Variable Frequency Drive PCB


Can you help me write a weekly report for this project with an abstract, images of the project, all the important things of the project, and a conclusion

flux

I’ll draft a weekly report with an abstract, project figures, progress, remaining issues and a conclusion. I’ll clearly separate the final 1 hp goal from the current low-voltage prototype and avoid claiming hardware tests that have not happened.
"VFD Capstone Progress Report" completed.

flux

I created your seven-page weekly report with two actual PCB images. The full schematic image was too zoomed out to read, so I used a board overview and an enlarged MCU-routing view instead.
Download your report
The report includes:
  • Abstract and project objectives
  • Specifications and system architecture
  • Captioned project images
  • PCB routing progress and branch-current analysis
  • Firmware results and component-rating concerns
  • Remaining challenges, next steps and conclusion
  • References to supporting project records
I saved a reading version in your project files: Weekly Progress Report.
Before submitting, fill in your name, course, instructor and reporting dates. The report distinguishes recent progress from cumulative work and clearly states that hardware testing and the final 230 V, 1 hp capability have not yet been demonstrated. Word pagination may vary; the PDF is the checked edition.

Candidate Branch Island Membership
Revision M2-S — support closes mapping hold, 2026-11-03
B2/B6/P9 terminal-mapping and leaf-membership hold CLOSED from supplied Flux support evidence. This addendum supersedes the M2 blocked/unknown leaf findings below; M1/M2 remain historical inspection records, not current blockers. No renewed transform investigation, broad reconstruction or hardware mutation was performed. Source: user-supplied Flux support response, read in full; SHA256 4949972ce89db67cc10742fec6c181d3d7d698f37736944c586b5c56ac8513a0. The following findings are support-verified baked-data/routing-DRC facts supplied by the user, not independent current measurements by this executor.

Table


Island/seedVerified membership or exclusionWorld center mm / interpretation
T2, R2:P1{R2:P1}, singleton terminal/pad island; no other terminal or copper attachedDC_BUS (-58.5375,44)
T1, R1:P1{R1:P1}, singleton terminal/pad island; no other terminal or copper attachedDC_BUS (-62.9625,40)
G1, R1:P2{R1:P2}, singleton terminal/pad island; no other terminal or copper attachedPGND (-57.0375,40)
S_D, trace 5c3b74f8-9353-4f1d-bf07-ebd0a5b0d216B2 DC_BUS source island excludes R1 and R2Not classified as a low-current source/trunk; complete unrelated source-terminal list not supplied or claimed
S_G, trace 116a0653-0535-48ab-86e4-fd3f6773df7cP9 PGND source island excludes R1 and R2Not classified as bleeder-only; complete unrelated source-terminal list not supplied or claimed
Support also verifies R2:P2 BUS_DIV_MID(-61.4625,44), C45:P2 PGND(77.1,59.125), C45:P1 +5V(77.1,60.675); traces09c95cc6,4685657a,fa1c0d12 meet same-net pads. Bottom hierarchy rotates first, then mirrors X; SVG rectangles are already mirrored: use data-world-x/y without a second mirror. Raw Bottom trace-rule X is mirrored. There is no terminal mismatch. Support reports no active copper pours. Historical Hm/Hu and C45 apparent contradiction below must not be reused as an open defect.
Cut-edge consequence for the exact proposed tree only: S_D→B2→T2→B6→T1, with R1 resistor returning through G1→P9→S_G. T2 adds only the R2/R3/R4 divider path (including its C10/ADC loading); T1/G1 add only R1. Thus B2 carries divider plus bleeder, B6 and P9 carry bleeder only. Main current on either source island need not traverse these terminal leaves. This closes the specific no-additional-downstream-load mapping gate, without fabricating exhaustive source-island copper manifests or qualifying source trunk current. New routing must preserve this tree: no onward main-current path, extra tap, parallel return, shunt bypass or other island attachment through T2/T1/G1. Any attachment/topology change invalidates this scope.
Completed: support evidence attribution, three singleton certificates and source exclusions, mapping-hold closure, linkage to A3 calculations. Unresolved: R1 tolerance/part voltage/pulse/hot ratings; real route geometry, current/transient/return implications and final clearance; exact new-UID policy/width approval. No independent complete graph reconstruction claimed. Unattempted/prohibited: routing, hardware, rule, component, net, firmware or width-approval changes. Proposed0.30mm only; existing≥5mm trunks and exact exceptions untouched. All unrelated release holds retained.

Historical M2 record — mapping blocker superseded by M2-S support evidence above
Revision M2 — native-reconstruction fallback stopped at a demonstrated transform conflict, 2026-10-23
Qualification FAILED/BLOCKED for B2, B6 and P9. This follow-up progressed beyond M1's first-page inventory stop, but did not produce five connected-component certificates or a complete active geometric graph. The actual stop operand is unresolved current Bottom terminal-to-world geometry after R1 and R2 controls plus an independent C45 trace/net control—not pagination, an empty custom shape, or an assertion that native geometry is unavailable. No transform hypothesis was silently chosen. Inspection/evidence recording completed; the requested reconstruction/certification did not complete. No new width, hardware mutation or release authority.
M2 coverage — distinguish complete inventories from incomplete reconstruction

Table


OperandObserved coverageDisposition
DC_BUS net-owned subtree, computed rules131/131, pages1–82 and83–131, terminal footer Read complete; includes root, ordinary/custom traces,16 SmartVia parents/16 physical childrenComplete returned subtree. Component-owned pads are elsewhere; this is NOT a complete physical-component graph. Computed active=false pieces remain explicitly distinguishable.
PGND selected net-owned structural subtree, rules=none973/973, five pages1–296,297–488,489–674,675–861,862–973Complete structural inventory including22 custom-shape traces. This supersedes M1's25/973 stop. Complete computed-active filtering and terminal adjacency are NOT certified.
PGND computed-rule window131/160 of that requested windowIncomplete; not equated with all973 structural nodes. No absence claim.
Combined DC_BUS/PGND component-selected pads/parents query, computed rules307/771; pages1–206 and207–307;464 remainIncomplete. Total includes132 elements,132 footprints and507 component-selected pads. Opposite-net pads are returned; effective-net filtering still required. Paging remained available and was not the reason for stopping.
R1 and R2 full computed subtrees11/11 eachComplete per-component records/pads, not complete copper-island memberships.
C45 computed pad control2/2 plus scoped Bottom Copper SVG and current trace controlsComplete selected control; not a whole-island certificate.
DC_BUS custom traceShapeActive, closed nonempty path,scale1,position0,TopAvailable/nonmalformed. No stop attributed to inaccessible custom copper.
Current routing_state with computed copper120/120;40 airwires,178 redundant items/70groups;no current poursComplete read-only status control. Imported fixed custom copper remains, including disabled pieces; no-pours does not mean no copper.
All current native queries omitted version_id. This is a current-state inspection sequence, not one frozen historical graph certificate. No new global export/import/rebuild was generated. The retained baseline was used ONLY as a historical transform control.
Reproducible actual blocker — current Bottom terminal world polygons unresolved
Define hypotheses only: Hm=component translation × rotation × local-X mirror; Hu=translation × rotation, without that local mirror. Native computed positions are parent-local, not guaranteed flattened world polygons. R1/R2 SVG component groups themselves contain scale(-1,1); their emitted named-pad rectangles do not consistently reconcile with those computed local positions. The table reports SVG named centers at displayed precision, not a claim of authoritative physical terminal geometry.

Table


ControlNative component/local terminal data,mmHm world P1/P2Current SVG named P1/P2 world,approx mmIndependent evidence
R1 506e056e-14f3-41ce-a222-e1fda7b84790Bottom(-60,40),180°;P1(-2.9625,0)=DC_BUS;P2(+2.9625,0)=PGND;pad1.225×3.35(-62.9625,40)/(-57.0375,40)(-57.04,40)/(-62.96,40),opposite named sidesHistorical baseline agrees with Hm. SVG group translate(-60,40) rotate(180) scale(-1,1).
R2 36090f69-05a1-4b2d-b330-e1529ea43d90Bottom(-60,44),0°;P1(-1.4625,0)=DC_BUS;P2(+1.4625,0)=BUS_DIV_MID;pad1.125×1.75(-58.5375,44)/(-61.4625,44)(-61.46,44)/(-58.54,44),opposite named sidesHistorical baseline agrees with Hm. Current BUS_DIV_MID trace09c95cc6 terminates atworld(-61.463,44),near the SVG-named P1 rather than its native-net P2.
C45 6fd29b00-e976-46ea-8873-f6dbea9c8502Bottom(77.1,59.9),270°;P1(-.775,0)=+5V;P2(+.775,0)=PGND;pad.9×.95P1(77.1,59.125)/P2(77.1,60.675)Same named centers as HmCurrent PGND trace4685657a reaches(77.1,59.125),while +5V tracefa1c0d12 reaches(77.1,60.675): opposite native-net attribution to those SVG names. No historical C45 claim used.
Exact R1/R2 pad/terminal UIDs remain in section2 below. R2 BUS_DIV_MID trace=09c95cc6-791f-4b8c-9ef2-c45e90355679; C45 PGND=4685657a-4f30-40e2-aafd-6af0bbfe7f52,+5V=fa1c0d12-25a8-4f6e-a7dd-7e0599743dc6. C45 pad suffixes P1=5237503d-4662-b83a-7859-31969858b9c0,P2=e5e04a27-c5c4-f2e6-5799-708eb3f01464 (component__suffix physical pad syntax). C45 PGND native Bottom trace(-77.1,59.125)→(-78,59.125) is emitted in SVG at(+77.1,59.125)→(+78,59.125),providing a selected trace-frame control rather than a general pad-transform rule.
Why this blocks certification: R1:P1/R2:P1/R1:P2 are three of the five unique seeds. A 2.925/5.925mm named-pad side swap changes terminal attribution and possible geometric intersections. Historical export and current trace/net controls support some frame interpretations, but historical export is not authoritative current terminal geometry, and SVG names cannot settle the conflict. C45 also shows why a single global mirroring recipe is unsafe. This is a demonstrated data/representation ambiguity, not a proven board short, unusable part, or established renderer/library defect. No repair or internal part-defect report is justified by this evidence alone.
Reproduce: (1)inspect.get_nodes tree each R1/R2 component UID,compact=true,rules=computed,includeStackups=false,includeSystemDefaults=false,limit1000; each returns11/11. (2)inspect.get_layout layout_2d,designators=[R1,R2],filter_layers=[Bottom Copper],page to completion and retain group transforms/pad UIDs. (3)repeat C45 layout_2d and get_nodes pad-only2/2,then inspect the exact PGND/+5V trace UIDs above. (4)compare the transcribed selected inputs with the control script. No invented physical-island API mode was sent.
Preserved executable evidence
These assets preserve selected transcribed native/control fields—not the complete973-node inventory or a fabricated raw-response archive:
Script executed exit0. Separate retained pcbnew baseline control reproduced all four R1/R2 pad coordinates; pre-existing zero-sized custom-pad warnings remain and prevent promotion to full native authority. Baseline SHA256 unchanged: 16719c31de2d5f7048ff4dbf83cf03b36ea65d2c0489a235debb9b79e808b61a. Files retained under /root/work/signals on procurement-register. No reconstructed PCB or current connected-component calculation was created.
Five-seed / three-edge dispositions

Table


Unique seedRequired resultStatus
DC_BUS source 5c3b74f8-9353-4f1d-bf07-ebd0a5b0d216All active connected copper/vias/custom copper and all attached terminalsFAILED/BLOCKED; complete net-owned inventory is not this component certificate.
R2:P1 (B2 destination/B6 source)Complete terminal membership,not presumed singletonFAILED/BLOCKED at unresolved terminal-world transform; no no-extra-load proof.
R1:P1 (B6 destination)Complete terminal membership/no downstream continuationFAILED/BLOCKED at same transform operand.
PGND source 116a0653-0535-48ab-86e4-fd3f6773df7cComplete source-island membership and multilayer geometryFAILED/BLOCKED; computed-active graph/terminal enumeration incomplete; not labeled bleeder-only.
R1:P2 (P9 destination)Complete terminal membership/no onward main returnFAILED/BLOCKED at unresolved transform; no singleton certificate.
B2/B6/P9 all remain membership-ineligible pending evidence. Their A2 three-edge tree is only topology-conditioned: source→B2→R2:P1→B6→R1:P1 and PGND source→P9→R1:P2. A main-current-capable source is not itself disqualifying; the downstream cut-edge membership must exclude other loads. B2 must include planned B6 bleeder+divider sharing. R1 tolerance remains missing; all A2 arithmetic/noise/current/surge holds retained. P10/J1→R4 main-return sharing remains excluded. No new0.30mm scope or clearance exception is proposed/applied here.
Specific next operand: authoritative current world-space terminal copper polygons/matrices (with Bottom hierarchy convention and exact pad-to-terminal mapping) for these controls, or an authoritative current seed→physical-component/all-terminal response. Once resolved, finish the remaining computed-active/pad inventory and perform layer-envelope intersections,barrel adjacency,connected components and all-terminal/cut-edge proof. M2 did not execute that graph phase; continuing paging alone would not resolve the demonstrated terminal-attribution ambiguity.
Scope manifest and severity
Completed: broader native inventory,computed DC_BUS completeness,two resistor controls plus C45,retained historical control,executable evidence assets,M2 report and analysis/ledger linkage. Failed: requested complete reconstruction/five membership certificates and B2/B6/P9 no-additional-through-current qualification. Unattempted after the transform stop: graph intersections/connected-component calculation,remaining computed paging,all singleton/terminal tables,hardware/routing/approval/parts/placement/rules/net/firmware edits and release. Zero hardware mutations,zero router calls,zero shared-todo changes. Documents and three non-board assets only; no C7/history reopening or protection redesign. Computer reused only for controls and evidence files,then stopped at closeout.
Fresh routing-state status control remains40/178/70; no current pours. The selected R2 overlapping-copper review at2026-10-23T17:32:36.118Z returned no matching checks; not a geometry/membership or global clearance certificate. Inherited airwire/HS Errors remain wrong/unresolved; native width Warnings and intentional terminal mapping Info are neither repaired nor waived. Transform uncertainty is a qualification blocker,not newly classified as a physical Error. All-owner clearance,current/transient/noise,isolation,safety,surge,provenance and fabrication/actuation holds unchanged. Assigned inspection/report closeout is separate from failed membership certification and overall incomplete PCB.

Historical M1 record — inventory bounds and stop rationale superseded by M2 above
Revision M1 — 2026-10-23, bounded inspection only
Result: no physical-island terminal-membership certificate established for B2, B6 or P9. All three remain BLOCKED for membership-based width eligibility. This is a failed qualification deliverable, not a discovered short, proof that the proposed leaves are impossible, or permission to route. The current resistor pad mappings and retained seed geometry are verified below; singleton/bare-pad status and complete source-island terminal lists are not verified. No eligible candidate is asserted.
Completed: authoritative-query capability discovery, one bounded native fallback, complete DC_BUS net-descendant inventory, exact R1/R2 pad/terminal mappings, selected retained-seed readbacks, current routing-state read, this report and linkage. Failed/blocked: complete all-attached-terminal/copper enumeration for each physical island and no-additional-through-current proof. Unattempted: broad graph reconstruction, new exports/imports/rebuilds, copper/rules/width approval/parts/placement/net/firmware changes, measurements and release. Shared todos untouched. Zero hardware mutations.
This report supplements Branch Current and Transient Return Analysis, revision A2 and PCB Completion Repair Ledger. A2 current calculations and review7v acceptance remain unchanged. Membership and clearance are distinct: the exhaustive all-owner clearance hold remains even if membership is later certified.
1. Native API evidence and bounds
All inspections used current project state on 2026-10-23, omitted historical version_id; no single frozen historical-version certificate is claimed. Tool capability discovery searched inspect for physical copper connectivity/island/terminal graph. The advertised operations expose schematic get_nets, structural get_nodes/get_layout, routing_state and computed-copper summaries, not an operation or request mode returning a seed copper's physical connected-component ID, adjacency edges and exhaustive attached terminal list. No undocumented request mode was invented or sent. This establishes an exposed-schema limitation, not that the internal engine lacks a graph.

Table


ControlExact query scopeEvidence and completeness
Q1get_layout(mode=routing_state,includeComputedCopper=true)Complete items1–120/120:40 airwires,178 redundant items/70 groups. The three requested endpoint pairs remain. Computed copper reports imported fixed pieces and no current pours; it does not map those pieces to physical-island terminals. Redundancy groups are not complete physical-island memberships.
Q2get_layout(tree,designators=[R1,R2,R3,R4],compact=true,rules=computed)Complete4 elements; only component records returned, not all descendant pads. Establishes R1 Bottom(-60,40),180°;R2 Bottom(-60,44),0°.
Q3get_nodes(tree,rootUid=R1 component,compact=true,rules=computed,limit=30,offset=0)Complete11 nodes including two active terminal-bound rectangular pads. Complete for this component's returned subtree, not every copper owner touching its pads.
Q4get_nodes(tree,rootUid=R2 component,nodeTypeFilter=[pad],compact=true,rules=computed,limit=10,offset=0)Complete2 pads. Same limitation: complete component-pad list is not complete physical-island membership.
Q5get_nets(components=[R1 UID,R2 UID],nets=null,pins=null)Complete3 filtered nets,only terminals of those two components. PGND showing1 pin and DC_BUS showing2 pins are filtered results,NOT net-wide or island-wide terminal counts.
Q6get_nodes(tree,rootUid=DC_BUS UID,compact=true,rules=none,limit=160,offset=0)Complete131/131 net-descendant nodes,including root,ordinary/custom traces,16 SmartVia parents and16 physical children. This structural tree excludes component-owned pads. The prior130-descendant inventory excluded the root; this is not evidence of a new route. Input active:false entries remain present; missing input active is not a fresh computed-active certificate.
Q7get_layout(tree,filter_net={nets:[DC_BUS,PGND]},nodeTypeFilter=[pad],compact=true,rules=computed,limit=20,offset=0)total507,showing20,offset0. Only first20 inspected; footer says page read complete,not all507. Returned opposite-net P1 pads prove filter_net selects components sharing nets,not an exact pad effective-net or physical-island filter. World coordinates are not flattened: computed.position is parent-local.
Q8get_nodes(tree,rootUid=PGND UID,nodeTypeFilter=[routeSegment,smartVia,via,polygon,fill,zone],compact=true,rules=none,limit=25,offset=0)total973,showing25,offset0; first25 only. Different node-type/root scope from prior845 inventory; counts are not equated. No physical adjacency/island/terminal-membership field returned. This is NOT a complete PGND reconstruction.
Q9get_nodes(tree,rootUid=116a0653 / f903e454 / 5c3b74f8 separately,compact=true,rules=computed)Each1/1: selected traces active,correct effective net,geometry below. These controls do not enumerate all adjacent nodes.
No failed regional clearance query was repeated. No semantic search, SVG label, schematic net list or airwire representative was substituted for current physical connectivity. Existing saved export evidence was not regenerated or promoted to authority: A2 records custom-pad omissions, Bottom annotation disagreement and inactive-artifact rendering limitations. Computer stayed untouched.
Exact missing evidence — stop condition
The needed authoritative response is: for a seed pad/trace at current revision, all physical connected copper UIDs, each active layer envelope and via barrel connection, all bound terminal UIDs/designators/pin names/net IDs, and a completeness guarantee. None of Q1–Q9 returns that object. Structural native data is pageable and could support a larger reconstruction; it is not asserted inaccessible. However this bounded pass did not collect all507 component-selected pads, all973 PGND nodes, their parent transforms and every relevant active custom shape, nor compute intersection-complete connected components. Thus absence of another attachment cannot be proven. Parent-local Bottom coordinate conventions and custom traceShape transforms require explicit native controls, not a guessed global mirror rule. Completing that broader reconstruction or obtaining a native connected-component response is the specific remaining operand; this report stops without inventing a certificate.
2. Verified terminal/pad identities — NOT exhaustive island terminal tables
Net aliases: D=DC_BUS e6edee68-b6fb-4578-94d0-81ad7f32dc91; G=PGND 6b7c99ee-6b73-4fc2-98a5-46d74e37a8a4; M=BUS_DIV_MID 3f285c41-d237-44d9-96b9-76c96ba57da7.

Table


Component:pinComplete terminal UID (component:pin)Physical pad UIDEffective netNative pad-local position/size,mmActive/layer
R1:P1506e056e-14f3-41ce-a222-e1fda7b84790:dff57d78-487b-f832-db06-4405c23ce37c506e056e-14f3-41ce-a222-e1fda7b84790__dff57d78-487b-f832-db06-4405c23ce37cD(-2.9625,0);1.225×3.35true/Bottom
R1:P2506e056e-14f3-41ce-a222-e1fda7b84790:880f28ef-cf41-0acc-4a98-ce0afa37b0c2506e056e-14f3-41ce-a222-e1fda7b84790__880f28ef-cf41-0acc-4a98-ce0afa37b0c2G(+2.9625,0);1.225×3.35true/Bottom
R2:P136090f69-05a1-4b2d-b330-e1529ea43d90:dff57d78-487b-f832-db06-4405c23ce37c36090f69-05a1-4b2d-b330-e1529ea43d90__dff57d78-487b-f832-db06-4405c23ce37cD(-1.4625,0);1.125×1.75true/Bottom
R2:P236090f69-05a1-4b2d-b330-e1529ea43d90:880f28ef-cf41-0acc-4a98-ce0afa37b0c236090f69-05a1-4b2d-b330-e1529ea43d90__880f28ef-cf41-0acc-4a98-ce0afa37b0c2M(+1.4625,0);1.125×1.75true/Bottom
These are all returned pads of R1 and R2, not a claim these are all terminals attached to their current copper islands. No trace passes electrically through a resistor as same-net copper: its opposite terminal is another graph boundary. R2:P2 is included to distinguish the divider circuit load from the same-net physical island around R2:P1. No board-world pad center is asserted from an unverified Bottom-label transform.
3. Retained seed/copper evidence

Table


Native UIDVerified current dataWhat it does NOT establish
5c3b74f8-9353-4f1d-bf07-ebd0a5b0d216active Top,D,2.5mm; world(-59.69,54)→(-59.69,52.75)All terminals/loads on B2 source island.
a5459f81-afcb-4f08-81ed-e635108a7e95Q6 source Top,D,2.5mm;(-59.69,52.75)→(-48.44,41.5),exact endpoint continuation from5c3b74f8Complete source-island membership; input-only inventory does not newly resolve all active states.
36ff56b3-2128-4f8a-b8bb-dddb252a2a23Q6 source Top,D,2.5mm;(-48.44,41.5)→(-46.5,41.5)No-other-load certificate.
31f9f377-d297-43f2-8377-42e6b98a5f36 and .throughHole.0-0Q6 SmartVia at(-46.5,41.5),physical0.60/0.30mm,Top/Mid1/Mid2/BottomAll attached pad terminals; not a qualified current rating.
116a0653-0535-48ab-86e4-fd3f6773df7cactive Bottom,G,1.5mm;native computed endpoints(+42.56,39.75)→(+38.81,36)No-other-load/bleeder-only certificate. These are native Bottom coordinates,not newly certified world coordinates; earlier controlled world interpretation is(-42.56,39.75)→(-38.81,36).
f903e454-f7b5-49f6-bf5e-fb1404d66f19active Top,G,1.5mm;world(-42.56,44.25)→(-42.56,39.75)A via/terminal-connected-component certificate at its endpoint.
0374aa2d-9cd2-46c4-9845-ee4e6de6d3e3Q8 source Top,G,1.5mm;(-52.31,54)→(-42.56,44.25);prior ledger confirms retained D1/input-return roleNo authority to classify the whole P9 source island as low-current or connect J1 through R4.
No active copper/via/custom-shape list for any entire candidate island is claimed complete. Q6 contains one DC_BUS custom traceShape neckdown-trace-customshape-e6edee68-b6fb-4578-94d0-81ad7f32dc91-4584150f-6e16-46a8-87f3-9bdcf7032797-1788835694930-58; its presence in the structural net inventory alone does not assign it to a particular physical source island. PGND custom-copper membership remains unenumerated. All attached terminal tables on source sides, and all possible additional terminals on pad sides, remain specifically missing.
4. Six candidate sides and disposition

Table


Candidate side / seedKnown attached terminal or copperComplete membership result
B2 source5c3b74f8Verified active D trace;source continuation aboveIncomplete; no complete attached-terminal list. May be a loaded main source; that alone would not disqualify a true downstream leaf.
B2 destinationR2:P1Verified terminal-bound active D padIncomplete; bare-pad/singleton versus additional loads is not certified.
B6 sourceR2:P1Same seed as B2 destination; no independent load countIncomplete; planned B2/B6 sharing must be evaluated together.
B6 destinationR1:P1Verified terminal-bound active D padIncomplete; singleton/no other continuation not certified.
P9 source116a0653Verified active G trace;retained input-return-related geometry existsIncomplete; source must not be labeled bleeder-only.
P9 destinationR1:P2Verified terminal-bound active G padIncomplete; singleton/no additional return continuation not certified.
B2: BLOCKED for membership-based eligibility; intended combined divider+bleeder feed remains only topology-conditioned. B6: BLOCKED; intended bleeder feed is not a certified leaf. P9: BLOCKED; a main-current-capable source island is permissible in principle, but the R1:P2 side must be proven a terminal leaf with no further return continuation. None is a qualified existing bridge or width approval.
5. Intended three-edge tree — hypothesis only
DC_BUS source island S_D -- B2 --> island T2(R2:P1)
                                  | resistor R2→R3→R4 divider load
                                  +-- B6 --> island T1(R1:P1)
                                               | R1 bleeder
PGND source island S_G -- P9 --> island G1(R1:P2)
T2,T1,G1 are conceptual seed labels,not certified native island IDs. R1 is a resistor between nets,not a same-net copper short. If T2 contains only the divider input and B6 feed,T1 contains only R1:P1,and G1 only R1:P2,then B6/P9 carry bleeder current and B2 carries divider+bleeder. High source-island current need not traverse those leaves. Conversely, any additional terminal/path continuing beyond these pads could turn a proposed leaf into a loaded-island bridge; the current assignment then changes. Current airwires prove disconnection of selected representatives,not their complete terminal sets. No unintended parallel return or loop is proven present or absent by this pass.
B2 aggregate must include planned B6: at60V,R1 nominal0.600mA plus divider maximum286.000µA steady/ideal initial300.300µA; R1 tolerance missing prevents a guaranteed aggregate maximum. Full conditions/equations remain A2; no recalculation or new current guarantee here. P10 and J1:2→R4:P2 mainreturn sharing are excluded: no R4 main-return shortcut or width proposal.
6. Verification and finite closeout
Q1 complete native routing_state verifies all40 opens remain,178 redundant items/70 groups; its computed-copper section reports no current pours. No new native DRC was required for a zero-hardware inspection/document pass; inherited HS via-in-pad Error and all A2 dynamic/current/noise/clearance/surge/provenance/release holds remain unchanged,not newly requalified. No cleanup/deletion authority follows from redundancy groups.
Needed for independent acceptance: an authoritative physical-component membership response for the five unique seeds (S_D,T2,T1,S_G,G1),or a complete current native geometry reconstruction with exact active filters,parent transforms,custom copper,layer intersections/via barrels and terminal mapping,followed by explicit all-terminal tables and cut-edge/no-through-current proof for B2/B6/P9. That deliverable is not produced by this bounded pass. Stop here; no width approval,construction,fabrication,energization or actuation authorization.
  • Revision M2-S — support closes mapping hold, 2026-11-03

  • Historical M2 record — mapping blocker superseded by M2-S support evidence above

  • Revision M2 — native-reconstruction fallback stopped at a demonstrated transform conflict, 2026-10-23

  • M2 coverage — distinguish complete inventories from incomplete reconstruction

  • Reproducible actual blocker — current Bottom terminal world polygons unresolved

  • Preserved executable evidence

  • Five-seed / three-edge dispositions

  • Scope manifest and severity

  • Historical M1 record — inventory bounds and stop rationale superseded by M2 above

  • Revision M1 — 2026-10-23, bounded inspection only

  • 1. Native API evidence and bounds

  • Exact missing evidence — stop condition

  • 2. Verified terminal/pad identities — NOT exhaustive island terminal tables

  • 3. Retained seed/copper evidence

  • 4. Six candidate sides and disposition

  • 5. Intended three-edge tree — hypothesis only

  • 6. Verification and finite closeout