Project Start


Worked for 1 hr
Thought for 13 sec
Referenced guidance.
Thought for 21 sec
Board check: 22 issue(s) found
Thought for 25 sec
Reading PCB Placement Handoff's report…
Thought for 21 sec
Routing paused
Thought for 28 sec
Thought for 17 sec
Checking routing progress.
Thought for 24 sec
Awaiting 1 task
"PCB Placement Handoff" completed.
Thought for 1 hr 23 mins
Thought for 23 sec
Managing 1 task
Thought for 25 sec
Thought for 22 sec
Awaiting 1 task
Thought for 20 sec
Awaiting 1 task
"PCB Placement Handoff" completed.

flux

The one authorized auto-route run produced no new copper. Direct cleanup then reduced 56 → 53 airwires, preserving placement, rules, and frozen copper.
The updated routing report records remaining endpoints, individual blockers, DRC findings, and measurements. Zero-airwire completion was not achieved; P2 filled-area verification and final redundant-copper cleanup remain unfinished. The PCB is not fabrication-ready.

Routing cleanup resume results
Checkpoint and scope
2026-10-06, final routing commit #57d37e2f. Bounded continuation of Rev C5.2f standing routing authority, not a completed board or production release. Coordinates below are Flux millimetres; project coordinates = Flux +(40,24.5).
Authority and rules were read in full from the two existing attachment MD files. No sourcing, schematic changes, component moves, rule relaxation, stackup/outline/slot/hole changes, mains changes, or accepted SW/VBST changes were made. The eleven waived body-check keepout rows were not inventoried again.
Assigned-item status

Table


ItemStatusEvidence / limitation
Recover saved operationsCompletedHistory confirmed #32d11850 was the latest unsafe SINK_INT trial.
Remove unsafe retained trialCompletedAtomic revert to #02168497 persisted as #203ff116; previous GND and eight-object cleanup retained.
First-pass GND rip-upCompleted, verifiedPrior commits #692866d0 and #658f66c9 removed468 traces and33 Smart Vias. Fresh GND scene inspection contains only three manual traces and three inactive polygons; zero first-pass GND traces/vias.
Local SINK_INT recoveryCompleted#46759ba1 reconnected U1:IN1− to C18:P2 (8.478mm, one via) and C18:P2 to C42:P1 (4.933mm); those two reconnections remain. New escape via (17.855,5.080) is inside the authorized well.
SINK_INT continuation to R16:P2FailedNew39.108mm trial had a via at(12.380,−1.670) too close to D2:C/12V. #3ece3518 removed only this continuation's18 traces and3 vias, preserving the two local successes. A subsequently constrained attempt returned blocked-no-path, with no mutation.
Remove other redundant first-pass copperCompleted#0489edbe removed15 DRC-redundant nodes: DIM+4 traces;3V3 ten nodes including one via;12V one trace. Native check then exposed one DIM+ open; repaired immediately by #57d37e2f.
DIM+ repairCompletedBottom0.5mm continuation from existing copper at(24.520,11.400) via(24.520,14.400),(26.450,16.330) to W4 at(26.450,16.500),5.899mm; no new via. Final DIM+ airwire count zero.
SRC_FB blocker rerouteFailedAtomic removeAndReroute of the named first-pass blocker was refused as protected. No copper removed; no protection/rule changes made.
Remaining analog/DIM cleanupIncompleteResidual connections below. Previous failed/reverted SINK_FB/PWM_RC1/DIM trials were not reinstated.
Restore P1/P2/P3 and stitchingUnattempted in resumed batchSignal-routing stage is not ready:70 non-GND opens and a concrete protected-copper blocker remain. Preserve traces-first/pours-last order. Pours remain inactive; no claim that ground is connected.
Verification and durable inventoryCompleted for bounded batchFresh native airwire and selected copper DRC checks below. Full-board release audit and required routed-length report are not complete.
Verified final counts
Fresh airwire review at 2026-10-06T12:07:08.165Z: 180 errors /180 airwires =110 GND +70 non-GND. Compared with actual recovered state182, net improvement two airwires. Earlier77-airwire report predates intentional GND rip-up and is not the current connectivity state.
Fresh selected copper DRC at 12:06:15.778Z: one floating-copper error and three redundant-trace warnings, all on preserved manual GND traces. Thus the selected airwire/copper checks contain 181 error findings and three warning findings in total. Overlapping copper, overlapping traces, via-in-pad, protected intrusions, under-connected vias, dangling traces and invalid layer returned no findings in this selected query; this is not certification of the MD's geometric pair clearances or a full-board clean DRC.
Preflight returned five warnings: four intentional shared-pad warnings (J1/W2/W3 and J2/W4/W5), plus C19:P1 unroutable on DIM_P_F. No errors were reported by preflight.
Preserved manual GND nodes:
  • Trace22cb:35.650,7.550→35.650,8.200; redundant warning.
  • Trace41ef:6.367,1.017→8.733,−1.350; floating-copper error and redundant warning.
  • Trace7b1e:37.800,−5.200→37.250,−5.200; redundant warning. They were not deleted because this assigned scope explicitly preserves manual/protected copper.
Complete residual net-count inventory

Table


NetOpensRemaining terminals / connection islands
GND110Pours inactive; bottom and top GND islands require the prescribed P1/P2/P3 and stitching.
3V31Existing first-pass copper→R39:P1
12V1R59:P1→existing first-pass copper
AUX_ADC1U5:IO1→existing copper
BTN_USER1U5:IO9→TP18:P1
DF_E1Q2:E→R64:P1
DIM_EN1R31:P2→U5:IO8
DIM_FB_ADC2Existing via→D4:C/A;TP19:P1→existing copper
DIM_LATCH3U3:CP↔U2:CP;U5:IO14↔R34:P1 and U2:CP
DIM_N_F2R71:P2↔C41:P1 and L3:W2_OUT
DIM_P_F6Existing copper↔Q1:D;C19:P1↔Q1:D;R15:P1↔C19:P1;R46:P1↔R15:P1,R45:P1,R63:P1
DIM_SENSE2Existing copper↔R20:P1;R15:P2↔R20:P1
DIM−2Existing copper↔L3:W2_IN;TP14:P1↔W5 shared terminal island
EN_HALF1U6:INPUTS_B_2→existing copper
EN1Existing copper→TP17:P1
EXP_INT2J3:Pin_5↔U5:IO22↔R36:P1
I2C_SCL1Existing copper→J3:Pin_4
I2C_SDA2J3:Pin_3 and R39:P2↔U5:IO6
LATCH_CLR_N3C22:P1↔existing copper;TP22:P1↔C22:P1;U3:MR↔another existing copper island
LED_STAT_G1U5:IO20→R41:P1
LED_STAT_R1U5:IO21→R42:P1
MODE_NET1U6:INPUTS_B_1→R56:P2
MODE_SEL2U3:D↔U5:IO19↔R35:P1
NTC_ADC1U5:IO2→existing copper
PWM_RC12R11:P2↔C14:P1 and R12:P1
Q_EN3D6:K::1↔R57:P1;TP11:P1↔U2:Q↔R57:P1
Q_MODE3TP12:P1↔R53:P1;U3:Q↔D6:K::2 and R53:P1
Q1_GATE1Manual C19 extension island→first-pass copper
Q1_SRC2R10:P1↔Q1:S and R72:P1
Q9_D1R46:P2→Q9:D
Q13_B1Q13:B→R72:P2
RELAY_RST2TP3:P1↔U5:IO23↔R38:P1
RELAY_SET1R37:P1→U5:IO18
SINK_DIS_12V1Existing copper→U6:OUTPUT_B
SINK_FB3Local escape island↔R18:P1 and C17:P1;Q12:C↔other copper island
SINK_INT1Restored U1/C18/C42 island→R16:P2
SINK_OUT1Existing copper→R44:P1
SPARE_IO151TP2:P1→U5:IO15
SRC_DIS_12V1Existing copper→D10:2
TP7_NET1R68:P2→TP7:P1
UART0_RXD1Existing copper→U5:RXD0
UART0_TXD1TP15:P1→U5:TXD0
USB_DM1U5:IO12→J5:PIN_2
USB_DP1U5:IO13→J5:PIN_3
VRAIL_ADC1Existing copper→U5:IO5
ZC_DET1TP1:P1→R33:P2
No remaining airwire is reported on mains, SW,VBST,DIM+,DIM_P_PROT,SETPOINT,DF_BASE or SRC_FB. This statement concerns connectivity only, not length/clearance compliance.
Specific blockers and next safe work
  • SINK_INT/R16: constrained cheapest path crosses manual VFB trace0c537a60-250a-438f-9ebf-a1bb8a0f3f56 and R8:P2 on Top, protected first-pass SRC_FB trace9152147c2fc71aea25d0d50b2805588e and R18:P2 on Bottom. Candidate path uses Top U1(15.23,8.83)→(14.18,8.83)→(12.455,10.555)→(11.78,10.555)→(9.005,7.78)→(7.88,7.78), then Bottom west to R16(4.375,10.6). It is a blockage diagnostic, not accepted routing. SRC_FB first-pass rerouting is tool-blocked as protected; do not unlock manual copper or alter frozen rules.
  • C19:P1: still unroutable DIM_P_F, pad near(18.18,0.8) per router's bottom-terminal mapping. No placement/rule changes authorized beyond already completed C42/C43/C19 moves.
  • Safety constraint handling: native pair-selector clearance enforcement remains unproven. Earlier retained unsafe via(11.705,−0.995) was atomically removed, and resumed unsafe via(12.380,−1.670) was surgically removed. No known unsafe trial continuation remains.
  • SETPOINT length: connected but ≤12mm requirement is not established. Frozen terminal separation R13:P1(6.025,8.8) to C15:P1(21.675,7.2) alone is15.732mm, so a whole-net≤12mm interpretation cannot be met without a placement change. Do not claim length compliance.
  • Pours: P1 Bottom exact stepped polygon, P2 Top center(9.75,4.85),12.5×11.3mm, P3 Top center(33.15,−2),13×13.7mm are retained inactive, with stitching density0. P2 filled area is currently0 because inactive; gross rectangle141.25mm² is not filled copper area. Restore after routing stage, then4 U1 stitches,≥8 underU5 and one adjacent to each remaining Top GND pad; native checks and geometry review required.
  • Release measurements: SW previously accepted≈6.73mm/6Top0.8mm segments and VBST fiveTop0.2mm segments were untouched, but not newly length-audited here. VIN,SETPOINT,PWM_DIM,DIM+ full chain lengths and filled P2 area remain unverified.5.899mm is only this repaired DIM+ continuation, not the whole J2→F2→D1 chain.
Read-back caveat
Compact scene-tree stores Bottom route X coordinates in a mirrored net-local frame; layout_2d component pad labels can disagree with the routing terminal geometry. All mutations used native terminal identifiers rather than hand-swapping pin labels. The router's actual terminal positions and route-state connectivity were used for these reconnections. This inconsistency should be resolved before final manufacturing acceptance.
Batch versus overall completion
Bounded batch is closed with retained two-local-connection improvement, rejected unsafe continuations,15-node stale-copper cleanup and repaired DIM+ continuity. Overall routing remains incomplete and the board is not ready for release. No bulk autorouter, final pour activation, stitching, manufacturing export or sourcing was performed.
  • Checkpoint and scope

  • Assigned-item status

  • Verified final counts

  • Complete residual net-count inventory

  • Specific blockers and next safe work

  • Read-back caveat

  • Batch versus overall completion