Variable Frequency Drive PCB


Can you help me write a weekly report for this project with an abstract, images of the project, all the important things of the project, and a conclusion

flux

I’ll draft a weekly report with an abstract, project figures, progress, remaining issues and a conclusion. I’ll clearly separate the final 1 hp goal from the current low-voltage prototype and avoid claiming hardware tests that have not happened.
"VFD Capstone Progress Report" completed.

flux

I created your seven-page weekly report with two actual PCB images. The full schematic image was too zoomed out to read, so I used a board overview and an enlarged MCU-routing view instead.
Download your report
The report includes:
  • Abstract and project objectives
  • Specifications and system architecture
  • Captioned project images
  • PCB routing progress and branch-current analysis
  • Firmware results and component-rating concerns
  • Remaining challenges, next steps and conclusion
  • References to supporting project records
I saved a reading version in your project files: Weekly Progress Report.
Before submitting, fill in your name, course, instructor and reporting dates. The report distinguishes recent progress from cumulative work and clearly states that hardware testing and the final 230 V, 1 hp capability have not yet been demonstrated. Word pagination may vary; the PDF is the checked edition.

Electrical Rating Audit
Scope and disposition — 2026-10-17
Bounded design-notes audit only: 48 V nominal / 60 V maximum LV prototype, 5 A RMS phase / 10 A short peak / 20 kHz complementary PWM / coast-to-stop. No mains or 325 V authorization. Overall BLOCK: do not energize or release fabrication. This is not an end-to-end protection-loop qualification. No schematic, PCB, procurement or bring-up-file edits were made.
Listed all 29 project files before work and again before creation. Read Project Specification, Component Selection and Power Budget and Board Bring-Up Plan in full; read the returned latest ledger sections (the historical ledger response was truncated, so an exhaustive historical-ledger read is not claimed). Live full schematic reads verified the scoped values and terminals; a second complete metadata read independently checked divider, clamps, precharge comparator and driver net memberships. Latest ledger checkpoint is 54 airwires / one inherited HS via-in-pad Error, not a fresh layout measurement by this audit. Existing ADC reference/return and D4 signal opens prevent physical function regardless of the calculations below.
Severity: Error = established wrong/inadequate assertion; Warning = possible inadequacy requiring evidence; Info = noteworthy. PASS below applies only to the expressly bounded subclaim; CONDITIONAL is an envelope, not hardware acceptance; BLOCK prevents rating qualification.
Severity-ordered findings
  1. Error / BLOCK — D1 does not guarantee protection of U8 at its published rated surge point. D1 is actually Littelfuse 1.5SMC75A, K=DC_BUS/A=PGND. Its 64.10 V standoff and 103.0 V maximum clamp at 14.8 A are verified at 25°C. U8 VIN and EN are both directly DC_BUS and each has 100 V absolute maximum; recommended VIN is 6–100 V. The full-rated clamp exceeds the U8 limit by 3 V before local inductive overshoot. A smaller real surge may be compatible, but source impedance/waveform/temperature/cable inductance are absent. Do not linearly interpolate a guaranteed safe TVS current from the clamp and breakdown endpoints. The historical statement that higher-voltage MOSFETs solve bus coordination is incomplete.
  2. Warning / BLOCK — precharge bootstrap startup has no guaranteed timing margin. U25 INP is PRECHARGE_VALID directly from U20 OUT3, not the delayed bridge-enable chain. BST connects only C77=100 nF to TS=DC_BUS; no external BST diode is present in that complete net. Required charge-pump interval is measured from valid U25 power, not J1 application. The nominal unloaded RC delay cannot establish this interval. Residual bus/hot restart can assert INP much earlier.
  3. Warning / BLOCK — resistor pulses/retries and Q7 bypass SOA not qualified. Nominal charge energy is computable, but duty, source current limiting, auxiliary startup loading, capacitance extremes, restart interval and initial temperature are not established. A 5 W continuous resistor label is not pulse qualification; a MOSFET case-cooled current rating is not PCB thermal qualification.
  4. Warning / BLOCK — correct clamp topology does not establish analog fault survivability. D3/D4 pin functions and live mapping pass the topology check below. Rail sinking/backpower, analog-mode input limits over temperature, ADC sampling/settling and physical returns are unresolved. No positive-injection-current allowance is assumed.
  5. Warning / BLOCK — auxiliary budget is an allocation, not a current inventory. Exact inductors remain generic, without sourced DCR, inductance tolerance/bias, RMS current or hot Isat. Historical U9 PFM description is wrong for the placed FPWM suffix. New protection logic and low-resistance reference load require explicit accounting.
1. Bus coordination and margin table
C1/C2 live MPN is Nichicon UCY2C471MHD, not the old 80 V Panasonic selection. Each is verified 470 µF / 160 V. Thus the old bulk-capacitor 80 V concern is closed for part identity/nominal voltage only, not ripple/life/assembly. C4 live MPN ECW-F2105JAQ has a 250 V role description, not the old 100 V description; exact manufacturer rating was not independently queried here and remains unverified. C3/C5/C6/C7 live TDK parts are described as 100 V; the shared catalog query did not validate the exact suffix rating, so independent exact-part evidence remains open. C8/C14=2.2 µF and C53/C61/C64=100 nF have explicit 100 V schematic properties, but no approved MPN.

Table


ItemApplied conditionHeadroom / resultStatus
D1 standoff60 V normal maximum4.10 V below 64.10 V; 6.83% of 60 VPASS static comparison only, cited rating above
U8 VIN and EN60 V normal / 103 V rated TVS clamp+40 V normal / −3 V surge margin to 100 V absolute maximumBLOCK surge
Generic 100 V bus capacitors60 V normal / 103 V clamp+40 V / −3 V against schematic requirementBLOCK exact sourcing and surge
C1/C2 verified 160 V103 V clamp+57 V static nominal-rating differenceCONDITIONAL; ripple/temperature/transients open
Q760 V bus, actual VDS is FUSED_DC−DC_BUS150 V minimum breakdown, not permission to dissipate arbitrary startup energyCONDITIONAL
Q7 breakdown minimum is 150 V at VGS=0, ID=1 mA; maximum RDS(on)=7.4 mΩ at VGS=10 V, ID=50 A, 25°C. Do not subtract bus voltage from breakdown and call the resulting number a switching-overshoot qualification.
Required decision/test: define actual source maximum, surge open-circuit waveform and source impedance, cable inductance, source sinking capability and regeneration envelope. Either coordinate the clamp to every directly exposed device with tolerances/temperature/local overshoot or redesign the exposed auxiliary branch/ratings. Qualify on a reviewed fixture or model first; no destructive surge applied to this incomplete board. Measure at U8 VIN/EN and local bypass terminals, not just at D1. Sustained regenerative energy is not a TVS pulse-rating use case.
2. Precharge: verified path and bounded calculations
R67–R70 are four AC05000001000JAC00 100 Ω parts in parallel, each P1=FUSED_DC/P2=DC_BUS: nominal equivalent 25 Ω. Q7 drain terminal 5=FUSED_DC, source terminals 1/2/3=DC_BUS; U25 TS=DC_BUS, TGUP/TGDN=Q7 gate, VCC=+12V_GATE, GND/EP/OVLO=PGND; VCCUV is explicitly NC. This verifies insertion/distinct nets, not fail-safe operation. U20 IN3− is input divider /22 and IN3+ is bus divider /20.06 plus 1 MΩ output feedback. The often-quoted ratio 20.06/22=91.18% ignores hysteresis/output loading; it is not the exact trip ratio.
For an ideal stiff step, Q7 off, initially empty nominal 940 µF bulk, no converter load and ignoring extra bypass capacitance:
Req=25 Ω,τ=ReqC=23.5 ms,VB=VS(1−e−t/τ)R_{eq}=25\ \Omega,\quad \tau=R_{eq}C=23.5\ ms,\quad V_B=V_S(1-e^{-t/\tau}) I(0)=VS/Req,ER=12CVS2,peach(t)=VS2/100⋅e−2t/τI(0)=V_S/R_{eq},\quad E_R=\tfrac12 CV_S^2,\quad p_{each}(t)=V_S^2/100\cdot e^{-2t/\tau}

Table


Quantity48 V60 V
Initial bank current1.92 A2.40 A
Initial each-resistor power23.04 W36.00 W
Total bank energy, full charge1.08288 J1.692 J
Each resistor, matched full charge0.27072 J0.423 J
Ideal time to illustrative 91.2%57.115 ms57.115 ms
These are not approved supply current limits. AC05 is P40=5 W / P70=4.7 W. Its pulse guidance distinguishes peak-power/duration/repetition curves from adiabatic single-pulse energy, the latter typically only ≤10 ms. The 23.5 ms voltage time constant / 11.75 ms power time constant is not automatically covered by the short-pulse energy graph. No graph-derived numeric pass is asserted. Allowable repetition must satisfy both the actual pulse curve and average/thermal limit, not just energy divided by 5 W.
For unloaded charging with initial voltage V0, substitute the source-to-initial-bus difference in the resistor-energy equation; include source tolerance, actual capacitance and worst resistance/current sharing. With constant precharge load IL, the asymptotic bus is VS−25IL. Reaching ratio k requires ILexternal MOSFET QG/1 V; approximately 30 µA pump; external BST diode required if power-up-to-INP interval is less than CB×12 V/30 µA (40 ms for 100 nF). Q7 Qg is 41 nC typical / 52 nC maximum for VDD=75 V, ID=50 A, VGS=0→10 V. Nominal 100 nF exceeds 52 nF and a 52 nC transfer implies 0.52 V droop, conditional on effective capacitance, actual 12 V gate charge, driver loss and leakage; generic C77 has no DC-bias/tolerance evidence. The nominal 57 ms after input application does not prove 40 ms after +12V_GATE becomes valid.
Exact next evidence: approve resistor pulse/retry envelope with manufacturer curve or manufacturer confirmation for the exponential waveform; identify Cmax and resistor tolerances; capture source/bus/current, +12V_GATE, INP, BST−TS and Q7 VGS on reviewed cold start, residual-bus restart and brownout fixture. Require valid bootstrap voltage before every bypass, no premature bypass, acceptable SOA and bank temperature; define timeout/cooldown numerically before tests. No live test is authorized here.
3. Divider and clamp fault-current envelope
Live R2=R3=100 kΩ ±0.1%, R4=10 kΩ ±0.1%, R5=4.7 kΩ (tolerance/MPN absent). R2/R3 form the 200 kΩ upper string, R4 returns BUS_DIV_RAW to PGND; R5 leads BUS_SENSE→PC0. Correct BAT54S pin1=anode, pin3=series midpoint, pin2=cathode is verified. Read-back: D3 1=PGND/3=BUS_SENSE/2=+3V3; D4 1=PGND/3=SPEED_CMD/2=+3V3. PASS topology correction only. D4 has R53=1 kΩ from SPEED_POT_RAW, not a 21:1 divider.
VTH=VB/21,RTH=200k∥10k=9.52381kΩ,Iupper=max⁡(0,(VTH−VC)/(RTH+4.7k))V_{TH}=V_B/21,\quad R_{TH}=200k\parallel10k=9.52381k\Omega,\quad I_{upper}=\max(0,(V_{TH}-V_C)/(R_{TH}+4.7k))
Use measured clamp voltage VC, including rail voltage and diode drop. Illustrative VC=3.6 V is an assumption, not a guaranteed diode/MCU limit. BAT54S VF maximum at 25°C is 240 mV at 0.1 mA, 320 mV at 1 mA and 400 mV at 10 mA; no corresponding minimum/whole-temperature guarantee is inferred.

Table


Case, nominal resistorsResultMeaning
Healthy 48 / 60 V2.285714 / 2.857143 VIdeal unloaded ADC input
Healthy 60 V, worst divider ratio from ±0.1% only2.862590 VExcludes ADC/reference/leakage error
Healthy 103 V, VC=3.6 V91.73 µA upper-clamp currentSurge-rating failure elsewhere remains
R4 open, 60 V, VC=3.6 V275.53 µAThrough 200 kΩ+R5
One upper resistor short, 60 V, VC=3.6 V134.48 µAUses 100 kΩ/10 kΩ Thevenin network
Rail off, healthy 60 V, assumed VC=0.3 V179.78 µA to unpowered railBackpower estimate, not safe allowance
Raw node forcibly shorted to 60 V, VC=3.6 V12.0 mA through R5; 0.677 W in R5Not protected by the divider; generic 0603 not qualified
Normal divider current at 60 V is 285.714 µA. Each 100 kΩ resistor dissipates 8.16 mW at 60 V, with 28.57 V across each; the exact MPN working-voltage/pulse limit remains needed. D4 external fault envelope is current=(external voltage−VC)/1 kΩ absent other source resistance; external harness/source voltage is unknown, so no finite pass is possible.
ADC conversion range is 0→VREF+, not the generic GPIO tolerance. PC0 FT_a injection table is −5/0 mA negative/positive, and the absolute-maximum table presumes valid supplies; no separate unpowered guarantee was established. Do not interpret small external-diode current as permission for MCU injection. Clamp to +3V3 also does not prove compatibility with filtered +3V3_A/VREF+ under all conditions.
Next: select exact R5/R53 ratings/tolerances; define one-fault set and external connector fault voltage/source impedance; verify analog-mode limits, diode curves/leakage over temperature, supply-off rail absorption and reverse-current behavior of U10. Then analyze ADC acquisition from 14.224 kΩ effective source impedance and actual filter/cable/copper capacitance; measure calibration, settling and noise only after reference/return continuity is complete. Do not inject an unpowered ADC or clamp fault into this unfinished board.
4. Auxiliary regulator / inductor envelope
Documentation reconciliation — 2026-10-17: The later Procurement BOM — Generic inductors records researched conditional Bourns candidates: SRR1260-680M for L1 and SRN6028-4R7M for L2, with candidate-specific sourced current data and, for L2, verified DCR; L1 DCR units remain unresolved there. This qualifies the earlier summary finding 5: “without sourced DCR/RMS” describes the generic placed components and the absence of an exact approved assembly MPN, not an absence of researched candidate data. The schematic inductors remain generic; neither candidate is selected or release-approved, and the BOM is not finalized. Use the procurement file's cited candidate evidence and limitations rather than treating schematic Isat properties as candidate guarantees. Guaranteed hot Isat/minimum inductance, winding/core loss, fault-current peaks and current-limit delay, exact footprint/land-pattern fit, and complete rail-current inventory remain blocking holds. No electrical value, circuit, candidate approval or release status changes with this reconciliation.
Verified tree: U8 VIN/EN=DC_BUS, SW→L1 68 µH→+12V_GATE; U9 VIN/EN=+12V_GATE, SW→L2 4.7 µH→+5V, FB=+5V; U10 IN/EN=+5V, OUT=+3V3. Live 12 V loads: U2–U4 and U25 plus U9/ref divider. Live 5 V loads: U5–U7 and U10. Live 3.3 V loads include U1, U13 board side, U11 filtered supply, U14–U17, U19–U24/U26, R37/R38 reference and pull/divider/connector loads. USB bridge/USB-side isolator remain separately host powered; not included as bus loads.
The previous file allocates 120 mA peak at 3.3 V, 147.2 mA at 5 V and 89.3 mA at 12 V using assumed efficiencies 85%/90%. Those are historical allocations, not fresh measured totals. R37/R38 are actually 100 Ω each, giving a definite additional line item of 16.5 mA at 3.3 V and 27.225 mW each; this may or may not have been covered by the old I/O reserve and must not be blindly added twice. Protection IC static/dynamic currents, pull-up states, connector load maximums and firmware MCU workload remain unsummed. U25 static-current lookup did not validate a numeric maximum; no guessed value is used. Sleep/typical/peak-duration inventory remains BLOCK.
U9 exact Y5F suffix is fixed 5 V / 2.1 MHz FPWM, not PFM. Its output is 1 A; oscillator range 1.8–2.4 MHz. U8 RON=100 kΩ; datasheet CCM equation is FSW(kHz)=VOUT(V)×2500/RRON(kΩ), hence about 300 kHz at 12 V.
For ideal CCM buck ripple (nominal L, output voltage and frequency), not a startup/fault model: ΔIL=VO(1−VO/VI)/(Lf),Ipk=IO+ΔIL/2\Delta I_L=V_O(1-V_O/V_I)/(Lf),\quad I_{pk}=I_O+\Delta I_L/2

Table


PathConditional ripple / peak at historical allocationMargin and missing bound
L1 68 µH, 60→12 V, 300 kHz0.47059 A p-p; 0.32459 A CCM extrapolated peak at 89.3 mALow load is likely non-CCM, so this is not a guaranteed actual peak; at 1 A, CCM peak=1.2353 A before L/f tolerances
L2 4.7 µH, 12→5 V, 1.8 MHz minimum0.34476 A p-p; 0.31958 A peak at 147.2 mAFPWM negative valley is possible; at 1 A output peak=1.1724 A before tolerance
U10 at historical 120 mADissipation 0.204 W180 mA nominal current-rating headroom, not total-load qualification
U8 HS/LS limits span 1.25/1.5/1.75 A minimum/typical/maximum. U9 HS limit at 12 V spans 1.25/1.6/1.9 A, LS 0.9/1.1/1.3 A. L1 schematic Isat requirement 1.8 A is only 50 mA above U8 maximum limit before delay/overshoot; L2 requirement 1.5 A is below U9 maximum HS limit. This does not prove normal-load saturation, but fault-current robustness is not qualified. Specify real parts for minimum inductance under bias/temperature, hot Isat at a stated inductance drop, RMS winding temperature, DCR/core loss and fault peaks; schematic properties are not manufacturer guarantees.
U10 current range is 0–300 mA. DBV reference RθJA is 187.1°C/W. At 120 mA this predicts 38.17°C rise on that reference thermal model; at 300 mA, 0.510 W and about 95.42°C rise. Neither is a board temperature measurement. Allowable current must satisfy both 300 mA and the chosen junction-temperature/ambient/actual-board thermal envelope. The old statement that ordinary SOT-23 copper is simply acceptable is insufficient.
Next decisions/tests: reconcile every rail load including state/duration and external I/O maximums, reflect through measured or guaranteed efficiency at actual load, include quiescent/startup charging, then approve startup current limits. Select/verify exact inductors before assembly. In an approved fixture after routing/release holds, capture startup/short-circuit recovery, peak inductor current, rail ripple/load steps and regulator/inductor temperatures; qualify using actual minimum L and frequency and current-limit delay. No current or thermal PASS is issued from historical allocation alone.
5. Actionable surge / precharge correction options — 2026-10-21
Documentation-only proposal; not implementation approval. Fresh scoped schematic inspection confirms U8 VIN/EN directly on DC_BUS, D1 across DC_BUS/PGND, U25 INP directly on PRECHARGE_VALID and PRECHARGE_BST containing only U25 BST/C77 P1. Distinct FUSED_DC/DC_BUS and isolated USB_GND are unchanged. All earlier release holds remain.
Surge decision: two bounded architectures

Table


OptionConcrete actionAcceptance and limitations
A — restricted bench source, existing auxiliary hardwareRetain U8/D1 only for a separately approved, current-limited, non-regenerative fixture. Specify the source and wiring, prohibit hot plugging and motor regeneration, and validate its transients before connecting this board.Required operational envelope is DC_BUS including overshoot ≤60 V, preserving the project's maximum; at 48 V the total positive tolerance/transient budget is 12 V, at 60 V it is zero. U8's mathematical destruction boundary is overshoot <100−Vsteady V (40 V at 60 V), but this is not an approved operating envelope or derating target. This option does not repair D1/U8 surge coordination and does not authorize motor operation.
B — higher-rated 12 V auxiliary buck, recommended design directionRedesign U8's block around LTC3638HMSE#PBF, library UID f35f402f-da3c-469a-b5f5-e178e3ad895b, with manufacturer-reference input/output networks and a new external 12 V supervisor. Keep its input on DC_BUS, downstream of the existing precharge path.LTC3638 supports 4–140 V input and adjustable 20–250 mA maximum output current; 140 V is also VIN absolute maximum, not extra transient headroom. The 103 V D1 published clamp has 37 V static difference to that boundary, before overshoot/temperature. This removes the specific 103-versus-100 V regulator mismatch, not whole-board surge qualification. Existing directly exposed 100 V capacitors still need coordinated protection or higher ratings.
LTC3638 limits above are manufacturer-verified. It is not pin-compatible with LM5164. Its 12 V example uses the fixed-5-V setting plus divider R2=196 kΩ/R1=264 kΩ; VPRG1=SS, VPRG2=GND. These are reference-study values, not a selected circuit BOM. FBO is a feedback-comparator output, not a replacement for U8 PGOOD; redesign PWR_GOOD_12V and its hardware enable chain using a qualified supervisor, not an FBO wire substitution.
Use the 2026-10-21 authoritative revision of Component Selection and Power Budget, not §4's historical allocations: conditional envelope E gives about 92.39–98.08 mA at 12 V for the stated efficiency assumptions and no external load. Thus 250 mA is a plausible candidate capacity, not a load/startup guarantee. Recalculate for the replacement converter's efficiency, minimum delivered current, startup capacitance/ramp, external load X, added supervisor/delay current, inductor and thermal limits. Its library result has no attached datasheet; manufacturer family PDF was consulted independently. Package/pad mapping must be verified before placement.
Source inputs still required for either option: maximum regulated voltage including tolerance, transient waveform and source impedance, current-limit behavior, cable L/R, sink capability, stored and regenerative energy, temperature and repetition. No safe TVS surge current has been inferred from endpoint interpolation. Alternative active branch protection would require a separately researched surge-stopper/pass-FET SOA and fault-power design; no resistor/TVS values are approved here.
Recommendation: approve B for detailed circuit design, while treating A only as a possible restricted-fixture policy. Retain 48 V nominal/60 V maximum and coast-to-stop; neither option grants mains use or fabrication release.
Precharge correction: diode plus independent startup qualification
  1. Proposed bootstrap diode: manufacturer Figure 3 topology is anode +12V_GATE/VCC, cathode PRECHARGE_BST/BST, not TS or PGND. It specifies a low-reverse-leakage silicon diode rated above VIN. Nexperia BAS21 is a researched conditional candidate (SOT23: pin1=A, pin2=NC, pin3=K); continuous VR=200 V, repetitive peak VRRM=250 V. Exact orderable/library identity remains to resolve: searches returned mixed variants and one BAS21-named entry actually containing ZHCS500TA data; do not place that entry or substitute a variant silently.
  2. Voltage/leakage qualification: diode reverse stress must cover BST absolute voltage when VCC falls: roughly 60+12=72 V at nominal maximum bus, or 103+12=115 V at the cited TVS point, plus actual tolerances/overshoot. These are bounding examples, not qualified surge waveforms. BAS21 IR maximum is 100 nA at 200 V/25°C but 100 µA at 200 V/150°C; therefore it is not approved over a hot range merely because its room-temperature leakage is small. U25 pump is 15 µA minimum/30 µA typical at TS=20 V and BST−TS=10 V; its applicability across the actual startup voltage/temperature must be established. Total diode/capacitor/driver leakage must leave positive guaranteed charging current. Require hot leakage evidence at the chosen maximum junction temperature and actual reverse voltage, or source another diode.
  3. Diode alone is not a hot-restart fix. With residual TS≈60 V and VCC≈12 V, the VCC→BST diode is reverse-biased; the pump must charge the floating supply. U25 uses the higher of TS or VCC and regulates BST−TS to 12 V. The nominal 100 nF×12 V/30 µA=40 ms example is not guaranteed timing after valid bias. Even using 15 µA would give 80 ms before leakage, gate charge and tolerance, and is only illustrative at that current's specified conditions.
  4. Required topology change for review: separate U25 INP from raw PRECHARGE_VALID and hardware-AND it with a default-low, independently qualified BOOTSTRAP_READY permission. Reset permission on every 12 V brownout/power interruption; qualify residual-bus restart as well as cold start. Preserve raw PRECHARGE_VALID for its existing bridge-chain role; ensure bridge permission cannot precede successful bypass readiness. Prefer actual floating-supply readiness sensing, or a rail-valid-reset hardware delay with a demonstrated worst-case charge bound; no MCU-only delay and no guessed timer values. Keep Q7 off until both conditions are valid. A precharge timeout/cooldown must prevent resistor overheating while waiting.
  5. Sizing/acceptance holds: source exact C77 and bound effective Cmin for gate droop and Cmax for startup delay; use actual 12 V Qg plus driver losses. Bound tready ≥ (Cmax·ΔV + required charge)/(Ipump,min−Ileak,total) only where the pump minimum is guaranteed. U25 BST−TS and VCC each must stay ≤15 V; TS/BST absolute limits are 150 V. Floating UVLO's 3.1 V rising typical is not proof of fully enhanced Q7. Validate cold/residual restart, brownout, gate VGS, bypass VDS/ID SOA, resistor pulse/retry temperatures and timeout on an approved fixture after all release holds clear.
Specific approval requested before circuit mutation: select surge architecture B or expressly bounded A; approve adding the Figure-3 diode subject to exact-part/hot-leakage qualification; approve an independent default-off bootstrap-ready/INP-interlock design and precharge timeout. Exact diode, supervisor/readiness circuit, timing values and pass criteria remain blocked on the stated source/temperature/startup evidence. No schematic, layout, BOM or bring-up-plan edits were attempted in this proposal batch.
Completion matrix

Table


Assigned itemWork performedQualification
List/read records; independent live values/pinsCompleted, read limitations statedPASS evidence scope
D1/U8/bus capacitor coordination notesCompleted, actual bulk identity correctedBLOCK full surge
Precharge resistor/Q7/U25 charge-time envelopesCompleted calculations and explicit missing inputsCONDITIONAL nominal charge; BLOCK pulse/restart/SOA
Divider and corrected D3/D4 fault-current notesCompleted topology verification and fault tablePASS mapping; CONDITIONAL current math; BLOCK complete protection
Auxiliary regulator/inductor marginsCompleted, FPWM correction and reference-load line itemCONDITIONAL allocated operation; BLOCK sourced/thermal/fault/load qualification
Dedicated project fileCompleted creation; read-back required belowDocumentation only
Circuit/layout/procurement/bring-up mutationUnattempted by instructionNone authorized
Physical tests / dynamic safety / complete shutdown-chain qualificationUnattemptedBLOCK; no safety claim
Calculations were evaluated with the math tool from live values and stated assumptions. No source impedance, retry duty, thermal environment beyond the historical 40°C allocation, peak duration or external current load was invented. This finite audit batch is complete; overall design/release is not.
  • Scope and disposition — 2026-10-17

  • Severity-ordered findings

  • 1. Bus coordination and margin table

  • 2. Precharge: verified path and bounded calculations

  • 3. Divider and clamp fault-current envelope

  • 4. Auxiliary regulator / inductor envelope

  • 5. Actionable surge / precharge correction options — 2026-10-21

  • Surge decision: two bounded architectures

  • Precharge correction: diode plus independent startup qualification

  • Completion matrix