Project Starter


PCB component placement is complete on a preliminary 100 × 100 mm, 4-layer board. P4 faces left, USB-C faces down, microSD ejects right, OLED is along the lower/front edge, ESP32 antenna overhangs the top edge, and ADXL345 is isolated in the rigid interior sensor zone.
Open items
  • No component-body or courtyard collisions were found.
  • No routing was performed; 149 airwires remain as expected.
  • Resizing removed 24 legacy GND stitching vias that were outside the new board outline; 33 in-board vias remain.
Next steps
  1. Review enclosure-facing connector, OLED, button, and LED positions.
  2. Confirm mounting-hole locations around the ADXL345 support region.
  3. Approve placement before routing begins.
I’ll read the placement-review requirements, compare them with the current 100 × 100 mm board, and apply any requested placement-only corrections without routing or schematic changes.
I parsed the compact-placement requirements and prepared the full placement brief, but no board changes were made because no ACUs remain.
Remaining work:
  • Add four mounting holes and mechanical keepouts.
  • Re-place all components from scratch near the 70 × 60 mm target.
  • Iteratively shrink and verify RF, ADXL345 rigidity, regulator clusters, connector access, collisions, and overhangs.
  • Produce the requested datasheet-compliance and dimensional report.
  • Stop before routing, as specified.
Set board and place
Clarify mechanical constraints
Placement compliance report

Waiting for input


FCC CE Technical Construction File
Status
Draft outline only; schematic and PCB are not released.
Product
ESP32 vibration monitor using the pre-certified ESP32-WROOM-32E-N4 radio module (candidate LCSC C701341).
Radio Integration Controls
  • Use the exact approved module variant and integrated antenna configuration.
  • Follow Espressif antenna keepout, ground-clearance, placement, and host-board integration guidance during the later PCB phase.
  • Preserve module labeling and end-product regulatory statements.
  • Do not modify RF matching or antenna.
  • Verify host enclosure/material and nearby conductors do not invalidate modular approval conditions.
FCC Work Items
  • Confirm module FCC ID and grant conditions from the selected lot/document revision.
  • Determine whether host verification, unintentional-radiator testing, and/or additional intentional-radiator testing applies.
  • Add required exterior label and user-manual statements.
  • Assess simultaneous-transmission and RF exposure conditions for final use distance.
CE/UKCA Work Items
  • Radio Equipment Directive assessment: EN 300 328, EN 301 489-1/-17, EN IEC 62368-1 as applicable, and EN 62479/RF exposure.
  • RoHS and REACH supplier declarations for all released BOM items.
  • EMC test plan must include both P4 and USB power modes, simultaneous-source mode, Wi-Fi/BLE traffic, microSD activity, OLED updates, and maximum vibration-sampling rate.
Required Technical File Evidence
Final schematic/BOM, PCB and antenna drawings, power and clock diagrams, firmware/radio configuration, module certificates/reports, risk assessment, labeling, user instructions, EMC/RF/safety test reports, declaration of conformity, and change-control record.
  • Status

  • Product

  • Radio Integration Controls

  • FCC Work Items

  • CE/UKCA Work Items

  • Required Technical File Evidence