6Ah pack (prior research reported30–300Ah application and up to5.5A,not newly sourced). Output screw blocks are generic terminations,not direct balancer-mating connectors. No final routing or manufacturing exports authorized.