Project Redesign Brief


Worked for 5 mins 37 sec
Moving footprints.
Moving footprints.
Moving footprints.
Moving footprints.
Thought for a moment
Thought for 4 sec
Thought for a moment — Planning PCB layout
Thought for 1 sec — Planning PCB layout
Moving footprints.
Thought for 3 sec
Referenced guidance.
Moving footprints.
Thought for a moment
Thought for 5 sec
Moving footprints.
Moving footprints.
Thought for 3 sec
Thought for 2 sec
Thought for 1 sec — Determining component dimensions
Thought for 1 sec — Determining component dimensions
Moving footprints.
Thought for 20 sec
Moving footprints.
Thought for 2 sec
Thought for 1 min 3 sec
Moving footprints.
Thought for 13 sec — Considering coordinates and placement
Thought for a moment — Considering coordinates and placement
Moving footprints.
Moving footprints.
Thought for 4 sec
Thought for 1 sec — Addressing overlap issues
Thought for 1 sec — Addressing overlap issues
Moving footprints.
Thought for 6 sec
Thought for 6 sec — Exploring passive arrangement strategies
Thought for a moment — Exploring passive arrangement strategies
Thought for 2 sec — Arranging components efficiently
Thought for 5 sec — Arranging components efficiently
Thought for 15 sec — Considering mounting arrangements
Thought for a moment — Considering mounting arrangements
Thought for 1 sec — Arranging electronic components
Thought for 1 sec — Arranging electronic components
Moving footprints.
Thought for 43 sec
Moving footprints.
Moving footprints.
Thought for 1 sec
Thought for 11 sec
Thought for 10 sec — Rearranging grid components
Thought for a moment — Rearranging grid components
Thought for a moment
Reorganizing component layout
I might need to consider moving some components around to create better spacing. For example, I could put things far right between J_MPCIE and the top at coordinates x 40-60, y 28-42. I see options in the bottom-left, too, avoiding conflicts with J_BAT, J_SIM, and MH16. I could also look at center-left positions and lower center options. It's becoming clear that the initial manual zones might be too crowded, so I’ll need to adjust big connectors to the edges and reserve space for passives. Placing U_CM4 in the center could help.
I have rearrange the the board this is the finaly position of the cm4, mosiac and 4g modem - correct the io board mounting holes to match the offical io board hole locations as they are currently incorrect, also add/correct the fixings and mounts and holes for the m.2, cm4 and mpcie units to suit the quectel em05 and the mosiac, here are the data sheets.

flux

I’ll preserve your manually placed CM4/Mosaic/4G positions, then correct only mechanical items: official CM4 IO mounting holes, CM4 mounting/fixing holes, and M.2/mPCIe standoff holes from the provided datasheets. I’ll source/inspect the official geometry before mutating holes.
Worked for 17 sec
1/4 Extract official CM4 IO mounting-hole coordinates and current layout hole state

Extract official CM4 IO mounting-hole coordinates and current layout hole state

Extract M.2 EM05 and simpleRTK3B mPCIe mechanical fixing requirements from datasheets

Correct/add board, CM4, M.2, and mPCIe mounting holes without moving CM4/Mosaic/LTE modules

Verify mechanical holes and document any remaining datasheet/footprint caveats

Thought for 14 sec — Considering file access
Referenced guidance.

Technical Construction File - CM4 PoE UPS RTK Carrier
Status
Draft architecture-stage file. This is not a certification result.
Applicable Regulations To Evaluate
  • FCC Part 15 intentional and unintentional radiator requirements.
  • CE RED for radio equipment if sold in Europe.
  • UKCA radio/EMC requirements if sold in the UK.
  • ISED if sold in Canada.
  • Carrier/module-specific cellular approvals for the Quectel EM05 and selected antennas.
Product Description
Industrial Raspberry Pi Compute Module carrier for RTK base-station operation. The board integrates Ethernet/PoE+, external DC input, 2S Li-ion UPS charging, USB hub, GNSS receiver interface, LTE modem interface, SIM interface, watchdog/reset control, and RF antenna connections.
Wireless Technology Summary

Table


ModuleMPNTechnologyFrequency bandTX powerPre-certified status
LTE modemQuectel EM05, exact variant TBDLTE cellularVariant/region dependentVariant dependentMust verify module certifications and antenna conditions
GNSS receiverSeptentrio Mosaic-X5 on ArduSimple simpleRTK3BGNSS receiverGNSS bands, receive-onlyNot a transmitterEMC/RF layout still important; GNSS antenna path must be protected and low-noise
Required Documentation Checklist
  • Product block description created from project specification.
  • Preliminary RF design notes created in this file.
  • Draft declaration wording created in this file.
  • Schematics - export from Flux after Phase 1 schematic completion.
  • PCB layout / Gerbers - export after layout completion.
  • Bill of Materials with MPNs - generate after component selection.
  • RF module datasheets, grants, and integration manuals - collect after exact EM05 variant and antennas are selected.
  • User manual - create after external connectors and enclosure are defined.
  • Accredited test reports - external lab work required after prototype.
RF Design Notes
  • LTE main and diversity antennas must follow the Quectel EM05 hardware design guide and approved antenna conditions for the exact module variant.
  • GNSS antenna path should be 50 ohm controlled impedance with short trace length, via fencing, and separation from switching regulators and high-current LTE paths.
  • Provisional industrial antenna strategy is SMA or bulkhead-pigtail; exact connector family and enclosure feedthrough are TBD.
  • RF ESD/surge protection must be selected to avoid degrading GNSS sensitivity or LTE performance.
  • Final antenna gain, cable loss, and placement must be documented before certification.
Draft Declaration Text
Northerns Of Radwell declares that the product CM4 PoE UPS RTK Carrier is intended to conform with applicable EMC, radio, and safety requirements for the markets where it is sold, subject to final component selection, test reports, and conformity assessment.
Authorized signatory: ____________________ Date: ____________________
Open Items
  1. Select exact Quectel EM05 regional variant.
  2. Select antenna connector family and antenna models.
  3. Collect module certification reports and integration constraints.
  4. Complete schematic and layout exports.
  5. Perform EMC/RF pre-scan and formal testing.
  • Status

  • Applicable Regulations To Evaluate

  • Product Description

  • Wireless Technology Summary

  • Required Documentation Checklist

  • RF Design Notes

  • Draft Declaration Text

  • Open Items