Raspberry Pi Carrier Board Design


flux

Updated routing/placement plan before proceeding:
  1. Do not route yet. First close/accept layout-footprint status:
    • Ag59624-LPB footprint: validated structurally.
    • KMB210S footprint: pin mapping confirmed correct: 1=AC, 2=AC, 3=+, 4=-.
    • EEH-ZK1H471P footprint: conditionally valid pending size-code G confirmation.
    • TCST2103 footprint: pending pin-function confirmation before replacement.
  2. Layout setup
    • Use 4-layer stackup minimum.
    • Layer intent: Top signals/components, Inner1 solid GND reference, Inner2 power distribution, Bottom secondary signals.
    • Controlled impedance required for Ethernet: 100Ω differential.
    • USB 2.0 D+/D- should be treated as 90Ω differential if routed as high-speed.
  3. Placement order
    • Place fixed/mechanical connectors first: vertical RJ45, CM connector, CSI, USB, LiDAR JST-GH, motor JST-XH, tamper/debug/service headers.
    • Place PoE/isolation block next with 6.4mm isolation barrier preserved.
    • Place power converters and bulk caps near their loads.
    • Place CM support/debug/camera circuits.
    • Place TPM/RTC in digital low-noise area; no TPM SPI test pads.
    • Place TMC2209 X/Y drivers near motor connectors but away from CSI/Ethernet/TPM/RTC.
    • Place PAN/TILT optical home sensors according to mechanical homing geometry.
  4. Routing order
    • Power/grounds and star-point strategy first: GND_MOTOR / GND_DIGITAL star near buck input bulk; GND_PE_ISOLATED isolated except Y-cap.
    • Ethernet differential pairs next with 100Ω diff, continuous reference plane, pair matching.
    • USB 2.0 pair next.
    • CSI camera differential lanes next, length-aware and referenced to solid GND.
    • SPI TPM, I2C RTC/camera, UARTs, homing/tamper/debug GPIOs.
    • Motor outputs and +24V/+12V/+5V power traces last with adequate width/clearance, kept away from sensitive nets.
  5. Validation gates
    • After placement: run DRC/review and get your approval before routing.
    • Before routing: pre-route board check.
    • After routing: DRC/ERC, airwire check, impedance/clearance review, BOM/netlist regeneration.
I will not start placement or routing until you explicitly approve the next phase.
Approve placement phase
Close footprint blockers
Confirm capacitor package
Finish TCST mapping
Set layout constraints

Waiting for input


Schematic Capture Review Report
Scope
Schematic capture for the CM4/CM5 PoE Vision Signing Carrier was performed from the locked pre-schematic constraint documents. PCB layout, placement, and routing were not started.
Completed Schematic Blocks
  • POWER: PoE++ input placeholder, dual bridge rectifiers, Silvertel Ag59624-LPB placeholder, Y2 isolation capacitor, +24V_MOTOR bulk, TPS54331 +5V buck, TPS62160 +3V3 buck, and explicit GND_MOTOR/GND_DIGITAL star tie.
  • CM_CONNECTOR: CM1 200-pin CM4/CM5 symbol wired for +5V, grounds, GPIO reference, RUN_PG monitor, GLOBAL_EN reset, SERVICE_BOOT, wireless-disable straps, and all locked GPIO allocations.
  • ETHERNET: CM MDI pairs to MagJack placeholder, PoE extraction center-tap/VC pins to bridges, shield to GND_PE_ISOLATED, and LED resistors.
  • TPM_RTC: SLB9672 placeholder symbol wired as TPM, manual TPM_CS#, TPM_RST#, TPM_PIRQ#, SPI0, decoupling, DS3231SN I2C1, CR1220 backup, and INT/SQW no-connect.
  • MOTOR_DRIVERS: 3x TMC2209-LA drivers with STEP/DIR/EN, shared UART3 one-wire diagnostics, VREF dividers, sense resistors, charge-pump capacitors, local VM bulk, central motor bulk, JST-XH connectors, and populated motor TVS devices.
  • CAMERA: 22-pin CSI connector wired to CAM1 four-lane CSI, I2C0, camera GPIO, +3V3, and GND_DIGITAL.
  • SERVICE_IO: USB micro-B rpiboot port with USBLC6-2SC6 D+/D- ESD, VBUS sense-only pull-down/filter/TVS, UART0 debug header, tamper input conditioning, and reset/service controls.
ERC / Review Results
Electrical-only ERC checks were run for floating pins, no-connects, power pins, single-pin nets, and missing footprints. Result: zero ERROR/WARNING matches for the electrical checks after intentional no-connects were applied.
A full project review still reports many DRC airwires. These are expected because no PCB layout placement or routing has been started; they are not schematic-capture blockers.
Draft BOM Summary
Generated BOM summary contains 24 unique part groups and 116 total schematic instances. The BOM includes locked values and MPN annotations where available.
Exported Artifacts
  • Draft BOM export generated in multiple manufacturer formats, including Flux and PCBWay CSV.
  • IPC-D-356 netlist export generated for layout handoff.
Library Placeholder / Pre-Layout Replacement Notes
The following approved exact MPNs were not available as exact Flux library components during schematic capture and were represented by clearly annotated placeholders:

Table


DesignatorApproved MPNCurrent PlaceholderRequired Action Before Layout Release
UPOESilvertel Ag59624-LPB8-pin connector placeholderReplace with exact Ag59624-LPB symbol/footprint and verify pinout.
J_RJ45Bel Fuse V8BR-1AX1-GHSimilar Bel MagJack placeholderReplace with exact V8BR-1AX1-GH symbol/footprint and verify LED/power extraction pins.
U_TPMInfineon SLB9672SLB9670 library symbol with SLB9672 MPN annotationReplace with exact SLB9672 symbol/footprint if pinout differs; verify Infineon datasheet before release.
C24_BULKPanasonic EEH-ZA1H102PGeneric capacitor with MPN annotationReplace with exact footprint or verify generic capacitor footprint dimensions.
BR1 / D1SMC KMB210SMB210S-class Schottky bridge placeholder with KMB210S MPN annotationVerify exact KMB210S footprint/pinout before layout.
Missing-part requests were submitted for Silvertel Ag59624-LPB and Panasonic EEH-ZA1H102P.
Layout-Phase Items
  • Replace or verify all placeholder symbols/footprints listed above.
  • Establish 4-layer controlled-impedance stackup and Ethernet/CSI routing rules before placement/routing.
  • Place decoupling capacitors close to their respective IC pins.
  • Preserve 6.4mm PoE isolation creepage/clearance baseline.
  • Keep vertical RJ45 top-entry cable mechanical dependency visible during enclosure CAD.
  • Confirm coating/potting chemistry with PCBWay at quote time.
Stop Point
Schematic capture, ERC, draft BOM, and netlist export are ready for review. PCB placement/routing must not proceed until explicit layout approval is given.
  • Scope

  • Completed Schematic Blocks

  • ERC / Review Results

  • Draft BOM Summary

  • Exported Artifacts

  • Library Placeholder / Pre-Layout Replacement Notes

  • Layout-Phase Items

  • Stop Point