I’ll finish the handoff by producing fully corrected BOM and pick-and-place files with the T1-U merged into them, instead of requiring the assembler to combine a separate addendum manually. I’ll also do one final visual orientation check against the live PCB.
U2 is now the exact published Tuya T1-U. This report supersedes the earlier stopped/incomplete checkpoint. The resumed seven-item schematic scope is complete; PCB placement, routing and fabrication qualification remain deferred.
Installed published version: 9d7124b3-6b27-4147-9074-df758194718c
Manufacturer: Tuya Smart; MPN: T1-U.
The lead/user confirmed independent source-part verification and publication before this resumed batch. Read-only consuming-schematic inspection confirms all 21 numbered pins and exact installed identity.
Scope status
Table
Item
Status
Verification
1. Replace U2 allowing footprint change
Completed
Replacement succeeded, preserving and verifying six net connections.
Receiver isolation is exactly U3 RO -> RS485_RO_ISO -> R13 pin2, through10 kΩ to R13 pin1 -> UART_RX_RS485 -> T1-U RX1/J3 TX. There is no direct RO-to-programmer-TX connection bypassing R13. LED1 remains a rail indicator, independent of GPIO.
NC pins:1 P14,2 P16,3 P23,4 P22,5 ADC,6 RX2,7 TX2,9 P9,10 P26,11 P6,12 P8,18 CEN,19 P21,20 P17,21 P15. TX2 is intentionally floating for normal boot; CEN is unused with its internal pull-up.
Replacement behavior and placementRequired
The replacement initially refused the extra connected CBU CSN pin. Only U2:CSN was detached for preflight compatibility while R11 and CBU_MODE were retained. The immediate retry succeeded, then R11 and the obsolete net were removed. No invalid old-module state is left behind.
The successful tool response explicitly said to place U2 on the PCB, i.e. placementRequired was signaled. The response did not expose a literal JSON boolean, so this is reported from its explicit placement warning rather than an invented raw field. PCB placement was deliberately not performed under the schematic-only instruction. The old board routing and exports must not be treated as valid for this new module. Schematic position was preserved by atomic replacement; no separate schematic rearrangement was attempted in this resumed scope.
Review evidence
Final review at2026-09-20T05:56:40Z: Electrical Rule Checks0 Errors,3 Warnings. All migration-caused floating-pin and obsolete-single-pin-net findings are resolved. Remaining warnings:
D1 SMAJ24CA pins1/2 lack informative source-library pin metadata.
These existed before migration; they are not claimed resolved or waived. No Error/Warning entries were returned for the requested schematic-legibility/passive/system categories. Component Review Checks do not run on this consuming board and their absence is not a pass. This is not PCB DRC or manufacturing signoff.
Retained qualifications
Local module bypass C11=100 nF,C12=10 µF and rail bulk C10=100 µF remain. Prior analytical budget established approximately519.4 mA bounded rail operating load with600 mA planning allowance versus the3 A buck; no hardware transient/thermal qualification is claimed.
Four-hole programmer order remains 3V3 G TX RX from programmer perspective. Use3.3 V logic, avoid simultaneous external/programmer and buck drive, and prevent UART back-power during full power-cycle flashing. Firmware/bench validation of the selected T1-U flashing utility remains necessary. The official UART guide's CEN hardware-recovery caveat and the wider design's hot-environment F1 margin remain recorded in Board Bring-Up Plan and Power Budget; neither changes this completed schematic mapping.