Variable Frequency Drive PCB


Can you help me write a weekly report for this project with an abstract, images of the project, all the important things of the project, and a conclusion

flux

I’ll draft a weekly report with an abstract, project figures, progress, remaining issues and a conclusion. I’ll clearly separate the final 1 hp goal from the current low-voltage prototype and avoid claiming hardware tests that have not happened.
"VFD Capstone Progress Report" completed.

flux

I created your seven-page weekly report with two actual PCB images. The full schematic image was too zoomed out to read, so I used a board overview and an enlarged MCU-routing view instead.
Download your report
The report includes:
  • Abstract and project objectives
  • Specifications and system architecture
  • Captioned project images
  • PCB routing progress and branch-current analysis
  • Firmware results and component-rating concerns
  • Remaining challenges, next steps and conclusion
  • References to supporting project records
I saved a reading version in your project files: Weekly Progress Report.
Before submitting, fill in your name, course, instructor and reporting dates. The report distinguishes recent progress from cumulative work and clearly states that hardware testing and the final 230 V, 1 hp capability have not yet been demonstrated. Word pagination may vary; the PDF is the checked edition.

V-Phase Routing Checkpoint
Result — partial, stopped at required checkpoint
Live-board routing work on 2026-09-21 reduced reported board airwires 342 → 340. The V channel is not complete or ready for energization. Stopped after two genuine U6-ground/C45 routing attempts were rejected for overlapping copper; neither rejected attempt persisted copper. No components were moved, no rules were changed, and no existing copper was deleted or disabled.
Assigned-scope status

Table


ItemStatusEvidence / remaining issue
Routing-specific preflight and RS2/U6/TP15/custom-pad mapping inspectionCompletedPreflight before mutations and again afterward; native schematic, layout, rules and net inspections recorded below.
RS2 terminal-origin IN+ and IN− Kelvin pairUnattempted, blockedU6 is remote from RS2; its locked PGND escape merges IN− with GND pin 2. No remote-trunk sensing route was substituted.
Short/close pair away from switching/gate loopsUnattempted, blockedCannot claim with absent pair and present placement. U6 center (21,26), RS2 center (60,60) mm; center separation about 51.7 mm.
U6 +5 V connectionCompleted inspection; pre-existing connection retainedU6:V+ and C45:P1 already share routed +5 V copper; no additional +5 V routing was applied. This does not establish adequate local bypassing.
Local bypass and U6 groundsFailed / checkpointTwo rejected attempts described below. C45 remains remote at (33,21) Bottom; U6 ground islands remain open.
U6 REF1/REF2 to VREF_1V65 source networkCompletedAdded route joining existing U6 reference island to R37:P2/source island; VREF_1V65 has no remaining reported airwire.
U6 output to R35:P1 series resistorCompleted inspection; pre-existing connection retainedISENSE_V_RAW has no reported airwire; native geometry shows U6 output via and Bottom route to R35.
C47 filter returnCompletedAdded C47:P2 connection to existing PGND/reference-ground island.
ISENSE_V fanout including TP15, comparator and MCUUnattempted this batch, incompleteTwo ISENSE_V airwires remain; stopped before attempting output fanout after the ground retry limit.
Preservation of protected/unrelated placement and copperCompletedFull native layout diff from baseline 0a14af78 to final state shows additions only on VREF_1V65 and PGND; no placement changes or existing-copper edits.
Zero direct V opens / full-channel verificationFailedEight airwire representatives touching the direct V scope remain, listed below.
Every newly completed connection
  1. U6 REF1/REF2 island → R37:P2 / VREF_1V65 source island. Both U6 REF pins were already locally joined. First search at 0.20 mm, 30 s timed out with no change; retry at 0.20 mm, 120 s succeeded. Router reported 46.8718 mm with five vias across six layer segments. Start was the existing U6 reference custom escape corner at (26.8,26.773) mm. Commit 7b02f2ab. This is electrical continuity, not a claim that the long reference route is optimal.
  2. C47:P2 → PGND island containing R38:P2. Router connected to existing trace 91af3914-4e72-4e0c-a02e-dc802dce8376 at (65.225,30.375) mm; 0.20 mm trace, reported length 7.2042 mm. Commit e34de8e8. The C47 ground airwire disappeared on read-back.
Exact mapping and retained geometry
All coordinates below are document/world mm, not mirrored Bottom inline-rule coordinates.
  • RS2 element UID e4d71851-5b1b-4ca5-95e7-f2ab6249e943, Top, center (60,60), rotation 90°.
    • Terminal 1 / SHUNT_V_HI: bound pad e4d71851-5b1b-4ca5-95e7-f2ab6249e943__c66ad32c-45a2-4c3b-a32d-dfaa65a86b3e, center (60,56.9). Intended Kelvin destination U6 IN+ / pin 8.
    • Terminal 2 / PGND: bound pad e4d71851-5b1b-4ca5-95e7-f2ab6249e943__b2e26db5-d07c-4d5c-a726-747a33ad9237, center (60,63.1). Intended Kelvin destination U6 IN− / pin 1.
    • Both lands are terminal-bound; no new shunt copper or shunt bypass was authored. Existing high-current SHUNT_V_HI path remains unchanged.
  • U6 element UID 18c4ed4a-686a-4779-8d15-5100ff190e2d, Top, center (21,26), rotation 180°.
    • IN+ bound pad suffix __e771c183-cd96-46ea-ba47-191a7f3a8b3c, approximately (18.525,24.095).
    • IN− bound pad suffix __dded9c51-ef38-438d-bf23-e79cc020c415, approximately (23.475,24.095).
    • GND pin 2 suffix __8c22bc7e-bad9-48dc-932f-3a7cc0ff1d5b, approximately (23.475,25.365).
    • GND pin 4 suffix __d253b442-7535-4104-89e0-5ee646500b56, approximately (23.475,27.905).
  • TP15 element UID 3e80fca0-85d7-42b0-869e-59f7be205b83, Top, center (66,-20), rotation 90°.
    • Bound pad 3e80fca0-85d7-42b0-869e-59f7be205b83__c42ac6bc-f5dc-408e-9659-121c139e654b uses the existing 3.43 × 4.7 mm physical-land override.
    • Unbound duplicate 3e80fca0-85d7-42b0-869e-59f7be205b83__1867005e-da27-4bb5-ba1e-7c62e3354fe6.defaultFootprint.mounts.3dd23551d0bb3a10d8abd068b7ab31b0 already has active: false !important. Do not reactivate or remove the bound pad. No test-point-access routing attempt was made in this batch.
  • Existing Q1–Q7 custom drain mapping and disabled duplicate lands were inspected in rules and left untouched. The seven same-net source-pad merging warnings remain pre-existing.
Two genuine failed ground attempts and stop condition
  1. Route U6:GND::4, C45:P2 and R38:P2 at 0.20 mm, timeout 60 s per pair. Router tried from U6 ground escape ...-11 to C45:P2 and to existing PGND trace 3c4b4103-0a41-45c2-bb3d-a3f732366348 at (18,36.5). Entire batch rejected: 2 Overlapping Copper errors. No routes applied.
  2. Narrowed scope to the exact U6 pin-4 bound-pad UID above and C45:P2, 0.15 mm, timeout 120 s. Again the router reused the locked ...-11 escape; rejected for 2 Overlapping Copper errors. No routes applied.
Routing stopped here, not after additional retries or unauthorized placement edits. The rejection reports did not identify the exact two colliding object UIDs, so the collision partner is not proven; the returned escape and terminal coordinates are the known blocker context.
User checkpoint: proposed operations, NOT applied
  1. Approve disabling only the V-specific merged IN−/GND2 escape: neckdown-trace-customshape-6b7c99ee-6b73-4fc2-98a5-46d74e37a8a4-18c4ed4a-686a-4779-8d15-5100ff190e2d-1788835694930-10. Its Top polygon spans x=22.5…26.8, y=23.168…25.715 mm and covers both IN− and GND2. Proposed exact operation: a UID-selector override active: false !important, preserving the actual terminal pads. This is necessary before separating the IN− Kelvin conductor from supply-ground routing.
  2. Approve disabling the V-only pin-4 ground escape reused by both failed attempts: neckdown-trace-customshape-6b7c99ee-6b73-4fc2-98a5-46d74e37a8a4-18c4ed4a-686a-4779-8d15-5100ff190e2d-1788835694930-11. Top polygon spans x=22.5…26.8, y=27.555…29.043 mm. Proposed exact operation: UID-selector active: false !important, then route from the actual GND4 pad. This is a proposed remedy, not a proven fix for the unidentified collision partners.
  3. If retaining the current U6 location, proposed local-bypass move: C45 UID 6fd29b00-e976-46ea-8873-f6dbea9c8502, (33,21) → (21,28) mm, keep Bottom, set rotation 180°. Reinspect pad orientation/access and nearby copper before applying; reroute only its V-local connection. This proposal is not placement-DRC approved and is not a complete solution to the remote Kelvin placement.
  4. A genuinely short RS2/U6 pair also needs approval to develop a V-only relocation plan near RS2; the existing 51.7 mm center separation is not a short local current-sense cell. No specific U6 relocation has been clearance-validated. Do not move RS2 or disturb verified phase/gate copper as a shortcut.
Do not globally unlock neckdowns, disable PGND copper, change the high-current net-wide widths, move TP15, or alter U/W channels. Any future narrow Kelvin traces need trace-scoped handling of the existing 4 mm SHUNT_V_HI width override, not weakening the high-current path.
Direct V residuals: eight reported airwire representatives
These are the tool's spanning-tree/island representatives, not necessarily the exact physical routes that should be built.
  1. SHUNT_V_HI: U6 positive escape neckdown-trace-customshape-51a9e841-95f5-4098-b3ab-d33176e465e6-18c4ed4a-686a-4779-8d15-5100ff190e2d-1788835694930-3 → Q4:S::1 island. Required repair must originate at RS2:1, not Q4.
  2. PGND: U6:IN− → neckdown-trace-customshape-6b7c99ee-6b73-4fc2-98a5-46d74e37a8a4-5c73d127-12e0-4606-9d71-68cda0a655b1-1788835694930-21. Required sensing route must originate at RS2:2, not this remote island.
  3. PGND: U6 escape ...18c4ed4a...-10 → C45:P2.
  4. PGND: U6 escape ...18c4ed4a...-10 → U6 escape ...18c4ed4a...-11.
  5. PGND: existing trace 3c4b4103-0a41-45c2-bb3d-a3f732366348 → U6 escape ...18c4ed4a...-11.
  6. PGND: C45:P2 → C36:P2.
  7. ISENSE_V: trace 070c438f-4e66-4f19-bf33-c067943f7532 → TP15 terminal.
  8. ISENSE_V: trace cafa8ed7-f38d-4306-9918-19cec4d6eb8d → TP15 terminal.
Logical ISENSE_V terminals were cross-checked: R35:P2, C47:P1, TP15 terminal, U19:IN3−, U19:IN4+, U1:PB13, U1:PB11. Two output-net airwires mean the full set is not yet one copper island; do not claim MCU/comparator fanout complete merely because their pin names are absent from the airwire representatives.
Shared supply/protection residuals (preserved, not completed)
  • +5 V: 5 airwires remain: existing copper→U9:FB, existing copper→TP3, existing copper→U10:IN, C22:P1→U10:EN, U10:EN→U10:IN. No direct U6:+5 V airwire remains, but the overall supply/regulator network is incomplete.
  • VREF_1V65: 0 reported airwires after this batch. Source rail and shared PGND still require completion elsewhere.
  • VTRIP_HI: 5 airwires: C66:P1→U19:IN1+, R56:P2→R57:P1, R56:P2→U20:IN1+, U19:IN3+→U19:IN1+, U19:IN3+→U20:IN1+.
  • VTRIP_LO: 5 airwires: R54:P2→C65:P1, R54:P2→U20:IN2−, R55:P1→R54:P2, U19:IN2−→U19:IN4−, U19:IN4−→U20:IN2−.
  • U19 supply/return still open in shared network: C71:P1→U19:V+, and C71:P2 to comparator/latch PGND escape islands. MCU +3V3, +3V3_A and grounds also retain numerous shared opens.
  • ACTIVE_FAULT_N, latch clear/OK, GATE_ENABLE, GATE_PREREQ, HW_FAULT and precharge-valid nets retain airwires. The end-to-end protection/shutdown chain has not been certified functional.
  • PH_V retains its pre-existing Q4 drain→test-point-escape airwire. This is not a V-sense Kelvin route and was not changed.
Verification and caveats
  • Native final routing-state read: 340 board airwires, 70 redundant traces in 59 groups, versus initial 342 airwires and 67 redundant traces in 59 groups.
  • Final selected physical checks returned no findings for overlapping copper/traces, floating copper, invalid layers/pads, pad-access clearance, component bounds, keepouts or protected intrusions. Accepted-route delta checks reported no new physical DRC errors. Do not confuse this with full-board completion.
  • Both failed ground batches were rejected before persistence; their prospective overlapping-copper errors are not stored on the board.
  • Preflight before/after identical: 7 same-net MOSFET source-pad overlap warnings, 2 protected USB pair pin-access warnings, 4 EP via-at-SMD informational findings. Protected USB was intentionally untouched.
  • New redundant-trace warnings were introduced by accepted routes. They are warnings, not proof of floating copper or a short, and remain unresolved at the required stop. New reference warning group UIDs: 2be93ac4-b876-4b42-96bc-5b80e159aef6, 3cf63c76-13f7-4839-9b04-4c428372b99e, 4ed92a6f-42b5-4c31-a954-fed97b9e2c4c, 5b6da477-54e8-4512-b2aa-82a6ffeae2cd, d2830fd7-b5b0-4ac5-be9e-e2c2552bf82e. New C47-return warning UID: dbd0bfbb-9a12-437d-bf9c-b962b64762a6. Review surgically after approval; never bulk-delete board redundancy candidates.
  • Full native layout diff 0a14af78 → current, plus commit-detail inspection, confirms additions only on VREF_1V65 and PGND. U/W sensor copper, high-current copper, U2/U3/U4 drivers, Q7/precharge, protected USB and every component placement were preserved.
  • No shunt bypass was introduced: no SHUNT_V_HI or RS2 copper was changed and no new short was reported. True RS2 terminal-origin Kelvin geometry remains unimplemented, not verified.
  • PCB editor focus was requested for U6/RS2/TP15, but frontend returned “requester session not found”; no visual focus change can be claimed.
This bounded batch is finished at a user-approval checkpoint; neither the V channel nor the overall PCB is complete.
  • Result — partial, stopped at required checkpoint

  • Assigned-scope status

  • Every newly completed connection

  • Exact mapping and retained geometry

  • Two genuine failed ground attempts and stop condition

  • User checkpoint: proposed operations, NOT applied

  • Direct V residuals: eight reported airwire representatives

  • Shared supply/protection residuals (preserved, not completed)

  • Verification and caveats