The one authorized auto-route run produced no new copper. Direct cleanup then reduced 56 → 53 airwires, preserving placement, rules, and frozen copper.
The updated routing report records remaining endpoints, individual blockers, DRC findings, and measurements. Zero-airwire completion was not achieved; P2 filled-area verification and final redundant-copper cleanup remain unfinished. The PCB is not fabrication-ready.
2026-10-06, final routing commit #57d37e2f. Bounded continuation of Rev C5.2f standing routing authority, not a completed board or production release. Coordinates below are Flux millimetres; project coordinates = Flux +(40,24.5).
Authority and rules were read in full from the two existing attachment MD files. No sourcing, schematic changes, component moves, rule relaxation, stackup/outline/slot/hole changes, mains changes, or accepted SW/VBST changes were made. The eleven waived body-check keepout rows were not inventoried again.
Assigned-item status
Table
Item
Status
Evidence / limitation
Recover saved operations
Completed
History confirmed #32d11850 was the latest unsafe SINK_INT trial.
Remove unsafe retained trial
Completed
Atomic revert to #02168497 persisted as #203ff116; previous GND and eight-object cleanup retained.
First-pass GND rip-up
Completed, verified
Prior commits #692866d0 and #658f66c9 removed468 traces and33 Smart Vias. Fresh GND scene inspection contains only three manual traces and three inactive polygons; zero first-pass GND traces/vias.
Local SINK_INT recovery
Completed
#46759ba1 reconnected U1:IN1− to C18:P2 (8.478mm, one via) and C18:P2 to C42:P1 (4.933mm); those two reconnections remain. New escape via (17.855,5.080) is inside the authorized well.
SINK_INT continuation to R16:P2
Failed
New39.108mm trial had a via at(12.380,−1.670) too close to D2:C/12V. #3ece3518 removed only this continuation's18 traces and3 vias, preserving the two local successes. A subsequently constrained attempt returned blocked-no-path, with no mutation.
Remove other redundant first-pass copper
Completed
#0489edbe removed15 DRC-redundant nodes: DIM+4 traces;3V3 ten nodes including one via;12V one trace. Native check then exposed one DIM+ open; repaired immediately by #57d37e2f.
DIM+ repair
Completed
Bottom0.5mm continuation from existing copper at(24.520,11.400) via(24.520,14.400),(26.450,16.330) to W4 at(26.450,16.500),5.899mm; no new via. Final DIM+ airwire count zero.
SRC_FB blocker reroute
Failed
Atomic removeAndReroute of the named first-pass blocker was refused as protected. No copper removed; no protection/rule changes made.
Remaining analog/DIM cleanup
Incomplete
Residual connections below. Previous failed/reverted SINK_FB/PWM_RC1/DIM trials were not reinstated.
Restore P1/P2/P3 and stitching
Unattempted in resumed batch
Signal-routing stage is not ready:70 non-GND opens and a concrete protected-copper blocker remain. Preserve traces-first/pours-last order. Pours remain inactive; no claim that ground is connected.
Verification and durable inventory
Completed for bounded batch
Fresh native airwire and selected copper DRC checks below. Full-board release audit and required routed-length report are not complete.
Verified final counts
Fresh airwire review at 2026-10-06T12:07:08.165Z: 180 errors /180 airwires =110 GND +70 non-GND. Compared with actual recovered state182, net improvement two airwires. Earlier77-airwire report predates intentional GND rip-up and is not the current connectivity state.
Fresh selected copper DRC at 12:06:15.778Z: one floating-copper error and three redundant-trace warnings, all on preserved manual GND traces. Thus the selected airwire/copper checks contain 181 error findings and three warning findings in total. Overlapping copper, overlapping traces, via-in-pad, protected intrusions, under-connected vias, dangling traces and invalid layer returned no findings in this selected query; this is not certification of the MD's geometric pair clearances or a full-board clean DRC.
Preflight returned five warnings: four intentional shared-pad warnings (J1/W2/W3 and J2/W4/W5), plus C19:P1 unroutable on DIM_P_F. No errors were reported by preflight.
Trace41ef:6.367,1.017→8.733,−1.350; floating-copper error and redundant warning.
Trace7b1e:37.800,−5.200→37.250,−5.200; redundant warning.
They were not deleted because this assigned scope explicitly preserves manual/protected copper.
Complete residual net-count inventory
Table
Net
Opens
Remaining terminals / connection islands
GND
110
Pours inactive; bottom and top GND islands require the prescribed P1/P2/P3 and stitching.
Existing copper↔L3:W2_IN;TP14:P1↔W5 shared terminal island
EN_HALF
1
U6:INPUTS_B_2→existing copper
EN
1
Existing copper→TP17:P1
EXP_INT
2
J3:Pin_5↔U5:IO22↔R36:P1
I2C_SCL
1
Existing copper→J3:Pin_4
I2C_SDA
2
J3:Pin_3 and R39:P2↔U5:IO6
LATCH_CLR_N
3
C22:P1↔existing copper;TP22:P1↔C22:P1;U3:MR↔another existing copper island
LED_STAT_G
1
U5:IO20→R41:P1
LED_STAT_R
1
U5:IO21→R42:P1
MODE_NET
1
U6:INPUTS_B_1→R56:P2
MODE_SEL
2
U3:D↔U5:IO19↔R35:P1
NTC_ADC
1
U5:IO2→existing copper
PWM_RC1
2
R11:P2↔C14:P1 and R12:P1
Q_EN
3
D6:K::1↔R57:P1;TP11:P1↔U2:Q↔R57:P1
Q_MODE
3
TP12:P1↔R53:P1;U3:Q↔D6:K::2 and R53:P1
Q1_GATE
1
Manual C19 extension island→first-pass copper
Q1_SRC
2
R10:P1↔Q1:S and R72:P1
Q9_D
1
R46:P2→Q9:D
Q13_B
1
Q13:B→R72:P2
RELAY_RST
2
TP3:P1↔U5:IO23↔R38:P1
RELAY_SET
1
R37:P1→U5:IO18
SINK_DIS_12V
1
Existing copper→U6:OUTPUT_B
SINK_FB
3
Local escape island↔R18:P1 and C17:P1;Q12:C↔other copper island
SINK_INT
1
Restored U1/C18/C42 island→R16:P2
SINK_OUT
1
Existing copper→R44:P1
SPARE_IO15
1
TP2:P1→U5:IO15
SRC_DIS_12V
1
Existing copper→D10:2
TP7_NET
1
R68:P2→TP7:P1
UART0_RXD
1
Existing copper→U5:RXD0
UART0_TXD
1
TP15:P1→U5:TXD0
USB_DM
1
U5:IO12→J5:PIN_2
USB_DP
1
U5:IO13→J5:PIN_3
VRAIL_ADC
1
Existing copper→U5:IO5
ZC_DET
1
TP1:P1→R33:P2
No remaining airwire is reported on mains, SW,VBST,DIM+,DIM_P_PROT,SETPOINT,DF_BASE or SRC_FB. This statement concerns connectivity only, not length/clearance compliance.
Specific blockers and next safe work
SINK_INT/R16: constrained cheapest path crosses manual VFB trace0c537a60-250a-438f-9ebf-a1bb8a0f3f56 and R8:P2 on Top, protected first-pass SRC_FB trace9152147c2fc71aea25d0d50b2805588e and R18:P2 on Bottom. Candidate path uses Top U1(15.23,8.83)→(14.18,8.83)→(12.455,10.555)→(11.78,10.555)→(9.005,7.78)→(7.88,7.78), then Bottom west to R16(4.375,10.6). It is a blockage diagnostic, not accepted routing. SRC_FB first-pass rerouting is tool-blocked as protected; do not unlock manual copper or alter frozen rules.
C19:P1: still unroutable DIM_P_F, pad near(18.18,0.8) per router's bottom-terminal mapping. No placement/rule changes authorized beyond already completed C42/C43/C19 moves.
Safety constraint handling: native pair-selector clearance enforcement remains unproven. Earlier retained unsafe via(11.705,−0.995) was atomically removed, and resumed unsafe via(12.380,−1.670) was surgically removed. No known unsafe trial continuation remains.
SETPOINT length: connected but ≤12mm requirement is not established. Frozen terminal separation R13:P1(6.025,8.8) to C15:P1(21.675,7.2) alone is15.732mm, so a whole-net≤12mm interpretation cannot be met without a placement change. Do not claim length compliance.
Pours: P1 Bottom exact stepped polygon, P2 Top center(9.75,4.85),12.5×11.3mm, P3 Top center(33.15,−2),13×13.7mm are retained inactive, with stitching density0. P2 filled area is currently0 because inactive; gross rectangle141.25mm² is not filled copper area. Restore after routing stage, then4 U1 stitches,≥8 underU5 and one adjacent to each remaining Top GND pad; native checks and geometry review required.
Release measurements: SW previously accepted≈6.73mm/6Top0.8mm segments and VBST fiveTop0.2mm segments were untouched, but not newly length-audited here. VIN,SETPOINT,PWM_DIM,DIM+ full chain lengths and filled P2 area remain unverified.5.899mm is only this repaired DIM+ continuation, not the whole J2→F2→D1 chain.
Read-back caveat
Compact scene-tree stores Bottom route X coordinates in a mirrored net-local frame; layout_2d component pad labels can disagree with the routing terminal geometry. All mutations used native terminal identifiers rather than hand-swapping pin labels. The router's actual terminal positions and route-state connectivity were used for these reconnections. This inconsistency should be resolved before final manufacturing acceptance.
Batch versus overall completion
Bounded batch is closed with retained two-local-connection improvement, rejected unsafe continuations,15-node stale-copper cleanup and repaired DIM+ continuity. Overall routing remains incomplete and the board is not ready for release. No bulk autorouter, final pour activation, stitching, manufacturing export or sourcing was performed.