Check and finish the imported board
ARCHIVED / SUPERSEDED — 2026-10-22. Historical evidence only. Phase 6 is CLOSED (original SMD Pico retained; optional extra grounds are NOT blockers; antenna compromise accepted; no RF rework). Phase 7 is also closed. Resume/next-session instructions below are not active. Current status: Import Review and Plan — authoritative status.
import-review-and-plan and audited the live board. No schematic, PCB, net, placement, drill, rule or property changes were made. This preparation audit is not Phase 6 completion, routing completion or fabrication approval. Execution stopped when ACUs ran out, before updating the main plan or reading back this handoff.Table
| Item | Status | Evidence / blocker |
|---|---|---|
| Read latest plan and procedures | Completed | Phase 5 closed with deferrals; Phase 6 separately authorized. |
| Live routing and ground audit | Completed | 16 components, 18 nets; 85 × 75 mm two-layer board; 73 route segments, 24 smart vias, 91 pads; one persisted Polygon with generated Fill. |
| Research Pico 2 W antenna geometry | Completed as qualified proposal | Official datasheet establishes 14 × 9 mm cutout guidance; precise proposed offsets below come from an installed open-source footprint, not manufacturer tolerances. |
| Repair missing U1 ground terminals in place | Unattempted; blocked | No safe native operation was established for creating missing terminals and rebinding existing imported Mount pads while preserving identities and routes. Do not replace/rebuild U1 or route Mount pads without authorization. |
| Apply RF geometry / pour changes | Unattempted; approval required | No cutout, keepout, component move or copper change applied. |
| Update main plan and verify written report | Unattempted | ACUs exhausted. This separate handoff preserves findings without overwriting unread plan content. |
c0e7db64-469e-4d80-9f56-c3559d681d10, part UID b7ae219c-ee57-4ebe-aa68-4a42e3af2283, part version fc54f858-9b25-4708-a293-3515a8645b2a. Nine electrical terminals remain: GP0/1/2/4/5/6 (physical pins 1/2/4/6/7/9), GND3, 3V3_36, VSYS39. Other ground positions remain Mount pads with blank effective net IDs. /GND still has ten electrical pins and only one U1 terminal.Table
| Physical pin | X mm | Y mm |
|---|---|---|
| GND8 | 14.975 | 16.425 |
| GND13 | 14.975 | 3.725 |
| GND18 | 14.975 | -8.975 |
| GND23 | 34.355 | -8.975 |
| GND28 | 34.355 | 3.725 |
| GND38 | 34.355 | 29.125 |
| AGND33 | 34.355 | 16.425 |
commentFileId-fd3ca91f1109ba4f9ccb22a9c3b964a39c3d88423184fc7c8aa3506733eff98a
commentFileId-7972cf80cdaf9d7e5205ba79f9d28b27bad6370e50648f354fc06c6335a0a143
RaspberryPi_Pico_W_SMD_HandSolder.kicad_mod explicitly says it supports Pico 2 W. Package version 10.0.7~ubuntu24.04.1; SHA256 4f2a2baf753d79689a9f70675a8c42f6d0c6253296df0e2d202917b3d074e682. Public repository retrieval did not locate this installed file; use the exported source as the exact evidence, not a claim about repository HEAD./GND UID db4fc101-97ce-41ea-a68a-b18d44bf8b9b; Polygon UID 821340a4-4da0-41a5-8391-3be8a3819f85, with generated .fill child. Persisted rules show Bottom connected layer, 0.2 mm clearance; boundary spans x ±42, y ±37 mm. SVG shows copper covering the proposed antenna area.587ac117-fc20-472e-943f-1bb3241bb67f is at (35.675, 24.045) mm, generated suffix .imported-via-0.0-0. U1 pad36 centre is (34.355, 24.045) with 3.2 × 1.6 mm copper, right edge x35.955; via copper radius is 0.3 mm. A candidate x ≥36.455 provides 0.2 mm copper gap, with a short escape. Validate surrounding geometry and approval before committing; nothing moved.Table
| Net | Airwire endpoints |
|---|---|
| /5V | U4:+OUT → D3:A |
| /12V_SW (4) | Trace2951 → Trace a6c9; D2:A1 → Trace ac86; U4:+IN → Trace84be; U4:+IN → J3:Pin_2 |
| /GND | Trace7a38 → D2:A2 |
| /K1 (2) | Trace163e → J4:Pin_1; J4:Pin_2 → J4:Pin_1 |
| /K2 (2) | J5:Pin_2 → Trace c41a; J5:Pin_2 → J5:Pin_1 |
| /LI1 | U2:LI → J4:Pin_3 |
| /LI2 | J5:Pin_3 → U3:LI |
| /LO2 | U3:LO → U1:GP6 |
| /TX2 | U3:TX → U1:GP4 |
| /VSYS | D3:K → U1:VSYS |
/SW_IN, /12V_SW, /12V_SW, /GND. Actual owned connector/holder/resistor/capacitor/TVS fit remains unresolved from Phase 4; no guessed dimensions or drill edits were made.geometry-source was still running when execution stopped. Evidence files: /root/work/phase6/pico2w.pdf, pico2w.txt; /root/out/pico2w-page11.png, pico2w-page12.png, pico-w-source-footprint.kicad_mod. Stop the computer when safe. Internal feedback submission about missing-terminal repair capability failed; no ticket was filed.Session outcome
Assigned-scope status
Fresh read-only checks
Ground-mapping prerequisite
RF proposal — not applied
Existing ground copper
Via-in-pad proposal — not applied
Fifteen live airwires
Preservation and remaining work