EV Charger Schematic Review


已开始处理你的请求,但现在账户没有可用 ACUs,AI 功能暂时不可用,所以我不能继续调用工具完成修改。
目前本轮已完成:
  • 读取并理解任务:按顺序整理这些 sheet,并加入 K_CHG / K_DIS 硬件互锁后重新 ERC。
  • 检查了当前 K_CHG / K_DIS 线圈驱动相关连接:
    • 两个接触器线圈目前都直接由 24V_RELAY_AFTER_ESTOP 供电;
    • K_CHG_COIL_LOW 和 K_DIS_COIL_LOW 分别由 Q1/Q2 低边 NMOS 驱动;
    • 目前尚未加入真正的硬件互锁触点。
  • 确认当前 schematic 视觉整理还没有实际完成;上一条进度里“cleanup completed”不代表已经完成可视排版。
还需要继续做:
  • 添加 K_CHG / K_DIS 硬件互锁,建议用对方的 NC 辅助触点串入本接触器线圈供电路径:
    • 24V_RELAY_AFTER_ESTOP -> K_DIS_NC_INTERLOCK -> K_CHG coil
    • 24V_RELAY_AFTER_ESTOP -> K_CHG_NC_INTERLOCK -> K_DIS coil
  • 按顺序渲染/展示:
    1. CP_GENERATION_AND_MONITOR
    2. CC_PP_RC_R4_AND_DISCHARGE_IDENTIFICATION
    3. CHARGE_AND_DISCHARGE_CONTACTOR_CONTROL
    4. AC_MAIN_PATH_AND_BIDIRECTIONAL_MEASUREMENT
    5. POWER_MCU_COMMUNICATION
  • 重新运行 ERC,并修复或记录剩余 unresolved items。
I can’t run analysis, auto-placement, or routing right now because the account has no available ACUs, so AI execution features are unavailable.
What was accomplished so far in this session:
  • The EV charge controller/test board was refined into a review-stage logical schematic.
  • The pilot architecture was corrected to use PILOT_OUT, with CP/CC/PP interpretation notes updated.
  • R1_CP was defined as the mandatory 1.000 kΩ, 0.1%, 0.5 W GB/T control-guide equivalent series resistor, with CP monitoring on the CP_OUT side.
  • Discharge-identification branches and full-board schematic notes were added.
  • A later request to clean schematic sheets and add K_CHG/K_DIS hardware interlock was started conceptually but not completed due to ACU limits.
What remains to be done:
  • Inspect current PCB state to determine whether placement, routing, or both are needed.
  • If placement is incomplete, run auto-layout/component placement.
  • If placement is usable but airwires remain, run routing.
  • Apply the resulting layout/routing changes automatically.
  • Run board checks/DRC afterward.
  • Keep this project marked REVIEW REQUIRED for HV, relay pinout, creepage/clearance, thermal, EMC, protection, and manufacturing readiness.
Manual PCB checklist
Check placement status
Find unrouted nets
Verify HV clearance
Review BOM risks

Waiting for input


Schematic of EV Charge Controller Test Board

EV Charge Controller Test Board

EV Charge Controller Test Board thumbnail