| Stage | Rail | Purpose | Notes |
|---|---|---|---|
| Input pads | 5 V nominal | External battery pack or adapter input | Large solder pads for heavier wiring. |
| PPTC fuse | 5 V protected path | Short/fault protection | 3 A hold target, verify trip/hold derating and resistance. |
| AO3401A P-FET | 5 V protected path | Reverse polarity protection | Low-drop reverse protection preferred over diode. |
| SMBJ5.0A | 5 V to GND | Transient/ESD clamp | Place near input after protection as appropriate for clamp strategy. |
| Bulk capacitor | 5 V to GND | LED surge stabilization | 1000 uF preferred, 470 uF minimum. |
| LED rings | 5 V | 32x SK6812RGBW-WS | Dominant load. Use pours/plane and distributed local bypassing. |
| TLV75733PDBVR | 3.3 V | ESP32 and 3.3 V logic | Include datasheet input/output capacitors. |
| 74AHCT125 | 5 V logic supply | LED data level shifting | Inputs driven from ESP32 GPIOs, outputs to LED DIN through 330 ohm resistors. |
Table
| Rail | Load | Estimate | Basis / Comment |
|---|---|---|---|
| 5 V | 32x RGBWW LEDs | 2.6 A peak target | User-specified worst-case LED load. Firmware brightness limiting recommended. |
| 5 V | 74AHCT125 | <10 mA typical | CMOS buffer load is small versus LEDs. |
| 3.3 V | ESP32-WROOM-32-N4 | 250 mA typical Wi-Fi active, 500-700 mA transient allowance | Use regulator and bulk/decoupling for Wi-Fi bursts. |
| 3.3 V | Pull-ups/control leakage | <5 mA | Boot/reset pullups and logic loads. |
Table
| Case | 5 V LED/logic | 3.3 V rail reflected through LDO | Total 5 V input estimate |
|---|---|---|---|
| Active typical | 0.5-1.5 A | 0.25 A | 0.75-1.75 A |
| Bright LED peak target | 2.6 A | 0.5 A transient allowance | 3.1 A transient |
| 3 A source budget | Firmware-limited | 0.3-0.5 A allowance | Limit LED current to keep total <=3 A |
(5 V - 3.3 V) * I_3V3.Table
| I_3V3 | Dissipation |
|---|---|
| 250 mA | 0.425 W |
| 500 mA transient | 0.85 W transient |
Summary
Power Tree
Load Estimate
Summed Current
Sizing Implications
LDO Thermal Check
Key Risks to Verify During Schematic/Layout