Project Start Assistance


Thought for 7 mins 28 sec
Thought for 6 sec
1/4 Inspect live PCB checks and recover prior routing-repair findings.

Inspect live PCB checks and recover prior routing-repair findings.

Repair supported routing, redundant copper, and local blockers without changing board size.

Verify final connectivity and DRC; report any remaining fabrication blockers.

Add visible schematic wires when schematic geometry editing is available (blocked; outside PCB task).

Thought for 15 sec
Thought for 5 sec
Awaiting 1 task
"USB-C Routing Cleanup" completed.
I checked the PCB and attempted local repairs, but no improvement could be safely retained; unsuccessful changes were reverted. Fresh DRC confirms 9 airwires remain—six USB data, two ground, and one output VBUS—plus 11 protected floating/redundant copper nodes, with zero copper overlaps.
The main blocker is stale USB-C breakout copper that the available recovery operation cannot replace, so the board is not fabrication-ready; this needs Contact Support before further USB routing. Exact findings are in the PCB Routing Repair Report.

Get Free Expert Help

We want to get the prototype into your hands fast. Speak with one of Flux's in-house electrical engineers to review your project.

Collins, Flux electrical engineer
Ryan, Flux electrical engineer
Nico, Flux electrical engineer

Collins, Ryan, Nico — real humans who've shipped real hardware


Waiting for input


PCB Routing Repair Report
Live Reconciliation and Bounded Repair — 2026-10-12
This section supersedes older current-state counts below. Batch incomplete: no net PCB improvement retained in this pass. Board remains 50 × 40 mm; connector positions, four-layer stackup, schematic topology, existing valid copper and U4 pad rules are preserved. Fresh initial DRC was run at 2026-10-12T23:35:12.452Z rather than using earlier counts.
Connectivity and DRC findings
Fresh final selected DRC at 2026-10-12T23:39:10.445Z, followed by a complete routing-state read, reports:

Table


ItemResult
Airwires9: GND 2, OUTPUT_VBUS 1, UP_USB_DP 3, UP_USB_DM 3
Floating copper2 error groups / 11 protected USB nodes
Redundant copper2 warning groups / same 11 nodes, memberships retained below
Overlapping copper, protected intrusions, via-in-pad0 reported
Body overlap, outside-board, keepout0 reported
U4 important overrides10 warnings, unchanged and not waived
Decoupling Loop AreaSuccess with zero reported findings; no quantitative loop evidence supplied
There are no currently reported unlocked redundant groups to delete. No protected copper was removed or unlocked. Routing feasibility check: 64 components, 40 nets, board valid, no feasibility issues. This does not override native connectivity errors or establish manufacturing readiness.
C5 regression reconciled: live C5 is already connected, not at the old staging position. It remains (-18.9, 1.35) mm, approximately 180°, Bottom, near U6 (-18.4248, 0.8115) mm, Top. No HOST_3V3 or C5 GND airwire appears in initial or final routing-state reads. Existing connection is retained, but short-path/dynamic output-capacitor acceptance is still incomplete. C6 supply reconnection remains intact.
Exact attempted changes and restoration
  1. Failed improvement — C5 supply rebuild, #e253ccb5: supported atomic removeAndReroute of ten unprotected C5 HOST_3V3 segments. Router connected C5:P1 to existing U6 supply copper with 17.210052 mm, 0.254 mm, one new via; airwires stayed 9 and tool reported one newly introduced redundant issue. This was worse than the prior session's 11.69 mm reported connection and was atomically reverted to #c4c99bce.
  2. Failed placement experiment — C5 orientation, #debc7566: set Bottom C5 to 0° without moving its center, aiming its supply pad toward U6. Placement reported zero body/keepout/bounds issues but introduced one copper-overlap issue with existing routing. The experiment was atomically reverted to #c4c99bce; no swapped-pad shorts retained. Further C5 trials stopped after these two genuine experiments.
Revert target #c4c99bce is the immediately preceding board state plus the existing Visible Schematic Wiring Handoff project file. Only this pass's experiments were undone; prior C5 connection, C6 routes, U4 correction, and unrelated improvements remain. One targeted routing call persisted experimentally, then was reverted; no full-board autoroute was launched.
Exact unresolved connections and disposition

Table


Net / itemExact connectionDisposition and blocker
GND / D7Trace 52287289-0c3b-4f8e-94ce-7033b861c857 → D7:GND::8Unattempted anew: previous no-path trials exhausted; no proven new local corridor. Needs supported local blocking-route rebuild or verified placement change before retry.
GND / U4U4:PGTH/~FLT → U4:GNDUnattempted anew: post-footprint-correction no-path attempt already exhausted. Preserve verified pad rules; needs a real local escape change.
OUTPUT_VBUS / J4Trace autoRouted.auto-layout-d8da98a8-28dd-4de7-b48c-d9de49736559.6368c3fa-d51c-4f52-a597-befe5d732272.Trace.79299603a444da90534991478d3ce0d8 → J4:VBUS__1Unattempted anew: earlier width/path trials exhausted; fixed connector preserved. Supported local protected-copper rebuild remains necessary.
UP_USB_DMU2:D- → D2:D-; D2:D- → J2:DN2; J2:DN1 → J2:DN2Unattempted unchanged regeneration: previous supported breakout error remains no feasible authored geometry: foreign copper blocks every tie/Y/wraparound candidate. No new supported recovery operation or blocker UID was exposed.
UP_USB_DPU2:D+ → D2:D+; D2:D+ → J2:DP1; J2:DP1 → J2:DP2Same protected-breakout blocker; protected groups untouched.
C5/C6 connectivityHOST_3V3 and GNDCompleted previously and verified live; no remaining native airwire. C5 short supply-path optimization failed in this pass; quantitative decoupling acceptance remains unattempted.
Footprint evidence reconciliation
No U4 footprint mutation was made in this pass. Live rule inspection retains the previously recorded signal rectangles and custom L copper, including numbered rule-to-pad correspondence. Prior original drawing renders from the last session, previously absent from this report, are now durably linked below. These are evidence artifacts from prior direct PDF inspection, not new indexed numerical citations; this pass did not independently remeasure the original drawing. Manufacturer conformity must not be inferred merely from package identity. Retain the dimensions/pin table below with that provenance limitation; assembly/stencil acceptance remains incomplete.

Prior original TI top-view pin-map render

Prior original TI RPW land-pattern render

Safe next alternatives
Obtain supported platform recovery that identifies/removes the exact generator-owned blockers or atomically regenerates J2's stale Bottom USB breakout on Top. For independent ground/power escapes, obtain a local corridor rebuild that preserves protected USB and valid unaffected nets. C5 needs a coordinated placement-plus-local-copper replacement (not a rotation over its connected traces), with constrained short VOUT and return paths. Board resizing is not authorized. A full-board routing job is not a justified remedy for these known local blockers; preflight passes but native errors remain. Final PCB image was inspected through the supported layout_image tool. No USB EM or manufacturing acceptance was run.
Current Focused Continuation — 2026-10-05
Independent cleanup and C6 supply reconnection completed; the repair batch and overall design remain incomplete. Latest layout checkpoint is #a83ca9f5. This section supersedes all earlier counts/statuses below. Board size (50 × 40 mm), stackup, connector positions, schematic architecture, net connectivity, corrected U4 TI geometry, and existing valid routing were preserved. No J2 breakout retry, full-board autoroute, protected-node deletion/unlocking, via-in-pad permission, or waived check was used.
Fresh final evidence
Native DRC/placement review at 2026-10-05T23:57:43.258Z, corroborated by a fresh routing_state read:

Table


ReviewFinal result
Airwires10 errors: GND 2, HOST_3V3 1, OUTPUT_VBUS 1, UP_USB_DP 3, UP_USB_DM 3
Overlapping copper0 reported; all previous 11 overlap repairs remain intact
Redundant copper2 warning groups / 11 nodes, exclusively the preserved protected USB groups 026a and 09c8
Floating copper2 errors / the same 11 protected nodes
Component overrides10 warnings, unchanged U4 land-pattern overrides; not waived
Protected intrusions, via-in-pad, component-body overlaps, keepout, outside-board0 reported
New DRC findings from retained continuation changesNone reported
The broader final DRC/placement query returned only the categories listed as nonzero above. A separate query included decoupling placement/return-path and GND-return-loop checks; it returned no findings for C6, but did not provide quantitative loop/impedance evidence. These results do not constitute manufacturing or dynamic decoupling certification. Preflight again reported 64 components / 40 nets, board valid, no routing-feasibility issues.
Exact retained changes
  1. Completed — unlocked cleanup, commit #9603db35 at 23:52:01.109Z: deleted GND trace eebed344-72a7-4c26-842d-f504f3a92ca9. This resolved the last reported unlocked redundant group. The cumulative resumed cleanup is now 34 unlocked nodes, not 33. No additional unprotected redundant/floating group appears in the final review.
  2. Failed — U4 GND completion: made the single newly justified route attempt after the corrected L-shaped RPW pad geometry, joining U4:GND and U4:PGTH/~{FLT} at 0.15 mm, sameNetViaPadClearance=copper-clearance, 30 s cap, force enabled only because the geometry had changed. Result: blocked-no-path, “the search explored every reachable cell.” Zero copper persisted; airwires remained 11. This residual is individually exhausted and was not retried.
  3. Completed — C6 HOST_3V3 supply connectivity, commit #a83ca9f5 at 23:55:37.863Z: single changed-placement attempt joining C6:P1 to U2's supply island. Added six Top trace segments, 0.254 mm wide, total tool-reported new length 2.57403565 mm, ending at the existing HOST_3V3 via at approximately (-10.0798, -3.6800). No new via was added. Airwires decreased 11 → 10. The six new node UIDs are 0c9c1374-f5ae-42c0-8d60-fba129b97c55, 15914de9-ae38-43a8-aea9-37723dd32487, 51a8653e-8142-4f18-981e-0528440a199c, f4531da0-b05c-47f5-84aa-ab3cbd2853a0, 88394f75-4109-4176-94c7-5b7a473fbb2f, d9f83383-ba33-485e-afb1-55da91767297.
Read-only 2D geometry verifies the C6 route vertices in mm: (-8.375,-2.300) → (-8.883,-2.808) → (-9.645,-2.808) → (-9.899,-3.062) → (-9.899,-3.570) → (-10.009,-3.680) → (-10.0798,-3.680). The existing Top branch from that via to U2:VCC at (-10.0798,-4.4475) adds approximately 0.7675 mm, giving approximately 3.34 mm of surface supply path from C6 to U2:VCC. C6 remains (-7.6,-2.3), 0°, Top. Its GND pad has no remaining native airwire; the GND fill and U2's existing 0.2 mm ground escape to the via at approximately (-10.0798,-6.8680) remain present. Full poured-plane geometry/local return-loop area was not quantitatively established; C6 dynamic decoupling acceptance remains uncertain, separate from its now-completed DC connectivity.
Routing budget: two targeted calls in this focused continuation, one successful persisted call; zero successful calls in the preceding resumed overlap/recovery batch. No repeated unchanged attempt was made.
Individual residual disposition and blockers

Table


ItemStatus in this continuationSpecific blocker / next supported action
U4 GNDFailedNew corrected-footprint attempt returned blocked-no-path. Requires a proven local escape/corridor change before another attempt; corrected TI lands must remain intact.
D7 GND: trace 52287289-0c3b-4f8e-94ce-7033b861c857 → D7:GND::8UnattemptedPrior attempts already exhausted; D7 geometry/placement has not changed. Neither C5 nor C6 relocation proves a new D7 escape. No unchanged retry.
J4 OUTPUT_VBUS: trace ending 79299603a444da90534991478d3ce0d8 → J4:VBUS__1UnattemptedPrior no-path attempts exhausted; no relevant J4 breakout/corridor change occurred. Supported protected-route recovery remains required; no narrowing below the power requirement was attempted.
C5 final output-cap placement and HOST_3V3 reconnectionUnattempted / blocked for acceptanceC5 remains the collision-free staging placement (-21.15,7.3), 90°, Top, not an accepted final U6 output-cap placement. Its near-U6 Top corridor is occupied by valid HOST_5V_PROT copper, including trace suffixes 71828964018c1e462183024c8a3def84 and 85c766ece52e3ea359516cd3310885d9 at X≈-20.7272. Scene inspection reports computed.protected=true despite locked:false; no blind deletion/unprotection was attempted. Merely connecting the remote staging capacitor would not satisfy local decoupling acceptance. Requires a supported neighboring-route rebuild with a validated short capacitor position.
C6 supply connectivityCompletedShort surface route retained, native connectivity verified, no new DRC reported.
C6 full local return-loop / dynamic decoupling acceptanceUnattempted quantitativelyNo native finding remains, but plane-path geometry and loop/impedance were not measured; do not equate zero airwires with dynamic acceptance.
Protected USB groups / six USB airwiresUnattempted by instructionPrevious J2 supported-regeneration failure preserved unchanged. Both protected groups remain untouched; no new J2 recovery attempt.
A Bottom-side C5 near U6's existing HOST_3V3 via (-17.175,0.671) was considered but not applied or validated. The Project Specification does not state a top-only assembly constraint, yet this would change assembly-side usage and needs a deliberate decision plus pad/trace/return-path checks. It is an alternative for the lead, not a claimed repair or proven fit.
Zero-airwire completion remains failed. No USB EM, downstream power-integrity, stencil/assembly, export, or manufacture-ready acceptance was performed. The footprint evidence and preserved protected-group memberships remain recorded in the checkpoint below.
Previous Local Repair Checkpoint — 2026-10-05
Batch incomplete; stopped on supported USB-breakout recovery blocker. Latest layout commit: #da844e9c. The results below supersede the historical counts later in this file. The board is not manufacturing-ready. No schematic architecture, net connectivity, connector placement, board size (50 × 40 mm), stackup, or routing-width requirement was changed. No protected copper was deleted or unlocked; no via-in-pad permission or waived check was used.
Fresh verification
Native DRC reviewed at 2026-10-05T23:46:06.137Z:

Table


ReviewFinal resultComparison / interpretation
Airwires11 errorsStarted at 9; two additional HOST_3V3 connections follow the C5/C6 moves and remain unfinished after the stop
Overlapping copper0All 11 starting errors cleared: four U4 pad-pad shorts, six C5 pad/foreign-copper intersections, one C6 pad/foreign-via intersection
Protected intrusions0 reportedProtection was preserved
Via in pad0 reportedRegressing trial was reverted
Redundant copper3 warning groups / 12 nodes11 protected USB nodes plus one newly exposed unlocked GND stub
Floating copper2 errors / 11 nodesSame two protected USB breakout groups
Component overrides10 warningsExisting U4 board-specific pad rules; warnings not waived
Component-body overlaps, keepout, outside-board0 reportedC5/C6 accepted placement has no reported collisions
Invalid pads, overlapping traces, under-connected vias, pad-access clearance0 reportedRequested review set only; not a substitute for comprehensive manufacturing validation
Preflight reported 64 components, 40 nets, board valid, no routing-feasibility issues. This does not override the native DRC errors or prove breakout recovery is possible.
Footprint reconciliation and evidence
The earlier agent overrides, not just congestion, caused the four U4 pad-pad intersections. They substituted incorrect rectangular corner lands and wrong signal-land dimensions/centers while retaining inherited signal-pad rotation. The actual RPW pattern has L-shaped corner copper. U4 is TPS259474LRPWR, VQFN-HR RPW, 10 pins; the indexed datasheet confirms that package identity.
Independent drawing extraction: the dimensions and pin map below were re-read from the original TI TPS25947 PDF already held in the research workspace, using pdftotext, a rendered page, and PDF vector coordinates. The indexed datasheet query did not provide supported numerical land dimensions or a supported complete pin map; therefore its citations are not used to substantiate those numbers. TI drawing RPW0010A, 4225183/A, 08/2019, Example Board Layout, PDF page 73, is shown below. Pin names/numbers were checked against Figure 5-1 and Table 5-1 on PDF page 5.

rpw-land

Coordinate convention is footprint-local X right / Y up, top-view, origin at package center. U4's existing board rotation remains 180°. Dimensions in mm:

Table


PinFunctionLocal pad center X,YCopper geometry
1EN/UVLO-0.900, +0.875L-shaped, 0.600 × 0.650 overall; upper-left notch
2OVLO/OVCSEL-0.900, +0.2250.600 × 0.250 rectangle, pad rotation 0°
3PG/AUXOFF-0.900, -0.2250.600 × 0.250 rectangle, pad rotation 0°
4PGTH/~FLT-0.900, -0.875L-shaped, 0.600 × 0.650 overall; lower-left notch
5IN-0.250, 00.300 × 2.400; retained previous correct geometry
6OUT+0.250, 00.300 × 2.400; retained previous correct geometry
7DVDT+0.900, -0.875Pin-1 contour rotated 180°; lower-right notch
8GND+0.900, -0.2250.600 × 0.250 rectangle, pad rotation 0°
9ILM+0.900, +0.2250.600 × 0.250 rectangle, pad rotation 0°
10ITIMER+0.900, +0.875Pin-4 contour rotated 180°; upper-right notch
Each corner comprises a 0.600 × 0.300 horizontal arm and a 0.250 × 0.650 vertical arm. For pin 1 the absolute local copper envelope is X = -1.200…-0.600, Y = +0.550…+1.200; the notch is X +0.850. The other corners are mirrored/rotated copies. Nominal R0.05 rounding was encoded with rounded SVG contours. These are custom copper shapes, not bounding-box rectangles or paste-mask approximations.
Updated the eight existing U4 RPW pin 1/2/3/4/7/8/9/10 land rules; no extra competing rulesets were added. The signal rules now explicitly set zero rotation and correct horizontal dimensions. Corner rules set padShape = svgPath(...), customShapeScale = 1, correct centers, and explicit rotation. Read-only scene_tree confirmed all computed positions, signal sizes, rotations, and four custom L contours. The 2D SVG view draws bounding rectangles for custom pads and must not be treated as contour verification. Native overlapping-copper review cleared all four U4 shorts. Paste/stencil optimization was not performed.
Correction to earlier library-defect claim: inspecting the source part showed pre-existing L-shaped SVG corner contours approximately 0.7 × 0.7 mm, despite a computed size field of 1.6 × 1.6 mm. That field alone does not prove physical 1.6 mm square lands. The source differs from the TI recommended nominal geometry, but a severe unusable library defect is not established from the evidence gathered; no duplicate/unsubstantiated part-quality ticket was filed. D7's footprint and placement were left unchanged in this resumed batch.
Exact placement and copper mutations
  1. Trial commit #430126f6: C5 to (-21.5, 3.0), C6 to (-7.5, -3.8). It resolved copper intersections but introduced a C5/D11 body overlap and a via-in-pad finding. Entire trial reverted to #e5d8219f, preserving the completed U4 correction.
  2. Accepted commit #e29af6b9: C5 from (-21.15, 0.8) to (-21.15, 7.3), rotation 90° retained; C6 from (-7.5, -4.5), rotation 90°, to (-7.6, -2.3), rotation 0°. All seven remaining foreign-copper intersections cleared; no body, keepout, boundary, or via-in-pad errors were introduced. C5 is a safe staging placement, not an accepted final LDO output-capacitor placement: it remains too far from U6 and its HOST_3V3 pad is unrouted. C6 is above U2, but supply reconnection and decoupling-return quality remain unfinished.
  3. Deleted 33 unlocked redundant nodes, leaving protected USB copper untouched. The first fresh-review inventory was deleted in one 24-node batch; later read-only reviews exposed additional dangling GND branches, deleted in batches of 7, 1, and 1. These were new node sets, not repeated deletion of the same nodes. Cleanup stopped when the recovery blocker below was encountered; final review exposes another unlocked stub eebed344-72a7-4c26-842d-f504f3a92ca9.
Deleted nodes by commit:
  • #d1cef9c4 (24): 13bccc26-cf6b-495a-ad33-7ef0a026a25a, 2c062756-36da-41dd-b3c3-0aa0600519ef, 367e528e-e5f2-4562-bac4-42c99d249f6c, 39b8c1c4-f74c-4b17-b28c-32cd8f946a2a, 76adec3c-a2d9-40e5-96df-558b8f16416a, 949d176d-a9e4-4aac-a320-f73d36b81268, a0d339d0-f1d1-40a7-924c-511c995ff35c, a696e70d-9d1f-4e72-a47b-60503fa8997d, aa6cdb9a-05b8-4825-b283-af438b9cc71f, fcb74a2f-8383-4049-9353-d01368d09ebe, 1e4d7ffc-3eb3-412c-b385-038e64b966db, 27543a93-6178-4551-b9e3-72f0b927e326, 33524607-2369-465d-bac2-b8b361401ed2, 54ff6d5a-ba0a-4212-a95e-22b7d57a0ee7, 812519d4-c72c-4140-85b6-f74317abb4c0, 8893c131-59fb-42f8-b602-5237c1f49ef9, a842495f-e8cd-4b4f-bedc-ac6988c3165a, cf4fbcff-c304-48d7-8c2d-986eaa9c42b4, def93b9e-179e-4a2f-b711-0967d560ed0b, f53829aa-efd1-4010-b25a-790bcd6fada1, 5a5c9fa0-c35b-4bc5-be6e-920bd89e4d26, 8807007e-2288-41bb-a4a9-0699c429e2d9, e7cf2373-5de8-4881-879f-7c4481cc0c01, 6933f6b1-054c-4eeb-8798-48ff4344dea8.
  • #b1e486b8 (7): 0884914d-f2cb-48da-8ae0-a58a6be4b37b, 371170c0-4278-4671-9365-775b54bfdf80, 4ff08f0c-5140-495e-8f77-15f9fa707d82, 90a2182c-5a93-4762-8af2-bce568e7e39c, b79a90ca-2585-495d-b91c-029d0c4e7ede, d303ae42-5617-4ed2-a811-f49d88f2995e, f59146c4-0d2c-4473-a9ac-752fc3f5cd49.
  • #b54848a3 (1): 740fc917-b593-49e5-ba4c-310a3b551a6a.
  • #da844e9c (1): 90fc2856-4ec0-4f52-8536-d35342c81492.
Recovery blocker and supported alternative
Read-only geometry showed J2's generated USB traces on Bottom while the connector pads are Top, with no authored transition vias. Both groups remain floating/redundant. The supported recovery call explicitly requested J2 UID e2e62c23-a2ae-4552-afa0-3d05fb402779, pair UP_USB_DP/UP_USB_DM, Top, 90 Ω stackup-solved width/gap, 1 mm stubs, natural pad order and default inward direction.
Exact tool result: Error: no breakout copper was produced. Failures: UP_USB_DP/UP_USB_DM (no feasible authored geometry: foreign copper blocks every tie/Y/wraparound candidate). It supplied no blocking-node UID or protected-route recovery operation. No routing commit resulted. Per the assigned stop rule, no further layout mutations or routing calls were made after this error; 0 successful targeted routing calls were used, and no full-board autoroute ran.
Preserved protected group members:
  • Group 026a: 026a3189-4aec-4194-a619-59ed463eee65, 2e65dbf6-9658-4432-b29d-a4c6bc3954c4, 520fd1eb-3dcf-4d40-9452-0ae2c74d18d5, b8397485-547f-42f8-8076-6dae006ac172, dec5070a-2677-43cd-9113-0fbccbf0ae91, e23c84f6-dc92-4490-aae7-999e221b8bbb.
  • Group 09c8: 09c84543-bdc6-4746-b216-0496e50741c4, 0eb8c5a1-462d-4c4c-a841-bde7941090ca, a6eddcc8-f067-4e72-a877-0838289d76f5, ec8c6aae-fcd1-4f34-afdf-e2e595a10b42, f850f877-2705-4d5b-8004-56d07f212320.
Next supported alternative: obtain platform/editor recovery that atomically replaces this generator-owned stale Bottom breakout with a Top breakout, or exposes the exact foreign-copper blockers and a supported local reroute/removal operation. Preserve J2 and other connectors and never blindly delete protected groups. Then finish the unlocked cleanup, restore a short C5/U6 output-capacitor placement with a local neighboring-route rebuild, reconnect C5/C6, and surgically route the residual list below. Another unchanged breakout or GND routing retry is not justified.
An internal tooling-feedback submission was attempted for the recovery failure and custom-pad visualization inconsistency; submission failed, so no report/ticket is claimed as filed.
Exact remaining airwires

Table


NetEndpoint pair / countItem status
GNDTrace 52287289-0c3b-4f8e-94ce-7033b861c857 → D7:GND::8Unattempted in resumed routing phase; unchanged retries were already exhausted before this batch
GNDU4:PGTH/~FLT → U4:GNDUnattempted after footprint correction; stopped before surgical routing
HOST_3V3C5:P1 → auto-route trace ending b3034b1a5d605ec5d84e5683cd162091Unattempted reconnection; C5 final decoupling placement also unfinished
HOST_3V3auto-route via ending 33d6851730a2539260eee1d1d6efb780.throughHole.0-0 → C6:P1Unattempted reconnection
OUTPUT_VBUSauto-route trace ending 79299603a444da90534991478d3ce0d8 → J4:VBUS__1Unattempted in resumed batch; protected-copper recovery was previously required
UP_USB_DMU2:D- → D2:D-; D2:D- → J2:DN2; J2:DN1 → J2:DN2 (3)Failed supported breakout recovery; continuation routing unattempted
UP_USB_DPU2:D+ → D2:D+; D2:D+ → J2:DP1; J2:DP1 → J2:DP2 (3)Failed supported breakout recovery; continuation routing unattempted
Scope disposition
  • Completed: fresh live reconciliation; source-backed U4 override correction and read-back; all 11 copper-overlap repairs; reverting the regressing placement trial; accepted collision-free C5/C6 staging moves; deletion of 33 unlocked redundant nodes; preflight; fresh requested DRC and this file update.
  • Failed/incomplete: all-unlocked redundant cleanup (one newly exposed stub remains at stop); protected USB breakout regeneration; zero-airwire goal; final C5/C6 decoupling placement/routing acceptance.
  • Unattempted: targeted residual routing after the blocker; D7 placement/rebuild; J4 protected-route recovery; USB EM validation, 2 A VBUS power-integrity validation, stencil/assembly validation, and manufacturing export/acceptance. Severe library part-quality filing was not justified by the source inspection.
Completion of the overlap-repair category is not completion of this assigned batch or of the overall production design.
Historical Repair Status — September 2026
Batch incomplete / blocked. The layout was mutated directly, but the done criteria were not reached. No findings were hidden, muted, or waived, and no manufacturing files were generated.
Pre-mutation live inventory
Snapshot: 43 airwires and 118 redundant copper nodes in 14 groups.
Airwires (exact live endpoints)
  • CTRL_CC1: J1:CC1 → stale trace b0836cd2…
  • CTRL_CC2: stale trace 1543e530… → J1:CC2
  • CTRL_USB_DM: J1:DN1 → J1:DN2; J1:DN2 → stale trace 2bd42f41…
  • CTRL_USB_DP: J1:DP1 → stale via a1d7cff4…; J1:DP1 → J1:DP2
  • CTRL_VBUS_RAW: J1:VBUS → stale via 940d6deb…; J1:VBUS → J1:VBUS__1
  • EXT_CC1: stale trace 242192f9… → J3:CC1
  • EXT_CC2: stale trace 1e342bf8… → J3:CC2
  • GND: stale trace d5f23511… → U4:PGTH/~FLT; C7:P2 → U3:GND; C15:P2 → U5:GND; D2:GND → D3:GND; D4:GND::3 → D4:GND::8; D5:GND::3 → D5:GND::8; D6:GND::3 → D6:GND::8; D7:GND::3 → D7:GND::8; D7:GND::8 → R12:P2; fill → C5:P2; fill → C6:P2; fill → D5:GND::3; fill → D7:GND::3; stitching via → C2:P2; J2:SHIELD__2 → J2:GND; J2:SHIELD__3 → J2:GND__1; J3:SHIELD__2 → J3:GND; J4:GND__1 → R18:P2; R2:P2 → D4:GND::8; R14:P2 → U6:GND; R19:P2 → D6:GND::8; U2:GND → C6:P2; U3:GND → U3:OV2; U3:OV1 → U3:OV2; U4:PGTH/~FLT → U4:GND
  • HOST_CC1: stale trace 2e9cbf56… → J2:CC1
  • HOST_CC2: stale trace 4f2b7feb… → J2:CC2
  • HOST_VBUS_RAW: J2:VBUS__1 → J2:VBUS
  • OUTPUT_VBUS: stale trace 6cd0dde9… → J4:VBUS__1
  • UP_USB_DM: stale trace 280ac01b… → J2:DN1; J2:DN1 → J2:DN2
  • UP_USB_DP: stale trace a917968e… → J2:DP2; J2:DP1 → J2:DP2
Redundant groups
  1. 11f5eb03… — 2 nodes
  2. 1eac7829… — 17 nodes
  3. 24468bde… — 15 nodes
  4. 2d80c461… — 10 nodes
  5. 63835c31… — 1 node
  6. auto…041bb5a5…09e8bac8 — 11 nodes (EXT_CC1 stale route)
  7. auto…592a507c…1264217b — 8 nodes (CTRL_CC1 stale route)
  8. auto…77013126…0619e9e1 — 4 nodes (CTRL_CC2 stale route)
  9. auto…8e80d2f5…0f5b8909 — 12 nodes
  10. auto…d3b6171c…4728fd4a — 15 nodes (CTRL_VBUS_RAW stale route)
  11. auto…e59601b0…3d0585c3 — 5 nodes (HOST_CC1 stale route)
  12. auto…f2a79c13…9f967711 — 1 node
  13. auto…f2a79c13…e1efd10f — 1 node
  14. auto…ff0e8a84…3ebe70ae — 17 nodes (EXT_CC2 stale route)
The live routing-state/DRC output did not expose a reliable net/pad mapping for groups 1–5, 9, 12, and 13 before mutation; their exact node UID membership was used for deletion.
Changes applied
  • Deleted all 97 unprotected nodes accepted by the cleanup tool from the 118-node inventory.
  • The tool refused deletion of 21 protected generated nodes. These remained as five groups and later proved to be detached/stale USB-C breakout copper, not justified parallel power/ground paths.
  • Moved F2 from (-9.423, -12.631) to (-3.2, -11.2) to remove its overlap/blockage at J2 while preserving host-input power flow.
  • Added a 0.5 mm HOST_VBUS_RAW pad-escape rule; J2:VBUS__1 remained unroutable.
  • Generated one deterministic neckdown.
  • Cancelled a stale paused auto-route job and started a fresh campaign. The fresh run added 155 routing nodes and reduced airwires from 43 to 29 before declaring J2:VBUS__1 unrouteable.
  • Removed seven new unprotected stale stubs after the routing pass.
  • Ripped HOST_VBUS_RAW and attempted a clean 0.4 mm route from J2:VBUS/J2:VBUS__1 to F2:P1; both paths returned blocked-no-path.
  • Attempted OUTPUT_VBUS completion at 1.0 mm and 0.4 mm; both returned blocked-no-path.
  • Attempted to regenerate J2's protected 90-ohm UP_USB_DP/UP_USB_DM breakout; generation failed because foreign copper blocked every tie/Y/wraparound candidate.
Exact blockers
  • J2:VBUS and J2:VBUS__1, HOST_VBUS_RAW: no route exists to F2:P1 even at 0.4 mm with via-in-pad clearance enabled. The auto-router independently identifies J2:VBUS__1 as an unroutable pin. Recommended correction: remove/rebuild the stale protected J2 USB breakout copper or correct the connector footprint/protected-breakout state so VBUS pad escapes are available.
  • J2:DN1/DN2, UP_USB_DM: one residual airwire remains. Re-authoring the protected breakout fails due to foreign copper surrounding the connector.
  • J4:VBUS__1, OUTPUT_VBUS: blocked at both 1.0 mm and 0.4 mm to the existing OUTPUT_VBUS route. Recommended correction: rebuild the protected J4 connector breakout/near-connector copper, then use a short pad neckdown into a ≥1.0 mm trunk.
  • Protected groups 1eac/2446/2d80 and related nodes: currently reported as floating, redundant, and overlapping J2 pads, but the layout API refuses deletion because they are protected generated copper. This is the principal hard blocker.
Final live review
  • Airwires: 30 errors (mostly GND/fill attachment plus HOST_VBUS_RAW, OUTPUT_VBUS, and UP_USB_DM).
  • Floating copper: 4 errors.
  • Foreign-net/overlapping copper: 7 errors, including protected stale copper overlapping J2 shield/VBUS pads and UP_USB_DP traces.
  • Redundant copper: 5 warnings / 21 protected nodes.
  • Missing footprints / invalid layers: none reported in the requested review set.
  • Fills were reviewed but could not be accepted as final because the board still has disconnected fill contacts and protected floating copper.
USB metrics
Final pair lengths, mismatch, and via counts are not valid/reportable because J2's UP_USB pair is not fully connected and protected stale copper overlaps connector pads. The 90-ohm stackup rule was retained; no impedance rule was waived.
Power geometry
A valid minimum OUTPUT_VBUS width cannot be certified because J4:VBUS__1 remains disconnected. The attempted trunk width was 1.0 mm, with a 0.4 mm pad-escape attempt; neither completed. CONTROL_VBUS and HOST_VBUS remained separate in the schematic/netlist, and the architecture was not changed.
Scope disposition
  • Inventory: completed.
  • Unprotected stale-copper cleanup: completed.
  • Protected stale-copper cleanup: failed — API protection blocker.
  • Placement correction F2: completed.
  • Full routing / zero airwires: failed — protected connector breakout/foreign-copper blocker.
  • Final clean review and USB/power certification: unattempted as acceptance steps because prerequisite connectivity is not clean.
  • Live Reconciliation and Bounded Repair — 2026-10-12

  • Connectivity and DRC findings

  • Exact attempted changes and restoration

  • Exact unresolved connections and disposition

  • Footprint evidence reconciliation

  • Safe next alternatives

  • Current Focused Continuation — 2026-10-05

  • Fresh final evidence

  • Exact retained changes

  • Individual residual disposition and blockers

  • Previous Local Repair Checkpoint — 2026-10-05

  • Fresh verification

  • Footprint reconciliation and evidence

  • Exact placement and copper mutations

  • Recovery blocker and supported alternative

  • Exact remaining airwires

  • Scope disposition

  • Historical Repair Status — September 2026

  • Pre-mutation live inventory

  • Airwires (exact live endpoints)

  • Redundant groups

  • Changes applied

  • Exact blockers

  • Final live review

  • USB metrics

  • Power geometry

  • Scope disposition