Live switching between 5 V and 12 V
- During switching while powered, is a brief interruption acceptable?
- Or must the downstream load see little to no interruption?
Rail quality / sequencing
- Any hard constraints on:
- ripple,
- startup time,
- brownout tolerance,
- rail sequencing?
- If not, I can define conservative defaults in the spec.