The one authorized auto-route run produced no new copper. Direct cleanup then reduced 56 → 53 airwires, preserving placement, rules, and frozen copper.
The updated routing report records remaining endpoints, individual blockers, DRC findings, and measurements. Zero-airwire completion was not achieved; P2 filled-area verification and final redundant-copper cleanup remain unfinished. The PCB is not fabrication-ready.
Resumed buck trial and verified recovery — 2026-10-05
Final verified state: 69 airwires, 1303 trace segments, 108 physical through-vias, 170 placed components, 87 nets. The initial 69-open inventory below still describes the remaining connections, including SW L2:1 → C9:P2. Class totals remain MAINS0 / SW1 / RAIL12 1 / DIM11 / ANALOG15 / Default41. This bounded batch is stopped; overall routing is incomplete.
Trial outcome
The authorized Top-trace-only clearance of source X48–54/Y24–32 had deleted29 other-net Top segments and added12 clipped outside pieces before the usage interruption (commits #72b9f9d9, #51272826). Resume inspection verified those mutations rather than repeating them:79 opens. The latest user note and9432-character _3-f740…md rules were reread completely. Preflight still found170 components/87 nets, no excluded pins, and only the four intentional shared-pad warnings.
One further SW L2:1→C9:P2 attempt used0.5mm width, Top only, full Bottom blocking to prohibit vias, and explicit Region S/PS1/J4 exclusions. It returned blocked-no-path, zero persisted copper. No identical retry, component move, width reduction, clearance relaxation, full-board autoroute, or pour restoration followed.
The user's illustrative straight path source(51.3,28.0)→(50.8,29.7), Flux(11.3,3.5)→(10.8,5.2), has independently measured conflicts even after Top-trace clearing:
Retained GND via center Flux(11.372531,4.588723), source(51.372531,29.088723), Ø0.6mm. Its copper edge is0.076785mm from the path centerline; a0.5mm trace overlaps the land by approximately0.1732mm before required clearance. Original SmartVia hash 36b6e521f8f7f99c43fb76690c1faea3 on GND.
C9:P1 is VBST, not SW. Its Top pad begins at FluxY5.24, only0.040mm beyond the illustrative endpoint, so a0.5mm trace there overlaps that wrong-net pad. Actual SW destination C9:P2 is source(50.8,30.98), Flux(10.8,6.48) and must be approached without crossing P1.
The original SINK_FB via at Flux(9.705898,6.160616) remains a0.4885mm rounded-pad copper gap from C9:P2 versus1mm required and is inside its forbidden buck pocket. A Top-trace-only rip-up does not relocate this retained via. These are concrete geometric conflicts, not a unique/exhaustive explanation of the solver's no-path result.
Recovery, including history discrepancy
To avoid leaving temporary rip-up opens, the two trial commits were reverted to checkpoint #fc1eb9a4, producing #fa99a4b5. The29 original segments returned and12 clipped pieces were removed, but live readback was 75 opens, not the documented69. Historical inspection of the target also then read75; the cause is unproven. Four remote traces and two SINK_FB vias present in #51272826 were missing after rollback. They were recreated from inspected historical geometry in one six-node batch:
Table
Net/object
Flux coordinates, mm
Geometry
3V3 trace
(38.030349,5.42)→(37.400002,5.42)
Top,0.3mm
3V3 trace
(25.3,−3.993735)→(24.881636,−4.412099)
Top,0.3mm
GND trace
(35.649997,7.55)→(35.649997,8.2)
Top,0.2mm
GND trace
(37.800003,−5.199995)→(37.250003,−5.199995)
Top,0.2mm
SINK_FB via
(9.705898,6.160616)
Original throughHole option, All layers
SINK_FB via
(16.152,12.385)
Original throughHole option, All layers
Full-precision inspected rule values were copied for the traces. These are historical-copper restorations, not new routing approval; in particular the first SINK_FB via's pre-existing clearance/pocket defect is not waived. Its earlier auto-generated UID in this file now denotes the historical object, not the newly recreated node identity. Post-mutation checking reported seven resolved airwire rows and one changed/new representative row; fresh routing-state inspection confirmed a net decrease75→69 and the exact initial remaining-connection inventory. Redundant candidates returned to30 nodes in26 groups; they were not blindly deleted again. Internal feedback submission failed; no ticket was filed.
Final read-only verification and dispositions
Fresh focused checks reviewedAt2026-10-05T18:35:17.519Z report 69 Airwire Errors and11 Keepout Errors, with the same keepout component rows listed below. No matching overlapping-copper, overlapping-trace or via-in-pad findings were returned; this is not certification of the separately measured analog/pocket defects. C2/C3 are Bottom12V/GND capacitors at source(48.8,4.2)/(48.8,6.9), not offending first-pass Top traces/vias; their apparent layer-insensitive keepout diagnostics remain recorded, not silently waived. P1–P3 remain inactive, all component placements and existing widths/clearances are unchanged, and the previous PS1 exclusion/DF_BASE bypass remains intact.
Table
Scoped item
Status
Resume/history/preflight inspection and geometric blocker audit
Completed
Authorized local Top-trace-clearing trial
Completed trial, then reverted because SW failed
SW L2:1→C9:P2 at0.5mm Top/no-via
Failed: blocked-no-path; original U4→L2 stub preserved
Restore temporary rip-up and rollback-induced opens
Completed:69-open baseline recovered and checked
New BST route; reroute displaced nets around a successful SW path
Next safe proposal remains route-only local rework including the retained GND/SINK_FB via approaches, with all component datums and rules fixed, followed by a new Top SW candidate around the actual C9 pad field. That broader via rework was not authorized by the Top-trace-only trial, and no complete collision-free≤10mm SW solution has been demonstrated. Do not infer a required component move from the solver failure. This resumed trial/recovery used two pre-interruption copper mutations, one failed SW attempt, one rollback, and one six-node recovery mutation; no successful new cleanup route is claimed.
Read-only stop clarification — 2026-10-05
Completed: renewed geometry/rule inspection, PS1 exclusion audit, and enumeration of all11 keepout findings below. Not established: a unique/exhaustive cause of the SW router failure or a guaranteed minimum complete reroute. Unattempted: all PCB/routing changes in this clarification; this file update is the only mutation. No evidence justifies a component move or rule relaxation.
SW stop: measured conflicts, not a claimed solver diagnosis
The stopped connection is SW L2:1 → C9:P2, source(51.2,26.3) → (50.8,30.98), Flux(11.2,1.8) → (10.8,6.48). The prior0.5mm Top-only/no-via request returned blocked-no-path without an obstructing-node list. Therefore the solver's exact cause remains not fully diagnosed; do not translate its failure into “a part must move” or “clearance must be relaxed.” The following are independently verified geometric conflicts:
C9:P2 is a rounded Top SW pad, world bounds Flux X10.49–11.11/Y6.20–6.76mm, corner radius0.046mm. The SINK_FB through-via at Flux(9.705898,6.160616), Ø0.6mm, has 0.4885mm actual rounded-pad copper gap, not the required1mm. The earlier≈0.485mm value used the conservative rectangular bounding box. This via is also inside the user-forbidden buck pocket for SINK_FB: Flux X4–12/Y−0.5–6.5 (source X44–52/Y24–31).
Exact via parent UID: autoRouted.auto-layout-ab8e60ae-ee75-4e04-9c5e-b85315fb9709.e9087467-fdf9-4ab1-b652-1a2eeba7bbad.SmartVia.272d5127b9efc313ea3f00de6710464b; physical via adds .throughHole.0-0.
Four nearby Top0.15mm SINK_FB segments also violate the1mm pad clearance. Trace hashes use the lossless T(hash) convention below with the SINK_FB net UID:
Table
Trace identifier
Flux endpoints, mm
Minimum copper gap to C9:P2
T(bb6d93463794d0a424f4d363a86ffd49)
(9.705898,7.079886) → (9.705898,6.160616)
0.7091mm
T(3ff3cabeed7da5355dced3c9560260ee)
(10.680254,8.054242) → (9.705898,7.079886)
0.7247mm
T(48ac95b5b9ddae5e979d485463dbd4f8)
(13.416339,7.024999) → (11.709497,7.024999)
0.5955mm
T(9f961d7e6c800dd30c09a6259b702814)
(11.709497,7.024999) → (10.680254,8.054242)
0.5553mm
The1mm pair clearance is saved in rule 24fde684-831b-4b75-8038-c32dbb939227, including SINK_FB against SW. Persistence of its net-specific selector still does not establish router enforcement. SW rule 69167b80-03e0-4e35-989b-85fecc413737 saves0.5mm minimum/0.8mm preferred and Top; no-via and≤10mm total remain explicit acceptance requirements. Default0.2mm copper separation is declared by 1b1fe420-c52d-4a9c-984d-36d9d2623272.
Another measured local bottleneck is the Top corridor beside C9:P1: VBST0.15mm vertical at X10.8/Y5.009–5.52 and GND0.2mm vertical at X11.514/Y4.73–6.084 leave only 0.539mm trace-edge space. C9:P1's actual VBST pad extends toX11.11 (world Y5.24–5.80), reducing the gap further to 0.304mm at its straight right edge. A0.5mm SW trace with0.2mm each-side clearance needs0.900mm, so the trace-only bottleneck is short by0.361mm and the pad-field bottleneck is short by0.596mm. The GND Ø0.6 via at(11.373,4.589) and its adjacent doglegs further constrain the lower approach. This rules out that local straight corridor as-is, not every possible Top path.
Dimensioned route-only alternative and its limits
The least-scope change supported by the observations is local SINK_FB copper rework, not component placement or relaxed rules: relocate the named via and reroute the four named Top segments plus their connected approaches, preserving connectivity. Via centers must stay at least1.300mm from the SW pad copper outline;0.15mm trace centerlines at least1.075mm. Conservative side limits from the pad bounding box are via X≤9.190 or X≥12.410, or Y≤4.900 or Y≥8.060; trace centers X≤9.415 or X≥12.185, or Y≤5.125 or Y≥7.835. These are local envelope boundaries, not collision-free waypoints; the forbidden buck pocket also excludes SINK_FB copper on both layers. Merely moving the via left would encounter other circuitry and is not a verified solution.
If choosing the direct corridor beside C9:P1, holding its pad fixed gives a geometric lower bound of GND vertical center X≥12.110 instead of11.514, a≥0.596mm shift, to open0.900mm between the VBST pad and the GND trace. Considering only the narrower VBST trace would giveX≥11.875, but that is insufficient at the pad. The adjacent via/branches would also need rework, and nearby C11 and other copper require a new collision audit; shifting only that segment is not a complete proposed route. Alternatively, a different Top approach may avoid this corridor. No complete route-only alternative or minimum full edit set has been proven, and any candidate must still satisfy all neighboring copper, buck-pocket restrictions and SW≤10mm total. Consequently no exact required part move or rule relaxation can responsibly be specified from this stop.
Exact11 keepout findings
Fresh get_checks(design_rule_check_keepout) reviewedAt 2026-10-05T14:43:57.139Z returned the following11 Errors. The API exposes component UIDs, not unique per-finding IDs or the responsible zone IDs; repeated rows must not be presented as independently identified zone intersections.
Table
Finding #
Reported component
Reported UID
1
C3
009bec86-d5af-4c19-857e-bee0d8fcb1e9
2
C1
08fa5884-3a41-41ae-9ba9-0dd11a5bc0db
3
C1
08fa5884-3a41-41ae-9ba9-0dd11a5bc0db
4
C1
08fa5884-3a41-41ae-9ba9-0dd11a5bc0db
5
C2
0b4b5c5a-b68e-4206-83aa-5102837125a0
6
RV1
1e3d7249-fdd4-42b3-9e28-2de99a345320
7
RV1
1e3d7249-fdd4-42b3-9e28-2de99a345320
8
PS1
218e2a1f-6253-468a-bb8b-a2993f58b86d
9
CY1
81195895-1c8a-4f70-b390-eb5521a91bfc
10
Isolation Slot 2x38.5 (stale label)
a3675463-d974-486b-a473-c6c4266657fc
11
Isolation Slot 2x38.5 (stale label)
a3675463-d974-486b-a473-c6c4266657fc
Latest authority and PS1 clearance confirmation
The exact latest file ending _3-f740bae3-3edf-4ef4-876e-a63ce0306bb6.md was read completely before the cleanup PCB edits and read completely again during this clarification (9432/9432 characters). No new interpretation supersedes it.
Renewed width-aware spatial SVG inspection around C3 confirms the Top rectangle source X45–48/Y5–9.7, Flux X5–8/Y−19.5–−14.8, remains clear of Top trace/pad copper and every through-via land, with the DF_BASE bypass and12V northeast bypass unchanged. The nearest displayed via is12V at(10.275,−16.134), radius0.3mm, giving1.975mm gap to the rectangle. DF_BASE retains≈0.221mm edge gap and12V retains≈0.415mm corner gap. Bottom GND copper and Bottom C2/C3 pads within the rectangle are allowed by this Top-only exclusion; “clear” does not mean no Bottom copper. Fresh zone/polygon readback confirms Top connectedLayers, all specified copper/part exclusions, P1–P3 inactive and no active generated fill. Saved-zone router enforcement is still not certified by this physical-clearance check.
Initial inventory — before any cleanup routing
Live routing_state: 69 open connections. Before any PCB mutation, the subsequently supplied C5.2c rules were read in full. They replace the earlier rules file and include the explicit top keepout X45–48/Y5–9.7. Counts by saved class: MAINS0; SW1; RAIL12 1; DIM11; ANALOG15; Default41 (including GND2). All seven MAINS nets have no listed open connection; this is connectivity evidence, not a full topology/clearance acceptance result.
Endpoint notation below is lossless: T(hash) means the existing trace UID autoRouted.auto-layout-ab8e60ae-ee75-4e04-9c5e-b85315fb9709.<net-UID>.Trace.<hash>; V(hash) means the same prefix plus <net-UID>.SmartVia.<hash>.throughHole.0-0. Net UID dictionary is below. Plain component endpoints are quoted exactly from live routing state. Arrows identify open connections, not electrical direction.
Initial routing-state also lists30 redundant trace nodes in26 groups; these have not yet been deleted. Inventory persisted before cleanup routes. Final bounded outcome will be appended after verification.
Bounded pass outcome — 2026-10-05
C5.2c exclusion and its affected DF_BASE reroute completed. SW cleanup failed with no path; remaining initial opens were not attempted after that stop. Final airwires69, unchanged by class: MAINS0 / SW1 / RAIL12 1 / DIM11 / ANALOG15 / Default41. No full autoroute, component move, width/clearance relaxation, sourcing or cosmetic change. MAINS required no completion route because no MAINS airwire was present; its first-pass geometry remains unchanged, not newly certified.
Exact exclusion and intersection audit
Added zone f369307f-b70f-410e-b4a6-6e7cf1f9e171, PS1 underside Top exclusion C5.2c, Flux center(6.5,−17.15), size3×4.7 mm, Top with connectedLayers Top. This is source X45–48/Y5–9.7 exactly. Both keepOut/minKeepOut are 0mm element(0mm) pad(0mm) via(0mm) routeSegment(0mm) polygon(0mm) fill(0mm); no Bottom exclusion and no unrelated rule edit.
The physical SVG spatial read around C3 covers Flux X1.75–15.85/Y−24.65–−10.55, comfortably enclosing the exclusion. It spatially selects intersecting routing from the first-pass board and includes actual trace widths and via diameters; no centerline-only assumption. The initial full route-node read counted1513 including both108 SmartVia parents and their108 derived vias, corresponding to1297 traces+108 physical vias=1405 first-pass routed nodes. The spatial read found exactly two Top DF_BASE segments crossing the new rectangle, both0.15 mm wide:
No via intersects the rectangle. GND through the rectangle is Bottom. Existing0.5 mm Top12V route goes around its northeast corner: centerline(7.2,−13.059)→(10.275,−16.134), giving approximately0.415 mm copper-edge gap to the rectangle corner after subtracting0.25 mm half-width. Thus PS112V/GND did not need replacement for this delta. No other Top component footprint was found in the rectangle; C2/C3 there are Bottom and were preserved.
Persisted copper change and safety verification
The tool rejected atomic removal of the two auto-generated traces as “protected,” although scene readback said locked=false. Supported surgical deletion removed only those two segments, then connection of the verified net terminals R63:P2, Q2:B, Q3:D restored DF_BASE connectivity using existing copper islands. All other first-pass routes were retained.
The first proposed replacement cleared the new PS1 rectangle but crossed the existing lower isolation wall; read-only geometry caught this. It was replaced immediately, not accepted as safe. This demonstrates that the ordinary persisted wall zones are not sufficient evidence of enforcement by the targeted router. The second successful call passed the full SELV-forbidden region explicitly as keepouts on both layers, in addition to PS1 Top and the prohibited buck/J4 regions. No isolation rule was relaxed.
Final replacement is eight Top segments, all0.15 mm, no new vias, with Flux vertices:
(5.4544,−4.34) → (5.4544,−14.015) → (4.7044,−14.765) → (4.7044,−19.565) → (5.9044,−20.765) → (8.2294,−20.765) → (8.9794,−21.515) → (8.9794,−22.2379) → (9.0069,−22.2654).
Readback verifies approximately0.221 mm minimum copper gap to the new rectangle's left edge. The route crosses the lower bridge boundary only at X>8.2 Flux (source>48.2), safely to the SELV side; while X<6.5 Flux, its copper stays above Y−20.840, giving≥0.160 mm to the start of the existing bridge exclusion atY−21. Replacement routed length returned21.3802 mm. This is the changed DF_BASE portion, not a requested final critical-net-length deliverable.
For subsequent targeted SELV calls, explicitly supply Region S, rather than trusting the wall-zone declaration: identical Top and Bottom keepout path in Flux mm: -40,-24.5 6.5,-24.5 6.5,-21 1.5,-21 1.5,21.5 6.5,21.5 6.5,24.5 -40,24.5. Also supply the PS1 Top rectangle and per-net buck/J4 restrictions. Existing first-pass copper still needs a separate regional compliance audit; this pass checked the new exclusion and replacement, not every pre-existing safety/topology requirement.
Failed cleanup connection and next safe change
Attempted SW L2:1→C9:P2,0.5 mm, Top-only with Bottom fully blocked to enforce no vias. Result: blocked-no-path, search exhausted all reachable cells; no copper added, no rule relaxed. Current endpoint source coordinates: L2:1(51.2,26.3), C9:P2(50.8,30.98), from live layout rather than the older illustrative route coordinates.
A concrete nearby obstruction/constraint conflict is existing SINK_FB copper: its Ø0.6 via at Flux(9.706,6.161), source(49.706,30.661), is only approximately0.485 mm copper-edge from C9:P2's SW pad (required ANALOG↔SW≥1.0 mm). Top SINK_FB segments atX9.706/Y6.161–7.080 and(11.710,7.025)→(13.416,7.025) also encroach on the1 mm SW-pad separation envelope. The tool did not identify a unique blocking node; this geometric conflict is independently observed, not a claimed exhaustive no-path diagnosis.
Proposed next bounded change, not applied: reroute that SINK_FB via/adjacent Top branches outside C9:P2's1 mm copper-clearance envelope, preserving SINK_FB connectivity and leaving C9/L2/U4 fixed, then retry the0.5 mm Top-only SW stub. Do not reduce SW width, use Bottom SW/vias, or lower the1 mm analog separation. No exact component move or relaxed rule is justified by the available evidence, so none was invented.
Redundant-copper regression — fully rolled back
Fresh DRC recommended30 redundant nodes in26 groups. The required pre-route cleanup batch unexpectedly increased airwires69→70 by opening DIM+. It was atomically reverted to #bb31015b, undoing only deletion commit #a4ba04ac; the new keepout and inventory remained. All30 original candidate nodes are restored. Do not blindly repeat that deletion: the “safe to remove without disconnecting pads” diagnostic disagrees with routing-state connectivity. A feedback submission was attempted but failed; no ticket was filed.
Final checks and scope disposition
Fresh checks at2026-10-05T14:39:14.967Z: 69 Airwire Errors;11 Keepout Errors;26 redundant-trace Warnings (30 nodes). No matching overlapping-copper, overlapping-trace, invalid-layer, via-in-pad or protected-intrusion finding was returned by the focused query. Tool absence is not certification of the manual regional/analog-clearance findings above.
The11 keepout findings comprise the previous nine user-waived C1×3/RV1×2/PS1×1/CY1×1/slot×2 plus new C2/C3 findings. Live readback confirms both are Bottom whereas the new zone is Top-only: these appear layer-insensitive component/courtyard diagnostics, not authorization to move the Bottom MLCCs. They are recorded, not silently waived. Preflight after adding the zone retained only the four intentional shared-pad Warnings, with zero excluded or ignored-keepout pins.
Table
Assigned item
Disposition
Inventory69 opens before any cleanup routing; class totals
Completed
MAINS-first condition
Completed check:0 MAINS opens; no unnecessary MAINS reroute
C5.2c exact Top keepout
Completed and read back
Width-aware affected-copper audit and reroute
Completed: two DF_BASE segments replaced; PS1 power routes already clear
SW L2:1→C9:P2 cleanup
Failed, blocked-no-path; copper preserved
Remaining initial opens
Unattempted after SW stop;69 total remain
Placement/fixed geometry/rules preserved
Completed, except addition of requested exclusion
Ground pours/stitching/final lengths/P2 area
Unattempted intentionally; zero-airwire condition not met
Mutation accounting: two successful mutate_layout_routes calls (DF_BASE replacement, then its isolation correction); one failed atomic auto-trace reroute and one failed SW connect. One successful two-trace surgical deletion supports the replacement. The separate30-node redundant deletion was reverted; counting that deletion and its rollback too gives five successful copper-affecting operations, still below ten. No further targeted route was attempted. Final P1/P2/P3 readback remains active=false; no post-route ground work is claimed.
Resumed buck trial and verified recovery — 2026-10-05
Trial outcome
Recovery, including history discrepancy
Final read-only verification and dispositions
Read-only stop clarification — 2026-10-05
SW stop: measured conflicts, not a claimed solver diagnosis