Revision status — 2026-09-08
J_MAIN is TE 6437288-3, an active 60-way right-angle SUPERSEAL 1.0 header. Its installed footprint was read back pad-by-pad before remapping. The current assignment uses compact staggered 2-row × 3-contact clusters: VBAT_RAW on cavities 14–16 and 28–30, and GND on cavities 42–44 and 58–60. The VBAT cluster is on the connector end nearest the placed power-entry block; its inner two rows also face toward C_IN_PROT and the protected-input circuitry.
Low-current power and inputs occupy 1–8, ABS functions occupy 17–27, ATTESA/A-LSD functions occupy 31–35, and wheel-speed pairs occupy 45–52 with each +/- pair adjacent and polarity preserved. Cavities 9–13, 36–41, and 53–57 are explicit no-connect spares.
The header mates with TE 3-1437290-7 (26-way) and 4-1437290-0 (34-way), key code 1 upper-lock. It is placed top-side at the right edge, 90°, centered at (103.90 mm, 0 mm) with its mating face approximately 1 mm inside the board edge.
Current qualification uses the actual operating profile: the 30 A fast-blow fuse is fault protection, actuator loads are pulsed, ABS normally releases one or two wheels at a time, and AWD operation is mutually exclusive with ABS. Production validation must still confirm firmware exclusion, duty-cycle limits, connector temperature rise, fuse coordination and current sharing.
Current 60-way cavity map

Table


Cav.Net / statusFunction
1IGN_SW_12V_RAWSwitched ignition sense
25V_SENSOR_REGSensor 5 V supply
35V_PRESSURE_FUSEDFused pressure-sensor 5 V
4STEER_ST_A_5V_TCU24Steering A
5STEER_ST_B_5V_TCU27Steering B
6STEER_ST_Z_5V_TCU28Steering Z/index
7BRAKE_SW_RAWBrake switch input
8HB_DISABLE_RAW_CAV25Handbrake/controller-disable input
9–13NC / spareExplicit no-connect
14–16VBAT_RAWPermanent battery contacts 1–3 of 6
17ABS_FR_IN_OEM101ABS front-right inlet
18ABS_FL_IN_OEM102ABS front-left inlet
19ABS_RL_IN_OEM104ABS rear-left inlet
20ABS_RR_INABS rear-right inlet
21ABS_FR_OUT_OEM105ABS front-right outlet
22ABS_FL_OUT_OEM106ABS front-left outlet
23ABS_RL_OUT_OEM110ABS rear-left outlet
24ABS_RR_OUTABS rear-right outlet
25ABS_MAIN_ACTUATOR_RELAYABS main/actuator relay
26ABS_MOTOR_RELAYABS motor relay
27ABS_WARNINGABS warning output
28–30VBAT_RAWPermanent battery contacts 4–6 of 6
31ATTESA_MAIN_SOLATTESA main solenoid
32ATTESA_PUMP_RELAYATTESA pump relay
33ATTESA_FAILSAFE_SOLATTESA failsafe solenoid
34ALSD_SOLENOIDA-LSD solenoid
354WD_WARNINGAWD warning output
36–41NC / spareExplicit no-connect
42–44GNDController/chassis-reference contacts 1–3 of 6
45WHEEL_FL+Front-left wheel +
46WHEEL_FL-Front-left wheel −
47WHEEL_FR+Front-right wheel +
48WHEEL_FR-Front-right wheel −
49WHEEL_RL+Rear-left wheel +
50WHEEL_RL-Rear-left wheel −
51WHEEL_RR+Rear-right wheel +
52WHEEL_RR-Rear-right wheel −
53–57NC / spareExplicit no-connect
58–60GNDController/chassis-reference contacts 4–6 of 6
Historical 44-way mapping
J_MAIN was reassigned to group the two physical rows by paired cavity columns: VBAT_RAW is now on cavities 1/23, 2/24 and 3/25; GND is now on cavities 4/26, 5/27 and 6/28. The low-current switched input remains IGN_SW_12V_RAW on cavity 13. Displaced low-current nets were moved into the freed cavities 7–12; high-current outputs 33–43 were not remapped.
The exact TE Connectivity 5-6447223-7 44-way right-angle upper-lock SUPERSEAL 1.0 header has been created, verified, published, added as J_MAIN, and connected in parallel with the live legacy main connectors. The reusable part is TE 5-6447223-7.
The controlled Corsa/TE drawing was available, but no exact manufacturer/Corsa STEP or other controlled 3D CAD for this exact MPN was directly downloadable. Per the migration stop condition, J_POWER and J_IO have not been removed, J_MAIN has not been finally placed, and the LED/left-edge placement has not been changed. J_SPARE remains untouched.
Authoritative identity

Table


ItemIdentity
PCB headerTE Connectivity 5-6447223-7; Corsa SS10-44P
ConfigurationSUPERSEAL 1.0, 44-way, right-angle, upper-lock, through-hole
SupersedesRestricted TE 5-1447223-7
Mating housingTE 1376886-1; Corsa SS10-44S
Controlled drawingC-1376885 Rev A
Product specification108-78176-2
Verified footprint datum and geometry
Datum O is the midpoint between the two mounting-hole centres and the midpoint between the terminal rows.

Table


FeatureImplemented value
Contact array2 rows × 22 columns
Pins 1–22y = -1.5 mm, x = -36.75 ... +36.75 mm
Pins 23–44y = +1.5 mm, x = -36.75 ... +36.75 mm
Column pitch3.5 mm
First-to-last span73.5 mm
Contact drills44 × plated Ø1.3 mm
Copper lands2.4 mm; pin 1 rectangular, remaining contacts circular
Mounting holes2 × non-plated Ø3.3 mm at x = ±43.5 mm, y = 0
Mounting-hole span87 mm
Pin 1Distinct rectangular land and silkscreen marker
PCB pattern viewControlled mounting-side orientation; not mirrored
Exact 3D modelNot available; no approximate model attached
The drawing does not provide an unambiguous closed housing Y-envelope/board-edge datum tied to the footprint, so final edge seating and lock/mating-direction validation remain blocked without the exact STEP/CAD.
Staged final cavity assignment
All 44 cavities are intentionally used. Six permanent-battery and six ground cavities maximize the available current capacity; there are no unused cavities to mark NC.

Table


Cav.NetFunction
1VBAT_RAWPermanent +12 V contact 1 of 6
2VBAT_RAWPermanent +12 V contact 2 of 6
3VBAT_RAWPermanent +12 V contact 3 of 6
4GNDController/chassis-reference contact 1 of 6
5GNDController/chassis-reference contact 2 of 6
6GNDController/chassis-reference contact 3 of 6
75V_SENSOR_REGSensor 5 V supply; moved from cavity 23
8WHEEL_FL+Front-left wheel +; moved from cavity 24
9WHEEL_FL-Front-left wheel −; moved from cavity 25
10WHEEL_FR+Front-right wheel +; moved from cavity 26
11WHEEL_FR-Front-right wheel −; moved from cavity 27
12WHEEL_RL+Rear-left wheel +; moved from cavity 28
13IGN_SW_12V_RAWSwitched +12 V ignition/enable sense
14STEER_ST_A_5V_TCU24Steering A
15STEER_ST_B_5V_TCU27Steering B
16STEER_ST_Z_5V_TCU28Steering Z/index
17TPS_RAWTPS input
18BRAKE_SW_RAWBrake input
19HB_DISABLE_RAW_CAV25Handbrake/controller-disable input
20REVERSE_LAMP_RAWReverse input
21ATTESA_PRESSURE_RAWATTESA pressure signal
225V_PRESSURE_FUSEDPressure-sensor fused +5 V
23VBAT_RAWPermanent +12 V contact 4 of 6
24VBAT_RAWPermanent +12 V contact 5 of 6
25VBAT_RAWPermanent +12 V contact 6 of 6
26GNDController/chassis-reference contact 4 of 6
27GNDController/chassis-reference contact 5 of 6
28GNDController/chassis-reference contact 6 of 6
29WHEEL_RL-Rear-left wheel −
30WHEEL_RR+Rear-right wheel +
31WHEEL_RR-Rear-right wheel −
32TACH_RAWRPM/tach input
33ATTESA_MAIN_SOLATTESA main-solenoid output
34ATTESA_FAILSAFE_SOLATTESA failsafe-solenoid output
35ATTESA_PUMP_RELAYATTESA pump-relay output
36ALSD_SOLENOIDA-LSD solenoid output
374WD_WARNING4WD warning output
38ABS_FR_IN_OEM101ABS front-right IN
39ABS_FL_IN_OEM102ABS front-left IN
40ABS_FR_OUT_OEM105ABS front-right OUT
41ABS_FL_OUT_OEM106ABS front-left OUT
42ABS_REAR_IN_OEM104ABS rear IN
43ABS_REAR_OUT_OEM110ABS rear OUT
44ABS_WARNINGABS warning output
Actuator load-return topology — authoritative harness requirement
All BTS actuator channels are implemented as high-side outputs. The external harness must complete each load circuit as follows:

Text


Battery +
  -> J_MAIN cavities 14–16 and 28–30 (parallel VBAT_RAW feed)
  -> PCB protection, shunt and actuator disconnect
  -> BTS high-side output
  -> J_MAIN actuator-output cavity
  -> external solenoid coil
  -> qualified chassis/battery-negative splice or ground stud
  -> Battery −
The solenoid return conductor must not loop back through the PCB, a BTS GND pin, the Mid-Layer-1 ground backbone, or J_MAIN cavities 42–44/58–60 before reaching battery negative.
Output and return pairing

Table


J_MAIN outputLoad-side harness destinationRequired return
31 ATTESA_MAIN_SOLATTESA main-solenoid positive terminalOther coil terminal directly to qualified chassis/battery-negative return
33 ATTESA_FAILSAFE_SOLATTESA failsafe-solenoid positive terminalOther coil terminal directly to qualified chassis/battery-negative return
32 ATTESA_PUMP_RELAYPump-relay coil positive/control terminalOther relay-coil terminal directly to qualified chassis/battery-negative return
34 ALSD_SOLENOIDA-LSD solenoid positive terminalOther coil terminal directly to qualified chassis/battery-negative return
17–24 ABS valve outputsCorresponding ABS inlet/outlet coil positive terminalOther coil terminal directly to the OEM hydraulic-unit ground return or qualified chassis/battery-negative splice
All four ABS channels follow the same high-side/output-plus-direct-external-return topology.
Role of J_MAIN ground cavities 42–44 and 58–60
  • Cavities 42–44 and 58–60 provide controller power ground, sensor/diagnostic reference, surge-return support, and redundant chassis-reference continuity.
  • They do not carry the normal aggregate solenoid current when the harness is built to this map.
  • The PCB's 3.5 mm Mid-Layer-1 GND backbone and its two six-via transition clusters equalize controller ground and reinforce the connector ground collector; they are not qualified for 15–30 A continuous actuator return.
  • BTS GND pins carry device bias and diagnostic current only. Their narrow package escapes are intentional and must never be used as solenoid-return paths.
External return-network requirements
  1. Use an OEM-qualified hydraulic-unit ground point or a dedicated low-impedance battery-negative/chassis stud.
  2. Size each solenoid-return conductor for its individual 5 A design-channel current and the applicable automotive temperature/voltage-drop requirement.
  3. Size shared splices and trunk conductors for the firmware-limited simultaneous-duty envelope, currently 15 A long-term average and 25 A short-duration aggregate, with staggered PWM edges.
  4. Keep the load-return splice physically separate from wheel-sensor, pressure-sensor, and controller-reference splices until the designated chassis/battery star point.
  5. Document ground-stud material, coating removal, fastener torque, corrosion protection, conductor gauge, crimp tooling and maximum permitted millivolt drop.
  6. Validate the assembled harness by measuring voltage drop from every energized solenoid return to battery negative and by confirming that negligible actuator current flows in J_MAIN cavities 42–44/58–60.
Current allocation
TE 108-78176-2 allowable current per contact with at least 0.85 mm² wire:

Table


AmbientAll positions activeSix contacts per polarityMargin versus 20 A
60 °C7 A/contact42 A+110%
80 °C6 A/contact36 A+80%
100 °C5 A/contact30 A+50%
125 °C3 A/contact18 A−10%
The six VBAT_RAW contacts must carry the aggregate actuator supply current and conservatively support the 20 A target with margin through 100 °C under the all-positions-active table. They do not support 20 A at 125 °C. Production release therefore requires a qualified connector-region ambient limit below 125 °C, current derating/limiting above 100 °C, or TE-supported application-specific thermal qualification.
The six positive-feed wires and PCB entry paths must be equal and symmetric in conductor area, insulation, crimp process, practical length, via count and copper geometry. Cavities 42–44 and 58–60 are a separately paralleled controller-ground group and are not required to mirror the actuator positive current when solenoid returns bypass the PCB as specified above.
Retained connector and placement status
  • J_SPARE: TE 6473423-1, 26-way protected spare-I/O connector, retained unchanged on the left edge.
  • J_POWER and J_IO: retained until exact CAD permits final body/edge/lock verification and J_MAIN is placed and checked.
  • LED_CASE_ABS and R_CASE_ABS: unchanged; final move to the left short edge is blocked by the same placement-validation gate.
  • Board stackup remains the existing custom four-layer stackup, measured at 1.55 mm in the live layout (nominal 1.57/1.6 mm class).
Verification evidence
Harness validation checklist
Complete this checklist on the first production-intent harness and repeat it after any connector, terminal, wire-gauge, splice, ground-stud, or hydraulic-unit change.
A. Documentation and visual inspection
  • Harness drawing shows every actuator as BTS output -> solenoid -> chassis/battery negative; no solenoid return is routed through the PCB.
  • J_MAIN cavities 42–44 and 58–60 are labelled controller/chassis reference only, not actuator load returns.
  • Every ABS, ATTESA, A-LSD, and pump-relay output cavity is paired with a documented external return conductor and ground endpoint.
  • Optional RR inlet/outlet outputs follow the same direct external-return topology.
  • Return-splice locations, wire gauges, wire lengths, insulation ratings, terminal part numbers, seals, and crimp tooling are recorded.
  • The actuator-return splice is separate from wheel-speed, pressure-sensor, and controller-reference splices until the defined chassis/battery star point.
  • Ground-stud material, coating-removal process, fastener/washer stack, tightening torque, corrosion protection, and service instructions are recorded.
  • No load-return conductor relies on enclosure screws, PCB mounting hardware, cable shields, or connector shells.
B. Continuity and topology checks — power disconnected
  • Measure continuity from each solenoid return terminal to the designated chassis/battery-negative point.
  • Verify there is no series path through J_MAIN cavities 42–44 and 58–60, the PCB inner backbone, or any BTS GND pin.
  • Verify each actuator output is isolated from ground when its external load is disconnected.
  • Verify J_MAIN cavities 42–44 and 58–60 are mutually common and connected to controller ground.
  • Verify no unintended continuity exists between actuator outputs.
  • Record point-to-point resistance for every load return using a four-wire milliohm method where available.
Pass criteria: no incorrect topology; each individual return path should be below the project-specific resistance limit derived from the allowed voltage drop. Use 20 mΩ maximum per completed solenoid return path as an interim screening limit until actual harness lengths and wire gauges are frozen.
C. Crimp and mechanical validation
  • Verify terminal and seal part numbers against the selected wire gauge and insulation diameter.
  • Perform conductor and insulation crimp-height measurements using the terminal-manufacturer specification.
  • Perform pull-force tests on representative crimps from each wire-gauge/tooling combination.
  • Inspect conductor brush, bellmouth, insulation support, seal seating, terminal lock engagement, and cavity position.
  • Confirm all six paralleled J_MAIN positive contacts 14–16/28–30 use identical wire gauge, terminal plating, practical length, and splice geometry.
  • Confirm cavities 42–44/58–60 use identical controller-ground conductors where current sharing is required.
D. Solenoid-return voltage-drop test
Test with the assembled harness at battery minimum, nominal, and charging voltage where safe. Use actual loads or representative automotive dummy loads.
  • Energize each actuator channel individually at its maximum commanded current.
  • Measure voltage from the solenoid return terminal to battery negative.
  • Measure the complete load-loop drop from protected supply output to battery negative, separating output-driver, positive harness, coil, and return-path contributions.
  • Repeat with the harness and ground stud heat-soaked to the maximum qualified ambient.
  • Repeat after connector mate/unmate durability and vibration testing.
Pass criteria:
  • Individual return drop: ≤100 mV at 5 A from solenoid return terminal to battery negative.
  • Preferred production target: ≤50 mV at 5 A.
  • No intermittent excursions, waveform steps, or duty-dependent discontinuities.
E. Simultaneous-duty test
  • Test the 15 A long-term-average design case.
  • Test the 25 A short-duration aggregate case using the planned PWM frequency, phasing, and duty limits.
  • Verify PWM edges are staggered and that unrestricted 40–50 A aligned activation is prevented by firmware.
  • Monitor battery voltage, protected actuator voltage, every active load current, ground-stud voltage, connector temperature, splice temperature, and representative wire temperature.
  • Confirm actuator operation does not disturb wheel-speed, pressure, MCU reset, watchdog, or diagnostic signals.
Pass criteria: no connector or splice hot spot, no insulation-temperature exceedance, no controller reset or false diagnostic, and voltage drops remain inside the allocated load budget.
F. J_MAIN contact-current sharing
Use DC current clamps suitable for individual conductors, calibrated shunts, or equal-length millivolt measurements.
  • Measure current in each of the six VBAT_RAW conductors during the 15 A and 25 A aggregate tests.
  • If cavities 42–44/58–60 carry measurable shared controller current, measure each ground conductor as well.
  • Compare current distribution before and after heat soak and connector durability testing.
  • Investigate any conductor with rising current as the assembly heats, which may indicate unequal crimp/contact resistance.
Pass criteria:
  • No contact exceeds the TE temperature-derated per-contact limit.
  • Each positive-feed conductor remains within ±20% of the six-conductor average.
  • No single contact carries more than 120% of average for longer than a transient measurement interval.
  • A failed/open contact must not overload the remaining five contacts beyond their derated limits; otherwise firmware must detect and reduce current.
G. PCB-ground bypass confirmation
  • Place a current probe on the J_MAIN cavities 42–44 and 58–60 ground bundle while actuator channels operate.
  • Confirm the measured current consists only of controller, diagnostic, sensor, and transient-suppression current—not solenoid load current.
  • Measure current through the PCB inner-ground backbone or its transition cluster if practical.
  • Confirm the BTS package-ground traces remain low-current logic/diagnostic paths.
Pass criteria: actuator switching must not cause sustained load-scale current in cavities 42–44/58–60 or the 3.5 mm inner-layer backbone. Any multi-ampere sustained reading indicates an incorrect harness return topology.
H. Fault and service tests
  • Open each parallel positive-feed contact individually and verify remaining-contact temperatures and current sharing.
  • Introduce a high-resistance crimp/contact fault and confirm diagnostics or scheduled service testing can detect the resulting drop/heat.
  • Open the chassis-return stud connection and verify the system enters a safe state without seeking a return through sensor grounds, shields, or PCB logic ground.
  • Short each actuator output to chassis through the specified fault fixture and verify fuse/protection coordination.
  • Verify reverse-battery, jump-start, load-dump, and ground-offset tests do not damage the harness or redirect actuator current through low-current references.
I. Required validation record
  • Harness revision and serial number
  • PCB revision and firmware build
  • Connector, terminal, seal, wire, splice, and ground-hardware part numbers
  • Crimp-tool IDs and calibration dates
  • Ambient and component temperatures
  • Applied voltage, PWM frequency, phase, duty cycle, and test duration
  • Per-channel load current and return voltage drop
  • Per-contact current-sharing data
  • Thermal images or thermocouple logs
  • Pass/fail disposition, deviations, corrective actions, and approving engineer
Current 60-way verification evidence
  • Installed footprint read-back confirms 60 bound plated contact pads in four staggered rows plus three mechanical mounts.
  • Live net read-back confirms six VBAT_RAW contacts at 14–16/28–30, six GND contacts at 42–44/58–60, and all 32 pre-existing non-power external nets exactly once.
  • Wheel polarity and channel order are preserved at 45–52: FL+, FL-, FR+, FR-, RL+, RL-, RR+, RR-.
  • Explicit no-connect read-back confirms exactly 16 spare cavities: 9–13, 36–41, and 53–57.
  • Focused J_MAIN ERC found no open floating-pin, no-connect, driver-conflict, pin-to-pin, shorted-component, power-pin, single-pin-net, or undriven-net findings.
  • Connector placement, footprint, board outline, external-fuse architecture, and unrelated topology were not changed.
  • Revision status — 2026-09-08

  • Current 60-way cavity map

  • Historical 44-way mapping

  • Authoritative identity

  • Verified footprint datum and geometry

  • Staged final cavity assignment

  • Actuator load-return topology — authoritative harness requirement

  • Output and return pairing

  • Role of J_MAIN ground cavities 42–44 and 58–60

  • External return-network requirements

  • Current allocation

  • Retained connector and placement status

  • Verification evidence

  • Harness validation checklist

  • A. Documentation and visual inspection

  • B. Continuity and topology checks — power disconnected

  • C. Crimp and mechanical validation

  • D. Solenoid-return voltage-drop test

  • E. Simultaneous-duty test

  • F. J_MAIN contact-current sharing

  • G. PCB-ground bypass confirmation

  • H. Fault and service tests

  • I. Required validation record

  • Current 60-way verification evidence