3.3V 레귤레이터 추가 안내
Can I export my schematic as a PDF?No, you cannot export a PDF of your schematic from Flux right now.
Table
| Score | Meaning |
|---|---|
| 0 | Unacceptable / fails requirement |
| 1 | Very weak |
| 2 | Weak / high risk |
| 3 | Acceptable |
| 4 | Strong |
| 5 | Excellent / best fit |
Table
| Candidate | ADC fit | Timer/PWM fit | Interrupt latency fit | Safety I/O fit | Required comms fit | Debug/programming fit | Package feasible | Package assembly acceptable | Lifecycle acceptable | Lead time acceptable | Status |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Candidate 1 | Pass/Fail | Pass/Fail | Pass/Fail | Pass/Fail | Pass/Fail | Pass/Fail | Pass/Fail | Pass/Fail | Pass/Fail | Pass/Fail | Proceed / Stop |
| Candidate 2 | Pass/Fail | Pass/Fail | Pass/Fail | Pass/Fail | Pass/Fail | Pass/Fail | Pass/Fail | Pass/Fail | Pass/Fail | Pass/Fail | Proceed / Stop |
| Candidate 3 | Pass/Fail | Pass/Fail | Pass/Fail | Pass/Fail | Pass/Fail | Pass/Fail | Pass/Fail | Pass/Fail | Pass/Fail | Pass/Fail | Proceed / Stop |
Table
| Category | Weight | What to Score |
|---|---|---|
| Real-time determinism | 10 | Timer quality, interrupt handling, predictable control behavior |
| ADC and analog fit | 10 | Channel count, performance, sampling flexibility, analog integration |
| Safety and fault handling fit | 10 | GPIO ownership, comparator/watchdog/reset support, fault isolation suitability |
| CP/PP and measurement timing support | 8 | PWM/ADC synchronization, capture/compare usefulness |
| Communications fit | 7 | UART/CAN/SPI/I2C support and flexibility |
| Firmware platform/toolchain fit | 7 | SDK quality, debugger support, team familiarity |
| Memory margin | 6 | Flash/RAM headroom for present and future firmware |
| Package and PCB risk | 5 | Pin count headroom, routing feasibility, PCB manufacturability |
| Package assembly risk | 4 | Assembly process fit, pitch/package handling risk, special process burden |
| Power and clocking fit | 5 | Clock options, reset behavior, brownout robustness |
| Availability/lifecycle risk | 6 | Supply continuity, lifecycle status, sourcing resilience |
| Lead time fit | 4 | Current lead time position versus project schedule and sourcing flexibility |
| Cost fit | 5 | Relative production cost at project volume |
| Growth headroom | 8 | Margin for future protection, diagnostics, and protocol growth |
Table
| Candidate | RT Determinism (10) | ADC/Analog (10) | Safety/Fault (10) | CP/PP Timing (8) | Comms (7) | Toolchain (7) | Memory (6) | Package (5) | Assembly Risk (4) | Power/Clock (5) | Availability (6) | Lead Time (4) | Cost (5) | Growth (8) | Total |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Candidate 1 | |||||||||||||||
| Candidate 2 | |||||||||||||||
| Candidate 3 |
Table
| Candidate | Strengths | Weaknesses | Major Risks | Cost / Lead Time Position | Package Assembly Risk Notes | Open Questions | Recommendation |
|---|---|---|---|---|---|---|---|
| Candidate 1 | |||||||
| Candidate 2 | |||||||
| Candidate 3 |
Table
| Candidate | Board-to-board comms fit | Ethernet/network fit | External interface fit | Storage/update fit | Debug/service fit | Package feasible | Package assembly acceptable | Lifecycle acceptable | Lead time acceptable | Status |
|---|---|---|---|---|---|---|---|---|---|---|
| Candidate 1 | Pass/Fail | Pass/Fail | Pass/Fail | Pass/Fail | Pass/Fail | Pass/Fail | Pass/Fail | Pass/Fail | Pass/Fail | Proceed / Stop |
| Candidate 2 | Pass/Fail | Pass/Fail | Pass/Fail | Pass/Fail | Pass/Fail | Pass/Fail | Pass/Fail | Pass/Fail | Pass/Fail | Proceed / Stop |
| Candidate 3 | Pass/Fail | Pass/Fail | Pass/Fail | Pass/Fail | Pass/Fail | Pass/Fail | Pass/Fail | Pass/Fail | Pass/Fail | Proceed / Stop |
Table
| Category | Weight | What to Score |
|---|---|---|
| Communications/network fit | 10 | Ethernet, UART, CAN, RS-485, service/debug fit |
| Software platform fit | 10 | OS/firmware support, tools, maintainability |
| Memory and storage headroom | 9 | Flash/RAM/external storage support |
| Board-to-board integration fit | 8 | Clean interface to real-time board |
| Security/update support | 8 | Boot/update features, integrity support |
| Logging/data handling fit | 6 | Local logs, buffering, file/storage support |
| Package and PCB risk | 5 | Escape/routing risk, pin headroom |
| Package assembly risk | 4 | Assembly process fit, package handling risk, special process burden |
| Availability/lifecycle risk | 6 | Sourcing, longevity, product continuity |
| Lead time fit | 4 | Current lead time position versus schedule and sourcing flexibility |
| Cost fit | 5 | Relative unit cost and BOM impact |
| Growth headroom | 8 | Future protocol and service expansion |
| Debug/serviceability | 6 | Bring-up and field diagnostics fit |
| Power management fit | 6 | Rail compatibility, startup/reset behavior |
Table
| Candidate | Comms/Network (10) | Software Platform (10) | Memory/Storage (9) | B2B Fit (8) | Security/Update (8) | Logging (6) | Package (5) | Assembly Risk (4) | Availability (6) | Lead Time (4) | Cost (5) | Growth (8) | Debug (6) | Power Mgmt (6) | Total |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Candidate 1 | |||||||||||||||
| Candidate 2 | |||||||||||||||
| Candidate 3 |
Table
| Candidate | Strengths | Weaknesses | Major Risks | Cost / Lead Time Position | Package Assembly Risk Notes | Open Questions | Recommendation |
|---|---|---|---|---|---|---|---|
| Candidate 1 | |||||||
| Candidate 2 | |||||||
| Candidate 3 |
Table
| Item | Real-Time Board | Upper Board |
|---|---|---|
| Selected candidate | ||
| Runner-up candidate | ||
| Reason for selection | ||
| Key risk remaining | ||
| Mitigation before freeze | ||
| Freeze ready | Yes / No | Yes / No |
Table
| Gate Item | Real-Time Board | Upper Board | Notes |
|---|---|---|---|
| Candidate passes all hard-gate checks | Yes / No | Yes / No | |
| Package and pin-count margin confirmed | Yes / No | Yes / No | |
| Package assembly risk acceptable | Yes / No | Yes / No | |
| Toolchain and debug workflow confirmed | Yes / No | Yes / No | |
| Supply chain and lifecycle reviewed | Yes / No | Yes / No | |
| Lead time acceptable for project schedule | Yes / No | Yes / No | |
| Cost position acceptable for target volume | Yes / No | Yes / No | |
| Firmware growth margin acceptable | Yes / No | Yes / No | |
| Board-to-board interface fit confirmed | Yes / No | Yes / No | |
| No blocking open questions remain | Yes / No | Yes / No |
Purpose
How to Use This Sheet
Scoring Scale
Section A: Real-Time Control Board Down-Selection
A1. Hard-Gate Checks
A2. Weighted Scoring Criteria
A3. Real-Time Board Candidate Scoring Table
A4. Real-Time Board Evidence / Notes
Section B: Upper Control Board Down-Selection
B1. Hard-Gate Checks
B2. Weighted Scoring Criteria
B3. Upper Board Candidate Scoring Table
B4. Upper Board Evidence / Notes
Section C: Cross-Board Decision Summary
Section D: Final Down-Selection Gate
Section E: Project-Specific Open Questions
Exit Criteria