Preserve Existing Copper While Routing Airwires


I successfully mapped all five electrical pins and four shield contacts, but couldn’t retain the replacement: it regenerated ground-stitching vias and introduced clearance concerns, so I rolled back the trial. The original board remains untouched; trial results are documented in the qualification copy.
May I modify local ground stitching and nearby placement in the copy only to complete the replacement?
yes please
I’ll complete the J1 replacement in the qualification copy, allowing local ground-stitching and nearby placement changes as you approved. The original Powerbank board will remain untouched, and I won’t run auto-layout.
Sent message to Würth J1 Replacement Qualification in jharwinbarrozo/powerbank-board-j1-wurth-629105150521-qualification~11y
Würth J1 Replacement Qualification
Starting...
View Thread
I’m working through the replacement’s local placement and ground-stitching interactions in the copy. Verification is still in progress; I haven’t changed the original board.
Thought for 11 mins 55 sec
Thought for 13 sec
Finished background task.
"Würth J1 Replacement Qualification" completed.
Replaced and retained J1 with Würth 629105150521 in the qualification copy only, verified all five electrical contacts and four grounded shields, and adjusted nearby placement and one local ground stitch—the original remains untouched, with no auto-layout performed.
Both original connector footprint errors are cleared; remaining checks show 62 airwires, 69 ERC errors, and one placement error/14 warnings.
J1 Qualification Results records the changes and preservation checks; electrical-rating, assembly, and enclosure qualification remain open, so the copy is not manufacturing-ready.

Additive Routing Assessment
Current blockers — documentation-only review, 2026-10-20
This section supersedes earlier next-step permissions and current-state totals below. No full auto-layout, routing, placement, footprint, rule, trace, via, polygon, or other PCB edits are authorized. Preserve every existing trace, via, and polygon strictly unchanged, including the five connections retained in the prior attempt. Only this project file was edited during this review. Historical routing attempts below remain as evidence, not permission to resume them.
1. Connectivity and DRC findings
Fresh checks reviewed at 2026-10-20T21:15:10.998Z; an independent routing-state read confirms 62 remaining airwires and zero redundant-trace groups. The board is incomplete and not fabrication-ready.

Table


Category / findingSeverityCountEvidence / affected items
DRC: airwiresError62Power, port signals, gate control, sensing, LED and switch nets below
DRC: overlapping copperError1J1 Shield-related pad pair; exact nodes below
DRC: invalid padsError1J1 footprint pad-type mismatch
Placement: switching power stageError1U1 LX to L1 P1: check reports 15.6 mm candidate path versus 10.2 mm air distance, detour ×1.54; CC1 is in the corridor
Placement: body overlapWarning1C16 and Q1, Top, 1.93 mm² overlap
Placement: outside boardWarning1SW1; detailed overhang extent not supplied by this check
Placement: silkscreen overlapWarning11Labels listed below
Totals: 64 Design Rule Checks errors, plus 1 Placement Checks error and 13 placement warnings. These are separate categories; the switching-stage finding is not one of the two non-airwire DRC errors. This check set also reports 44 missing-MPN errors and 5 missing-datasheet warnings under Manufacturing; those are additional release/BOM blockers, not routing failures. Older reports of 68 airwires, 86 DRC errors, a second outside-board warning, or 12 silkscreen overlaps are historical, not current.
The LX finding is a placement/routability estimate, not proof of an existing 15.6 mm trace. LX still has an airwire; the current trace-node inventory contains 19 segments on five other nets only.
J1 evidence: component UID 6633d8d8-bbef-b80c-0f60-3ec9f4be4bfa; reported overlapping children __33bfc20b-cc21-0154-0a7b-4ce71d922d54 and __4bef03c9-8c6a-98f5-1024-268a09caf772; invalid footprint child __88631116-c904-8ab6-c37e-b8c28d2de644. The fresh check confirms these findings but does not establish the correct manufacturer land pattern or whether shield assignment is intentional.
Remaining routing backlog
Names below are the routing-state names. Counts are missing connections, not numbers of nets. The endpoint table in the earlier routing-attempt section remains valid with its stated exclusions and J2 pin-label substitutions.

Table


NetAirwires
Net (C18 - P2)5
Net (CC1 - P1)1
Net (CC2 - P1)1
Net (D3 - A)2
Net (D4 - A)5
Net (DMA1 - P1)1
Net (DMA2 - P1)1
Net (DMC - P1)2
Net (DPA2 - P1)1
Net (J1 - D+)1
Net (J2 - D+)2
Net (Q1 - S)9
Net (Q3 - D)3
Net (R2 - P1)1
Net (R2 - P2)2
Net (R12 - P1)2
Net (U1 - BAT)1
Net (U1 - DMB)1
Net (U1 - DPA1)1
Net (U1 - KEY)1
Net (U1 - L1)1
Net (U1 - LIGHT)1
Net (U1 - LX)1
Net (U1 - VBUS)4
Net (U1 - VBUSG)2
Net (U1 - VIN)3
Net (U1 - VOUT2G)1
Net (VING - P1)2
Net (VOUT1G - P1)1
Net (VOUT2 - P1)3
Total62
Current interface endpoints include CC1 to J2 CC and CC2 to VCONN, and Dp1/Dp2 and Dn1/Dn2 pairs. The connectivity also reports DMA2 to J4 D+ and DPA2 to D−. These names merit pin-number/datasheet verification before future routing; this review does not establish that the schematic polarity is wrong.
Silkscreen warnings affect CP1, CP2, CP3, CP4, C3, C20, R10, RNTC1, J4, LED2, and LED3. The checker found no free label spot for the last two.
The current GND pour has 63 generated stitching vias on a 5 mm × 5 mm grid, with one copper island each on Top and Bottom; reported areas are 2136.184 mm² and 2495.707 mm² respectively, with no inner-layer GND area. These are observed metrics, not boundary hashes. Prior routing trials documented regeneration of existing stitching vias despite add-only intent, and were rolled back selectively. A new trace can change dynamic pour clearances and generated stitching even without editing a persisted polygon definition. Neither an unmodified polygon definition nor a clean DRC result proves exact preservation of all computed copper.
The previous BAT trial was rejected for introducing two airwire errors; KEY timed out and then produced a rejected candidate with one additional airwire. These are historical trial outcomes, not newly repeated tests. No feasibility probe or routing trial was run in this review. Full auto-layout remains explicitly prohibited.
2. Routed critical nets
Routed critical nets: none verified. All eight USB-associated D+/D− signal nets retain missing endpoint connections; CC1 and CC2 are also incomplete. The 19 existing trace segments belong only to Net (C1 - P2), Net (C6 - P1), Net (R5 - P2), Net (R6 - P2), and Net (U1 - RSET); no explicit controlled-impedance or differential-pair input rule was returned on the inspected net nodes. This is not proof of signal-integrity compliance. No EM simulation was run; there is no verified completed USB pair to nominate for a meaningful end-to-end EM check in this review. Power-stage integrity still requires separate validation.
3. Repair plan — documented only, no authorization to execute
Every action below is deferred. Keeping the current PCB frozen preserves the board, but does not resolve its open electrical or assembly findings. Both local placement/footprint work and routing completion would be needed in a future explicitly authorized revision; full-board auto-layout is not required or proposed.
  1. Placement and footprint prerequisites first.
    • Verify actual package body/courtyard dimensions for the C16–Q1 overlap. If real, move or rotate one part to eliminate it with assembly clearance. Moving a connected part may require local trace/pour changes; it cannot be assumed compatible with the current freeze. Do not choose an exact displacement before validating package geometry and surrounding copper.
    • Rework the U1–L1 arrangement so the inductor faces the LX exit and CC1 is not in the switching corridor. Prefer assessing a local inductor move before the more disruptive U1 rotation; then design a short, adequately sized switching connection. There is no demonstrated solution that leaves every existing copper feature unchanged. Validate against the IC reference layout and actual current requirements before authorizing geometry.
    • Inspect SW1's body, pads, actuator and intended enclosure/edge relationship. If only intentional body/actuator overhang exists, document mechanical acceptance; otherwise relocate it or revise the outline in an authorized revision. No board-edge change is approved now.
    • Validate J1's exact part/package, pad numbering, shield assignments, hole types and manufacturer land pattern before final routing. Correct the part definition or choose a verified compatible footprint; do not force pad-hole overrides or silence the check. Footprint replacement can disturb pad locations and existing copper and therefore requires separate authorization. Correct connectivity only if the manufacturer pinout and schematic intent support it.
  2. Airwire fixes second, only after a new authorization.
    • Establish current, allowable temperature rise, copper thickness and width/via requirements for the power paths. Existing generic widths are not power-current validation. Verify connector pin mapping before routing interface signals, especially the J4 naming discrepancy above.
    • Route missing power/ground connections, then interface signals, then gate/control/sense/indicator connections in small verified batches. Treat BAT/KEY regressions as diagnosis tasks rather than forcing acceptance. Do not delete the five already-retained connections.
    • Before any additive routing under an unchanged-copper requirement, obtain a demonstrated preservation mechanism for persisted traces/vias/polygons and generated stitching/pour geometry. Record identifiers and full exposed geometry, compare after each authorized change, and reject any change to pre-existing objects. Read-only snapshots alone do not prevent regeneration; arbitrary keepouts or freezing pours would themselves be PCB changes and are not authorized.
    • If exact preservation cannot be guaranteed, retain the current board frozen. A separate experimental copy or a localized repair revision would require a new user instruction; neither was created here. Do not silently redefine preservation to mean only unchanged polygon definitions.
  3. Clearance, copper and manufacturing checks third.
    • After authorized repairs and routing, verify that J1 overlapping-copper and invalid-pad errors are resolved by the validated footprint/connectivity remedy, not a global clearance relaxation; rerun placement and all DRC categories.
    • Resolve the 11 label warnings through label-only relocation/rotation or approved reduction/removal of obstructed labels. These are non-copper fixes but still PCB edits, so none are permitted now. Do not move LED parts merely to fix label placement.
    • Complete MPN/datasheet metadata and validate footprints; require zero unresolved airwires, no unexplained shorts/invalid pads, accepted mechanical findings, verified power sizing and successful preservation comparisons before release. Run signal-integrity checks if the verified interface function requires them; repeat any affected EM check after a future critical-net reroute.
Verification of this task: fresh DRC and routing-state evidence was collected, current trace/net nodes were inspected, and only this assessment file was patched. No PCB mutation or auto-layout tool was invoked. This is a blockers report, not an electrical, thermal, mechanical or manufacturing sign-off.

Latest routing attempt — 2026-10-20, 20:38 UTC
This section supersedes the historical assessment below. Partial routing retained: five connections; 62 airwires remain.
1. Connectivity and DRC findings
Fresh final DRC at 2026-10-20T20:38:51.952Z: 64 errors = 62 airwires + 1 overlapping-copper error + 1 invalid-pad error, zero DRC warnings. Both non-airwire errors are pre-existing J1 footprint issues. Starting state for this attempt was 67 airwires and 69 DRC errors, not the older 68/86 baseline. No new non-airwire DRC errors remain. Redundant trace groups: zero.
Retained add-only connections:

Table


NetConnectionRouter-reported length
Net (C1 - P2)C1:P2–U1:VREG8.933 mm
Net (C6 - P1)C6:P1–U1:BST6.280 mm
Net (R5 - P2)R5:P2–LED8:A2.738 mm
Net (R6 - P2)R6:P2–SW1:17.289 mm
Net (U1 - RSET)U1:RSET–R10:P12.755 mm, one new via
Final additions are 19 route segments and one new through via. All five nets had airwires before the changes. No existing authored trace, via, polygon, placement, board, stackup or rule was deliberately edited. Starting routeSegment count was zero.
Preservation check and rollback
Nine successful connect calls temporarily reduced airwires to 51. However, new LED and NTC routing changed computed GND islands/stitching: four old stitching positions disappeared and three island stitches appeared; generated IDs shifted. This violated the requested preservation constraint despite passing DRC. Only this attempt's new copper on Net (D3 - A), Net (D4 - A), Net (R2 - P2), and Net (R12 - P1) was removed, sacrificing 11 connections. No original copper was deleted.
After removal, all 63 original generated GND stitching via IDs and exact position strings match the starting snapshot, and all ten original authored vias retain their positions and exposed geometry. The five original polygon IDs, positions, layers and full polygonShape strings match the baseline. Original smart-via parent positions were independently compared with historical commit #4e509f22. Final inventory: 5 polygons, 74 physical vias (73 originals plus one new), 11 smart-via parents, 6 fills, and 19 route segments. Dynamic fill clearances necessarily recompute around new traces; no claim is made that computed pour boundaries remain byte-identical. Persisted polygon definitions remain unchanged.
A user-authored part-cache update #4e270bee occurred during routing; no whole-project rollback was used, preserving that unrelated change. J2 pin labels in current reads are CC/VCONN and Dp1/Dp2/Dn1/Dn2 rather than the older labels in the historical table.
Remaining connections and blockers
The complete remaining endpoint list is the historical table below excluding GND and the five retained nets listed above (62 pairs total). For J2, substitute CC for CC1, VCONN for CC2, Dp1 for D+::A6, Dp2 for D+::B6, Dn1 for D-::A7, and Dn2 for D-::B7.

Table


Remaining netsStatus / blocker
Net (D3 - A), Net (D4 - A), Net (R2 - P2), Net (R12 - P1)New routes removed because their combined result changed original generated GND vias; require preservation-aware path constraints.
Net (U1 - BAT)One connect attempt rejected atomically because it would introduce two airwire errors; no copper retained.
Net (U1 - KEY)30-second search timed out; retry with 120-second cap found a candidate but rejected it for introducing one airwire error. No copper retained; retry limit reached.
Net (C18 - P2), Net (Q1 - S), Net (Q3 - D), Net (U1 - LX), Net (U1 - VBUS), Net (U1 - VIN), Net (VOUT2 - P1)Not attempted in this pass; require validated current sizing and preservation-aware power routing.
Net (CC1 - P1), Net (CC2 - P1), Net (DMA1 - P1), Net (DMA2 - P1), Net (DMC - P1), Net (DPA2 - P1), Net (J1 - D+), Net (J2 - D+), Net (U1 - DMB), Net (U1 - DPA1)Not attempted; connector escape and charging-interface routing remain.
Net (R2 - P1), Net (U1 - L1), Net (U1 - LIGHT), Net (U1 - VBUSG), Net (U1 - VOUT2G), Net (VING - P1), Net (VOUT1G - P1)Not attempted; stopped after KEY retry limit and stitching-preservation failure.
Pre-routing check still reports J1 overlapping shield/pad connectivity. Via-at-SMD EPAD and protected VSYS plane messages are advisories. No footprint or placement repair was performed.
2. Routed critical nets
Routed critical nets: none verified. No USB data connections were added and no EM simulation was run. This is not fabrication-ready or an electrical sign-off.
3. Repair plan
  1. Retain the five verified additive connections. Separately review J1 footprint overlap/invalid-pad issues; changes require scope beyond routing.
  2. Before another routing batch, derive explicit path keepouts for all original stitching-via locations and investigate preservation of generated island stitching; check original via identities after every mutation, not just DRC. Do not freeze or alter original pours without approval.
  3. Diagnose BAT/KEY airwire regressions before retrying; do not force acceptance or remove original copper. Establish high-current trace requirements before power-net routing.
  4. Complete remaining connections, then repeat DRC and original-copper comparisons. Current partial result is not complete.
Layer Routing Strategy
Soft orientation preferences used: Top 0°, Bottom 90°, Mid-Layer 1 90°, Mid-Layer 2 0°. No critical-net layer assignments, stackup changes or global rule changes were made. Existing per-net trace-width defaults were used for the retained low-current connections; this is not validation of power-net widths.

Historical assessment — before this retry
1. Connectivity and DRC findings
Assessment date: 2026-10-20. No layout or schematic mutations were made. No routes or vias were added. Routing remains incomplete.
The brief requires every pre-existing trace, via and polygon to retain its identifier, geometry and properties; placements, board, stackup and rules must also remain fixed. This includes caution around generated copper and stitching vias.

Table


FindingInitialFinalAffected items
Airwires6868Connections below
Overlapping copper errors1717J1 shield/pad pair (1); U1 EPAD versus 16 footprint mounting pads
Invalid pads errors11J1 footprint
Total Design Rule Checks errors, including airwires8686Above
Switching power stage errors (Placement Checks)11U1.LX to L1.P1
Placement warnings15151 body overlap, 2 outside-board, 12 silkscreen overlaps
Redundant trace groups00None
Initial full review: 2026-10-20T19:30:09.979Z. Final fresh review: 2026-10-20T19:32:22.370Z (102 total error/warning findings across Design Rule Checks and Placement Checks); final focused overlap/invalid-pad/power-stage review: 2026-10-20T19:32:35.144Z. The final routing-state read independently returned the same complete 68-airwire list and copper-area statistics.
Remaining connections — identical initial and final
Names are routing-state names; some layout-tree net labels differ. Every row is unattempted, blocked by the preservation guarantee described in section 3.

Table


NetRemaining endpoint pairs
GNDU1:AGND–U1:EPAD
Net (C1 - P2)C1:P2–U1:VREG
Net (C6 - P1)C6:P1–U1:BST
Net (C18 - P2)C5:P1–C15:P1; C18:P2–cd2e3dbc-5170-46fa-9d95-6d851b6a5f10.throughHole.0-0; C19:P2–C20:P2; net fill–C3:P1; U1:VSYS4–U1:VSP
Net (CC1 - P1)U1:CC1–J2:CC1
Net (CC2 - P1)U1:CC2–J2:CC2
Net (D3 - A)LED3:A–LED4:K; LED3:A–R7:P2
Net (D4 - A)LED2:A–LED1:K; LED3:K–LED2:A; LED3:K–LED4:A; R14:P1–LED1:K; R14:P1–U1:L3
Net (DMA1 - P1)J3:D-–U1:DMA1
Net (DMA2 - P1)U1:DMA2–J4:D+
Net (DMC - P1)J2:D-::B7–J2:D-::A7; U1:DMC–J2:D-::A7
Net (DPA2 - P1)U1:DPA2–J4:D-
Net (J1 - D+)J1:D+–U1:DBP
Net (J2 - D+)J2:D+::A6–J2:D+::B6; U1:DPC–J2:D+::A6
Net (Q1 - S)C8:P1–Q1:S; C8:P1–R9:P1; Q2:D–R1:P1; Q2:D–R8:P1; Q3:S–R8:P1; Q4:D–R9:P1; R1:P1–C4:P1; R1:P1–Q4:D; U1:VSN–C4:P1
Net (Q3 - D)J3:VBUS–C7:P1; Q3:D–C7:P1; Q3:D–U1:VOUT1
Net (R2 - P1)R2:P1–U1:L2
Net (R2 - P2)LED2:K–LED1:A; R2:P2–LED2:K
Net (R5 - P2)R5:P2–LED8:A
Net (R6 - P2)R6:P2–SW1:1
Net (R12 - P1)RNTC1 pad 894bb458-698d-69b3-3f01-26269517c14e__21f8c67d-7d79-8bc7-dea3-b7045dba1fff–R12:P1; same pad–U1:NTC
Net (U1 - BAT)U1:BAT–C2:P2
Net (U1 - DMB)J1:D-–U1:DMB
Net (U1 - DPA1)J3:D+–U1:DPA1
Net (U1 - KEY)R6:P1–U1:KEY
Net (U1 - L1)R7:P1–U1:L1
Net (U1 - LIGHT)R5:P1–U1:LIGHT
Net (U1 - LX)L1 pad 3ea128e8-509c-9580-285c-abfb20f95667__404d6419-22e0-26f8-d5e7-3b09e0426cd5–U1:LX::14
Net (U1 - RSET)U1:RSET–R10:P1
Net (U1 - VBUS)J2:VBUS_B::B9–J2:VBUS::A9; J2:VBUS::A9–CP10:P1; Q2:S–J2:VBUS_B::B9; Q2:S–U1:VBUS
Net (U1 - VBUSG)Q2:G–R8:P2; Q2:G–U1:VBUSG
Net (U1 - VIN)J1:VBUS–Q4:S; Q4:S–C13:P1; U1:VIN–C13:P1
Net (U1 - VOUT2G)Q1:G–U1:VOUT2G
Net (VING - P1)Q4:G–R9:P2; U1:VING–Q4:G
Net (VOUT1G - P1)Q3:G–U1:VOUT1G
Net (VOUT2 - P1)Q1:D–C9:P1; Q1:D–J4:VBUS; U1:VOUT2–J4:VBUS
Additional existing findings
  • Error: U1.LX–L1.P1 power-stage check reports 15.6 mm route estimate for 10.2 mm air distance (1.54× detour), with U1.CC1 in the corridor. This is a check result, not evidence of an existing completed trace; the layout has zero routeSegment nodes.
  • Warning: C16 overlaps Q1 by 1.93 mm²; SW1 and J2 have outside-board findings.
  • Warning: silkscreen overlaps affect CP3, C3, CP1, CP4, LED3, RNTC1, C20, U1, R10, J4, LED2 and CP2.
  • Read-only pre-routing feasibility check reports two DRC_OVERLAPPING_PINS_DIFFERENT_NETS warning groups: J1 shield/pad and U1 EPAD/mounting-pad group, involving unassigned versus GND connectivity. Its text says those pins would be removed from routing-model nets. No routing job was started.
  • Info: feasibility check also reports via-at-SMD accommodation for EPAD and protected VSYS signal-plane handling. These are routing-model advisories, not changes authorized or applied to the project.
2. Routed critical nets
Routed critical nets: none verified. USB-associated D+/D− connections remain airwired. No EM simulations were run and no impedance compliance is claimed.
3. Repair plan and exact-preservation decision
Primary blocker: no sufficient exact-preservation contract
run_auto_route starts a job routing all traces and has no preservation flag or explicit guarantee for all original copper. It was not used.
mutate_layout_routes(mode="connect") is described as connecting terminals with new routes, and its skill says it keeps copper islands touching the terminals. This is promising for ordinary additive work, but neither its interface nor the skill guarantees immutable IDs/geometry/properties for every original copper object, including dynamically computed pours and stitching vias. The board contains a live GND pour on Top/Bottom with 63 generated stitching vias. A new route can affect computed copper clearance and stitching; there is no exposed freeze/preserve contract for those objects. This uncertainty fails the brief's explicit safety prerequisite. No experimental routing call was made merely to see whether originals would change.
The USB-C breakout tool explicitly replaces D+/D− routing and was not used. No cleanup, neckdowns, ripup, remove-and-reroute, rules, placement, board or stackup edits were performed. Targeted budget consumed: 0 of 10 successful calls. Full-board jobs: 0.
Required next steps, not performed
  1. Preserve current placement and copper. Separately review J1 footprint and U1 EPAD/mounting-pad overlaps; their repair needs scope beyond adding traces. The power-stage placement proposal also lies outside this task.
  2. Obtain a routing interface contract that guarantees preservation of original objects and generated copper, or an explicit clarified scope concerning recomputed pours/stitching. Only then resume airwire routing on the initially airwired nets.
  3. Before high-current routing, establish actual current requirements and suitable widths from the IP5328P documentation and design requirements. Existing computed widths include 0.15 mm VOUT1/VOUT2, 0.254 mm several supply nets, and 0.30 mm GND; these are observed rules, not validated power-current sizing. No high-current copper was added and no datasheet-derived sizing is claimed.
  4. Repeat fresh airwire/DRC checks and original-object comparisons after any future authorized batch. Existing overlaps cannot be fixed by silently modifying protected copper.
Preservation evidence
  • Project head read during baseline and again after all checks: #eb925467, rewriteDesignators, timestamp 2026-10-20T19:22:21.598Z; total history count 5799 both times. No design commit was created by this work.
  • Initial complete tree snapshot: 136 nodes covering layout, nets, polygons, smart vias, physical vias and fills, with input and computed rules. Final copper-only tree: 94 nodes, complete in one response. The exposed original identifiers, parent/net references, positions, polygon vertex strings, connected-layer lists and explicit via properties match the baseline; no additions, removals or changes were observed.
  • Original copper inventory: 0 routeSegment nodes; 5 polygons; 10 smart-via parent nodes; 73 physical via nodes (10 authored + 63 generated GND stitching); 6 fill nodes; 0 zone nodes. Final inventory is identical. The 10 smart-via parents are not additional physical holes.
  • Polygon IDs checked: 40e9d584-1731-4ff1-b35d-8da17c66f589, e9185031-c5ef-4906-8537-295628ea9a76, 56d1d0dd-81f0-4d79-bfa1-241226d52cc5, aee40eea-c5a7-43ae-acd9-384687e52d30, cfa50962-e00b-44b3-a4f2-1ee99027c6c1. Their entire exposed polygonShape strings and positions matched.
  • Authored smart-via IDs checked: 1bc74c0a-54c9-4a0b-a8c3-6e4b160b423a, 1e117e04-f005-4eff-948a-a43a3d7867a1, 6b330b3f-42c4-425c-9cc7-45395bff04eb, 74be0574-6d3f-4137-89fd-5adcf210badc, 8b8c8f7c-2192-430c-975d-f3a593e40b1f, bc13ee82-2a99-41d7-af97-a3d14cfdcf03, cd2e3dbc-5170-46fa-9d95-6d851b6a5f10, ed6ce1e2-8bb1-401e-9092-892b52cd2793, f13fbb68-0f41-43c3-91bb-57c10a7d8a93, fa19fa4b-19f7-4a00-969a-a816d8e1dd87. Each physical child is <parent>.throughHole.0-0, with unchanged 0.6 mm size, 0.3 mm hole, all four connected copper layers and protected=true.
  • GND stitching via IDs 11c756c6df53f4a9380fb5467433b271.via.stitch.0 through .62 all retained their exact exposed position strings and parent fill. Fill IDs are the five polygon IDs plus .fill, and 11c756c6df53f4a9380fb5467433b271.fill.
  • Computed GND metrics unchanged: Top 2130.333 mm² / 1 island, Bottom 2496.916 mm² / 1 island, no inner-layer GND area, stitching 5 mm × 5 mm / 63 vias. The tools do not expose a complete computed-fill boundary hash in these reads; these area/island metrics are not a substitute for a polygon-vertex hash. No independent binary geometry checksum was produced. Exact persisted-state identity is supported by the unchanged project head and no layout mutations; exposed object fields were also compared directly.
  • Board remains 72 × 38 mm, 3 mm corner radius, Standard 4 Layer, 1.30 mm nominal stackup; component placements and rules were not changed.
Assigned-scope status

Table


ItemStatus
Routing skills and tool capability inspectionCompleted
Initial layout, copper snapshot, airwires and DRC inspectionCompleted
Safe routing mechanism determinationCompleted: exact guarantee unavailable
Add copper to remaining airwire netsUnattempted: preservation prerequisite not satisfied
High-current electrical sizing / USB EM verificationUnattempted: no route mutation undertaken
Fresh checks and exposed original-copper comparisonCompleted; limitations above
Overall remaining-airwire routing goalNot completed: all 68 airwires remain
  • Current blockers — documentation-only review, 2026-10-20

  • 1. Connectivity and DRC findings

  • 2. Routed critical nets

  • 3. Repair plan — documented only, no authorization to execute

  • Latest routing attempt — 2026-10-20, 20:38 UTC

  • 1. Connectivity and DRC findings

  • 2. Routed critical nets

  • 3. Repair plan

  • Historical assessment — before this retry

  • 1. Connectivity and DRC findings

  • Remaining connections — identical initial and final

  • Additional existing findings

  • 2. Routed critical nets

  • 3. Repair plan and exact-preservation decision

  • Primary blocker: no sufficient exact-preservation contract

  • Required next steps, not performed

  • Preservation evidence

  • Assigned-scope status