Diseño Automático de PCB


Thought for 41 mins 25 sec
Thought for 5 sec
Created 3 tasks.
1/3 Check placement, routing readiness, and constraints.

Check placement, routing readiness, and constraints.

Apply permitted layout improvements and route critical and remaining nets.

Verify fresh routing and placement checks; report remaining blockers.

Thought for 17 sec
Awaiting 1 task
"PCB Routing Blockers and Handoff" completed.
I applied partial routing, but the PCB is not complete. No components were moved and no routing rules were changed.
  • Routed several flash and oscillator connections, plus three RF nets; added 16 vias.
  • The whole-board autorouter stopped without adding routes.
  • 225 unrouted connections were reported by the last check. A fresh final DRC check remains outstanding.
The board needs both placement repairs and further routing. The checks found overlapping test points and edge pads, plus overlapping pads in U3’s footprint. The three routed RF nets are also constrained to 0.05 mm width—approximately 115 Ω rather than the intended 50 Ω—so they need correction.
Before continuing, please confirm these changes; I recommend yes to each:
  1. Raise the maximum trace width for RF nets 41, 46 and 62 from 0.05 mm to 0.473 mm, then reroute them for 50 Ω?
  2. Reposition TP6–TP74 away from their overlapping edge pads and fully inside the outline, including TP67/TP68, which block the USB pair?
  3. Repair the U3 (SKY13323-378LF) footprint, whose GND, OUTPUT1 and OUTPUT2 pads overlap, before routing those connections?
The remaining work and blockers were saved in a handoff document. Execution stopped because your account ran out of ACUs.

Waiting for input


Routing handoff (session stopped: ACUs ran out)
Applied this session (targeted route_nets, no parts moved, no rules changed)
  • RF on Top, no vias, curved bends: Net 41 (U1:BRF_ANT to C28:P1), Net 46 (U1:RF_TR_5 to FL1:HB), Net 62 (U1:RF_TR_2 to C27:P1). Width is 0.05 mm (about 115 ohm) because a net width-rule maximum caps it. The 50 ohm width over the Mid-Layer 1 GND fill is 0.473 mm. Needs approval to raise the width max on these nets to 0.473 mm, then a reroute.
  • Flash: Net 40, Net 44 and Net 75 are routed, plus Net 2 U1:GPIO[28] to R3:P2. Open: Net 2 U2:~CS to R3:P2 (search hit the exploration limit), Net 97 U2:DO to U1:GPIO[31] (exploration limit), and Net 65 U2:IO3 to U1:GPIO[33] (blocked by Net 44/Net 40 copper at the U1 pads).
  • Oscillator: Net 25, Net 66 and Net 51 are routed. Net 87 C25 to Y2 is routed. Open: Net 87 U1:GPIO[23] to Y2:P2 (via-in-pad, blocked between the Net 51 and Net 93 pads).
  • 16 through vias (0.6/0.3 mm). Airwires went from 236 to 222 (the post-route DRC count reads 225).
Not done
  • autoroute_remaining (job auto-layout-71dcdc4c...) did not run: the account was out of credit. Proposed protectNets: Net 41, 46, 62, 40, 44, 75, 25, 66, 51. Proposed deferNets: Net 10 and Net 39 (USB).
  • USB diff pair, rails (Net 1, 3, 5, 18, 54, 89), BGA fanout and RF interconnect Nets 17, 24, 47, 59, 68, 74, 91, 92 were not attempted.
  • No fresh full DRC or placement check after the last edit.
Blockers that need user approval (placement)
  • About 70 test points (TP6 to TP74) sit exactly on top of the *_MCU edge-pad parts (for example TP68 on USB_DM_MCU and TP67 on USB_DP_MCU). Their pins overlap pins of different nets and lie partly outside the board outline. The router drops these pins from their nets. Fix: move each test point (or each *_MCU pad) apart and inside the outline. This needs approval for each named part.
  • U3 (SKY13323): the GND, OUTPUT1 and OUTPUT2 pads overlap, so the footprint is probably defective. Check the footprint before the RF switch nets can route.
  • 69 overlapping-copper DRC items remain, most likely from the overlaps above.
  • Applied this session (targeted route_nets, no parts moved, no rules changed)

  • Not done

  • Blockers that need user approval (placement)