DC Board DRC Fixes


Find and remove any dangling trace stubs left after the cleanup.
I’ll run the dangling-trace check, delete the reported stub trace nodes in one batch, then rerun the dangling-trace check to confirm they’re gone.
Dangling trace cleanup is complete.
  • Found 31 dangling-trace warnings.
  • Deleted 60 trace stub nodes tied to those warnings.
  • Re-ran dangling-trace DRC at 2026-05-15 22:12:22 UTC.
  • Remaining dangling traces: 0
No schematic edits or connector moves were made.
Check the layout for unrouted nets after removing those stubs.
I’ll check the layout for unrouted nets by running the airwire DRC now, then I’ll report the current unrouted count and affected items without making routing changes.
Layout check found 33 unrouted airwire errors after the overlap and dangling-stub cleanup.
Current cleanup status:
  • Overlapping copper: cleared to 0
  • Dangling traces: cleared to 0
  • Unrouted nets / airwires: 33 errors remain
Next step is routing those remaining airwires, preferably in phases: power/ground first, then signals.
Route power/ground
List unrouted nets
Recheck after routing
Route short signals

Industrial Welding IoT Controller

Industrial Welding IoT Controller thumbnail