Question only — do not route, do not change copper
This afternoon a new-chat leftover run still failed the L2/L7 lock: signal copper went back onto the ground planes and we reverted. Flux now says the block is resolved. I need a written answer before any leftover routing.
Ask (answer in writing, then STOP):
Before I continue: are L2 and L7 now a HARD, ENFORCED no-signal rule that the router cannot violate while it finishes the remaining ~135 nets? Yes or no — and what specifically changed on THIS board to make that true (a layer constraint, keepout, or routing rule the router now obeys)? I need the layers to stay solid ground; the last run put signal copper back on them.
Do not route nets. Do not edit traces, vias, fills, placement, or schematic. Do not start leftover work. Inspect rules/stackup only and answer YES/NO plus the concrete change on this board. If you cannot name the enforceable rule, say NO.