Light Pipe Design


Created a parametric set of four individual clear-PETG light pipes, aligned with the existing lid holes and LEDs.

3D Model

; detailed parameters are in Light Pipe Insert.
Open items
  • The Ø2.85 mm stems have a tight provisional friction fit in the Ø3.0 mm holes.
  • Physical fit, brightness, and optical crosstalk require a test print.
Recommended next steps
  1. Print caps-down in transparent PETG with supports disabled and a removable 3–5 mm brim.
  2. Use solid infill, slow external walls, and verify that the slicer shows four separate parts.
  3. Test one pipe first; lightly sand or polish the optical ends if needed.

Light Pipe Insert
Deliverable and status
Completed: created and placed a matched four-piece set as one parametric Build123d Compound and one root-level model node, with four intentionally disconnected solids. Each inserts from above; no carrier, snap, barb or enclosure modification.

3D Model

Design view of Light Pipe Insert
  • Asset: water-level-four-led-light-pipe.build123d
  • Node: Four LED Light Pipes
  • Node UID: 025ae7eb-57cc-4d02-88b2-c13bd828a002
  • Parent: Root. Position: (45,-50,0) mm. Rotation: (0,0,0) degrees. Scale: (1,1,1). Z-up.
  • Authored reserved clear finish: #d8ecff; physicalMaterials=true; showEdges=true. Rendering material is a visualization finish, not a claim of optical-grade acrylic performance for printed PETG.
Exact driving parameters (mm unless noted)

Table


ParameterValueBasis
PROCESSFDMRequested prototype process
MATERIALclear PETGRequested material
NOZZLE_D0.4Requested nozzle
LID_BOTTOM_Z18.5Current lid source
LID_TOP_Z20.9Current lid source
HOLE_D3.0Current lid source
PROVISIONAL_DIAMETRAL_CLEARANCE0.15Uncalibrated printed fit
STEM_D2.85HOLE_D minus clearance
LED_TOP_Z1.1Installed LED STEP model, not physical assembly measurement
OPTICAL_GAP0.5Nominal design target
CAP_D4.5Separate non-overlapping retaining flanges
CAP_T0.8Lens/cap stands 0.8 above lid
TIP_CHAMFER0.3045-degree stem entry chamfer
CAP_EDGE_CHAMFER0.2045-degree lens perimeter/print-bed chamfer
TIP_Z1.6LED_TOP_Z + OPTICAL_GAP
STEM_LENGTH19.3Lid top to LED-facing tip
TOP_Z21.7Lid top + cap thickness
Straight stem between chamfer and flange. Tip flat diameter 2.25; lens top flat diameter 4.1. Stem extends 16.9 below the lid underside. Cap/stem junction intentionally retains a square seating shoulder: an ordinary 0.5 mm added root fillet would foul the unchanged 3.0 mm hole. These are lightly-loaded optical inserts; avoid lateral force or levering the cap. The unmodified mating geometry takes priority over a general structural-root fillet rule.
Centers and alignment

Table


PipeLid-local XLid-local YRoot XRoot Y
LED19.5512-46.035754.5512-96.0357
LED215.4732-46.035760.4732-96.0357
LED321.5066-45.960766.5066-95.9607
LED427.5676-45.960772.5676-95.9607
All four root centers equal the inspected LED component/model origins and lid-hole centers. LED model geometry is centered in XY. All four source axes are vertical. No Y flip or additional 0.001 model scale is applied.
Geometry evidence and validation
Completed — compile and dimensions: real asset pipeline compiled successfully; 4 solids, 28 faces; total volume 540.7872 mm³. Each solid is 4.5 × 4.5 × 20.1 mm. Overall set envelope is 22.5164 × 4.575 × 20.1 mm. Source bounds are X=7.3012..29.8176, Y=-48.2857..-43.7107, Z=1.6..21.7 mm.
Completed — nominal lid fit: 2.85 mm stems in 3.0 mm holes have 0.15 mm diametral / 0.075 mm radial clearance. Caps seat exactly at Z=20.9, with zero volumetric overlap and intentional surface contact with the lid. The source executes a BRep intersection check against a complete local lid slab minus bore; it rejects any positive collision volume above 1e-7 mm³. The nearby tongue inner straight edge is at Y=-48.7 (tongue half-width 50.3 minus radial wall 1.6); the lowest stem Y=-47.4607 leaves 1.2393 mm clearance, and all posts are well inside the straight part of that edge. Thus the below-lid locating tongue does not interfere. Minimum neighboring cap separation is 5.9220-4.5=1.4220 mm. Four independent optical paths have no clear carrier connecting them.
Completed — nominal LED non-contact: read the installed

3D Model

. Top planar face #183/#202 is at Z=1.1; the body is 1.6 × 0.8 with no geometry higher than 1.1. STEP unit entity #1539 is millimeters. Layout inspection shows model and element Z offsets zero, scale=1, and rotation only about Z. Tip Z=1.6 therefore gives 0.5 mm nominal gap. Source also checks zero intersection with an LED bounding envelope. This is a model-based clearance, not verified physical LED/solder dimensions.
Completed — persisted placement verification: read back the model node after placement: exact asset resolves to its derived GLB, position (0.045,-0.05,0) scene meters, zero rotation, unit scale, Z-up and requested materials/edges enabled. Read back the durable source and visually inspected the pipeline preview: four separate capped vertical stems. No changes were made to the lid, base, PCB or LED models.
Warning — print orientation: pipeline identified 4 downward flange faces totaling 38.0997 mm² in the assembly orientation. These do not need supports in the recommended inverted print orientation below.
Failed — browser editor focus: showing the 3D editor returned 'requester frontend session was not found.' Geometry preview and structured placement read-back succeeded, but a live assembled-browser screenshot was not available.
  1. Download STL/3MF from the model card. Source and STEP are also available there. Preserve four separate solids; split to objects in the slicer if needed.
  2. Flip 180 degrees about X so the flat lens-cap faces sit on a smooth build surface and the stems rise upright. For the authored coordinates the exact rigid print transform is (x,y,z) -> (x,-y,21.7-z) mm, followed by any convenient XY bed translation. All four cap faces are coplanar at print Z=0.
  3. Supports OFF. Flat caps provide the bed footprint; cap-edge bevel expands at 45 degrees in print orientation, the stem steps inward, and the tip chamfer narrows at the top. Do not print in the installed orientation with the flanges overhead.
  4. Starting trial: dry clear PETG, 0.4 mm nozzle, 0.2 mm layers, 100% solid fill, calibrated extrusion and slow outer walls. Use a smooth PETG-compatible surface/release practice; textured plates imprint the optical face. Allow cooling before removal. A brim can assist adhesion, but remove it only from the cap perimeter, not the stem or optical faces.
  5. FDM PETG will generally be translucent rather than optically clear. Polish the flat optical faces if needed without appreciably changing length. Do not assume the clear rendering predicts brightness, loss or cross-talk.
Provisional assumptions / physical acceptance gate
  • Fit and retention are PROVISIONAL. CAD is a clearance fit, not a guaranteed friction fit. Printed hole shrinkage and stem growth may provide light friction, but must be tested. Flanges stop inward fall only; there is no positive retention against outward extraction. No snap/barb is included. Print one pipe first, test in the actual lid, then tune only the named diametral-clearance parameter as needed. Do not force an oversized print or drill the lid as part of this task.
  • LED_TOP_Z=1.1 is verified for the installed generic LED model, not the actual LED MPN, solder stand-off or tolerances. Measure physical LED height relative to PCB top and update LED_TOP_Z before accepting the print. Lid seating, flatness and print shrinkage likewise require physical verification. The 0.5 mm nominal air gap must remain 0.3–0.6 mm after all tolerances; never allow LED contact.
  • PETG transmission, layer scattering, brightness uniformity, ambient-light readability and optical cross-talk remain untested. Independent stems eliminate direct carrier coupling, not all light leakage through the enclosure cavity.
  • No adhesive, sealing, waterproof rating or anti-rattle retention is claimed.
Unattempted: physical print, fit/retention coupon, measured assembled clearance, photometric testing, or whole-board electrical/PCB sign-off. Existing routing-congestion messages returned by layout inspection are outside this mechanical batch and were not remediated.
  • Deliverable and status

  • Exact driving parameters (mm unless noted)

  • Centers and alignment

  • Geometry evidence and validation

  • Print orientation and prototype setup

  • Provisional assumptions / physical acceptance gate