The one authorized auto-route run produced no new copper. Direct cleanup then reduced 56 → 53 airwires, preserving placement, rules, and frozen copper.
The updated routing report records remaining endpoints, individual blockers, DRC findings, and measurements. Zero-airwire completion was not achieved; P2 filled-area verification and final redundant-copper cleanup remain unfinished. The PCB is not fabrication-ready.
Final routing checkpoint #c2fae06c, 2026-10-06. This child was assigned bounded R16/C19 cleanup, at most10 successful targeted mutations, no whole-board autorouter. Eight PCB mutations persisted: three rule changes, one trace-deletion batch, three atomic SRC_FB reroutes, and one DIM_P_F connection. Blocked attempts made no changes. No sourcing, schematic edits, component moves, or changes to mains/SW/VBST, board geometry, holes, slot or stackup.
The latest authority2 and rules MD were read completely:
Previous saved layout was #57d37e2f,180 airwires. The prior file
Assigned items
Table
Item
Status
Saved evidence
Recover saved operations/rules
Completed
History showed no layout changes after #57d37e2f, only prior report creation/update.
Delete ANALOG separation ruleset
Completed
#3e7e5ccd deleted UID24fde684-831b-4b75-8038-c32dbb939227. No replacement pair rule created.
Delete manual GND leftovers
Completed
#c5ee7452 deleted22cb,41ef,7b1e. Fresh GND scene-tree has zero traces/vias and only inactive P1/P2/P3.
Clear first-pass protection artefacts
Completed for two named blockers
#54c26f3c cleared SRC_FB trace9152147…;#2366bbd4 cleared SRC_FB trace1d8d1d7…. Subsequent atomic reroutes successfully removed both. No blanket unprotect or changes to protected mains/SW/VBST.
R16 SRC_FB obstruction
Completed removal/reroute; final connection failed
#756122b7 replaced the9152147… first-pass segment by6.045mm Bottom detour, no vias; SRC_FB stayed connected. R16 retry still blocked by different copper/pad.
C19 pin access anomaly
Completed
After pair-rule deletion, preflight no longer reports C19:P1 unroutable.
C19:P1→R15:P1
Completed
#8d15c255 initially replaced1d8d1d7… with4.811mm detour, but it still obstructed a nearby candidate. #758fdc6a replaced all five newly generated detour segments with5.514mm Bottom detour outside the C19 corridor. #c2fae06c then routed C19:P1→R15:P1,10.822mm,Bottom0.5mm,no vias.
Remaining DIM_P_F branches
Failed in bounded attempt
Whole-net seven-island attempt connected0/6 pairs. Five opens remain after the successful C19/R15 branch. No width reduction or moves performed.
Scoped verification/report
Completed
Fresh native checks and geometry reads below.
Whole-board non-GND autoroute
Unattempted by child assignment
Return to lead; preflight has only intentional shared-pad warnings, but configuration must preserve frozen copper and exclude GND.
Remain lead's subsequent routing/finalization phase, not a reason to claim board complete.
Read-only verification
Airwires:179, confirmed by routing_state and fresh native airwire review at 2026-10-06T12:33:16.334Z. 110 GND +69 other. Improvement from180 is one connection.
Scoped copper DRC at12:30:44.625Z:zero errors,two redundant-trace warning groups (14 nodes). Floating copper, overlapping copper/traces, via-in-pad, protected intrusions, under-connected vias,dangling traces and invalid-layer query returned no findings. This is scoped verification, not a full DRC or Gerber-based target-spacing certification.
Preflight:four warnings,zero blocking pin anomalies. These are intentional shared same-net J1/W2/W3 and J2/W4/W5 pads. The C19 pin anomaly is resolved.
Fresh GND scene-tree contains only three polygons, all inactive,fillStitchingDensity0. No GND traces or vias remain; P1/P2/P3 shapes and placement unchanged.
Fresh DIM_P_F/SRC_FB scene-tree confirms both retained detours and the new C19 branch are Bottom,no new vias. Their physical document X coordinates are positive; Bottom inline rule X values are mirrored net-local values.
All mutations targeted only the named pair ruleset,GND leftovers,SRC_FB and DIM_P_F; frozen mains/SW/VBST and accepted SINK_INT local escape were untouched.
Newly reported redundant warnings: do not blindly rip up accepted escape
Trace04bb group contains11 nodes of the previously accepted local SINK_INT escape:04bba2c3,0e441e01,2ba98b6d,2dd69337,48daa72e,4cfbe72b(via),75a97a6b,88302197,8947cdd7,8a6dbf0e,f471b58a (full UIDs available from native checks). These were retained because the latest authority explicitly accepts the local SINK_INT escape, and routing_state still identifies its8947 island as the source of the R16 open. Reconcile this warning with connectivity before deleting.
Trace4124 group contains old SINK_INT stubs41240c83-bf31-4273-b9dc-c771a4cc9268,4641ff63-905a-4e05-bd9c-6fb5147473ed,671eaa4e-28e2-4bf0-890a-ea3d5dcb0d2a. They are not the three GND stubs requested for deletion. Retained for precise lead review.
Coordinates and retained route geometry
Coordinates below are Flux mm; project=Flux+(40,24.5).
C19 DIM branch: (18.18,0.8)→(18.18,1.55)→(17.93,1.8)→(14.18,1.8)→(13.93,2.05)→(13.93,5.3)→(15.43,6.8)→(15.43,6.895)→R15:P1(15.325,7).0.5mm,Bottom,10.822mm. Entire branch remains in SELV envelope; no new via/J4 courtyard/U5 intrusion.
Final C19-corridor SRC_FB detour:(15.4096,0.5011)→(13.6846,0.5011)→(13.0096,1.1761)→(13.0096,2.9011)→(12.225,3.6857),0.15mm,Bottom,5.514mm. Selected0.2mm DRC is clean;1mm trace separation remains a target for final audit, not a claim made here.
R16 still open: SINK_INT accepted U1/C18/C42 island→R16:P2(4.375,10.6). After the first SRC_FB removal, constrained routing's latest cheapest path crosses:
SETPOINT first-pass Top trace autoRouted.auto-layout-ab8e60ae-ee75-4e04-9c5e-b85315fb9709.d36fee70-9e1b-406e-8909-064231130dc7.Trace.edf340e1213f171fe98222f698ee91f5;
R45:P2/Q1_GATE on Bottom;
new SRC_FB Bottom trace d71cbf87-334c-4270-a346-9f0df1f8887c.
Diagnostic candidate:Top(15.23,8.83)→(14.18,8.83)→(11.63,11.38)→(8.855,11.38)→(8.255,10.78)→(8.18,10.78), then Bottom via(8.105,10.855),(8.105,11.23),(8.03,11.305),(5.03,11.305) to R16. Not routed or accepted. SETPOINT first-pass copper may now be unprotected/rerouted under explicit authority; pad R45 may require routing around, not a move.
DIM_P_F five remaining opens, exact final island inventory:
new branch trace1486560d-6638-4550-b829-ce358502947f→R63:P1;
new branch tracec4a9664d-058f-467e-a285-ccb71ed485c8→Q1:D;
R46:P1→R15:P1;
R46:P1→R45:P1.
Specific diagnostics from the failed whole-net attempt: C19→Q1 crosses R54:P2/MODE_NET and own-pad via-access constraints nearQ1:D(22.35,3.1); R15→R46 crosses R22:P1 and SRC_FB copper plus Top buck exclusion; R46→R45 crosses C7:P2 and via access at its own pads. Q1→eastern DIM island crosses SETPOINT, Q1:S,D11 pad field and12V Bottom routing. Removing the pair rule fixed preflight access but does not guarantee0.5mm routes through the remaining physical congestion.
Residual inventory delta versus prior file
The prior complete net inventory still applies except DIM_P_F6→5. Every other non-GND net count is unchanged; GND count remains110 though endpoint topology changed after manual-stub deletion. Remaining non-GND69 include SINK_INT1,SINK_FB3,PWM_RC1 2,DIM_P_F5,DIM_N_F2,DIM_SENSE2,DIM−2,ADC and module/control opens listed in the prior file. Mains,SW,VBST,DIM+,DIM_P_PROT,SETPOINT,DF_BASE and SRC_FB have no reported airwires.
Bulk routing handoff / readiness
Native preflight is ready with acknowledged intentional shared-pad warnings. No first-pass-protection technical blocker remains for the two inspected SRC_FB segments; explicit protection mutation worked even though rule-config support labels list only net/polygon.
Lead must still ensure the whole-board job excludes GND and preserves accepted mains/SW/VBST. The loaded run_auto_route API has start/resume/stop/cancel only, with no per-net exclusion field; this child did not launch it or alter net activity to emulate exclusion. Also reconcile the two redundant SINK_INT groups above before bulk routing so accepted escape is not blindly deleted. The parent may continue additional local cleanup or launch an appropriately configured bulk job; no request for new user approval is needed inside latest authority.
Pours remain inactive for traces-first routing. Following non-GND routing, activate the exact P1/P2/P3, perform4 U1 stitches,≥8 underU5 and one beside remaining Top GND pads, set specified solid/thermal connections, then run full DRC and report requested lengths/filled P2 area. No final-length compliance is asserted in this bounded handoff.
Batch is complete; overall board remains incomplete and not ready for manufacturing.
Scope and checkpoint
Assigned items
Read-only verification
Newly reported redundant warnings: do not blindly rip up accepted escape