Thought for 1 sec — Determining component dimensions
Thought for 1 sec — Determining component dimensions
Moving footprints.
Thought for 20 sec
Moving footprints.
Thought for 2 sec
Thought for 1 min 3 sec
Moving footprints.
Thought for 13 sec — Considering coordinates and placement
Thought for a moment — Considering coordinates and placement
Moving footprints.
Moving footprints.
Thought for 4 sec
Thought for 1 sec — Addressing overlap issues
Thought for 1 sec — Addressing overlap issues
Moving footprints.
Thought for 6 sec
Thought for 6 sec — Exploring passive arrangement strategies
Thought for a moment — Exploring passive arrangement strategies
Thought for 2 sec — Arranging components efficiently
Thought for 5 sec — Arranging components efficiently
Thought for 15 sec — Considering mounting arrangements
Thought for a moment — Considering mounting arrangements
Thought for 1 sec — Arranging electronic components
Thought for 1 sec — Arranging electronic components
Moving footprints.
Thought for 43 sec
Moving footprints.
Moving footprints.
Thought for 1 sec
Thought for 11 sec
Thought for 10 sec — Rearranging grid components
Thought for a moment — Rearranging grid components
Thought for a moment
Reorganizing component layout
I might need to consider moving some components around to create better spacing. For example, I could put things far right between J_MPCIE and the top at coordinates x 40-60, y 28-42. I see options in the bottom-left, too, avoiding conflicts with J_BAT, J_SIM, and MH16. I could also look at center-left positions and lower center options. It's becoming clear that the initial manual zones might be too crowded, so I’ll need to adjust big connectors to the edges and reserve space for passives. Placing U_CM4 in the center could help.
I have rearrange the the board this is the finaly position of the cm4, mosiac and 4g modem - correct the io board mounting holes to match the offical io board hole locations as they are currently incorrect, also add/correct the fixings and mounts and holes for the m.2, cm4 and mpcie units to suit the quectel em05 and the mosiac, here are the data sheets.
I’ll preserve your manually placed CM4/Mosaic/4G positions, then correct only mechanical items: official CM4 IO mounting holes, CM4 mounting/fixing holes, and M.2/mPCIe standoff holes from the provided datasheets. I’ll source/inspect the official geometry before mutating holes.
Worked for 17 sec
113 days ago
1/4 Extract official CM4 IO mounting-hole coordinates and current layout hole state
Extract official CM4 IO mounting-hole coordinates and current layout hole state
Extract M.2 EM05 and simpleRTK3B mPCIe mechanical fixing requirements from datasheets
Correct/add board, CM4, M.2, and mPCIe mounting holes without moving CM4/Mosaic/LTE modules
Verify mechanical holes and document any remaining datasheet/footprint caveats
Technical Construction File - CM4 PoE UPS RTK Carrier
Status
Draft architecture-stage file. This is not a certification result.
Applicable Regulations To Evaluate
FCC Part 15 intentional and unintentional radiator requirements.
CE RED for radio equipment if sold in Europe.
UKCA radio/EMC requirements if sold in the UK.
ISED if sold in Canada.
Carrier/module-specific cellular approvals for the Quectel EM05 and selected antennas.
Product Description
Industrial Raspberry Pi Compute Module carrier for RTK base-station operation. The board integrates Ethernet/PoE+, external DC input, 2S Li-ion UPS charging, USB hub, GNSS receiver interface, LTE modem interface, SIM interface, watchdog/reset control, and RF antenna connections.
Wireless Technology Summary
Table
Module
MPN
Technology
Frequency band
TX power
Pre-certified status
LTE modem
Quectel EM05, exact variant TBD
LTE cellular
Variant/region dependent
Variant dependent
Must verify module certifications and antenna conditions
GNSS receiver
Septentrio Mosaic-X5 on ArduSimple simpleRTK3B
GNSS receiver
GNSS bands, receive-only
Not a transmitter
EMC/RF layout still important; GNSS antenna path must be protected and low-noise
Required Documentation Checklist
Product block description created from project specification.
Preliminary RF design notes created in this file.
Draft declaration wording created in this file.
Schematics - export from Flux after Phase 1 schematic completion.
PCB layout / Gerbers - export after layout completion.
Bill of Materials with MPNs - generate after component selection.
RF module datasheets, grants, and integration manuals - collect after exact EM05 variant and antennas are selected.
User manual - create after external connectors and enclosure are defined.
Accredited test reports - external lab work required after prototype.
RF Design Notes
LTE main and diversity antennas must follow the Quectel EM05 hardware design guide and approved antenna conditions for the exact module variant.
GNSS antenna path should be 50 ohm controlled impedance with short trace length, via fencing, and separation from switching regulators and high-current LTE paths.
Provisional industrial antenna strategy is SMA or bulkhead-pigtail; exact connector family and enclosure feedthrough are TBD.
RF ESD/surge protection must be selected to avoid degrading GNSS sensitivity or LTE performance.
Final antenna gain, cable loss, and placement must be documented before certification.
Draft Declaration Text
Northerns Of Radwell declares that the product CM4 PoE UPS RTK Carrier is intended to conform with applicable EMC, radio, and safety requirements for the markets where it is sold, subject to final component selection, test reports, and conformity assessment.