I updated Architecture and preliminary BOM with your approved decisions and the research-only scope; no schematic, layout or 3D was created. The BOM remains provisional: MPNs, LCSC stock, JLCPCB availability, footprints and datasheet ratings still need verification before your BOM approval.
I’ll verify the requested parts, footprints and supplier availability, with particular attention to relay motor ratings, mains insulation and default-OFF behavior. I’ll present the BOM for approval without drawing the schematic.
I found a suitable relay family with documented motor-load ratings and 8 mm coil-to-contact insulation, but its NC contact has a lower rating than NO. The requested IR receiver is listed at JLCPCB with zero stock; I’ll document that sourcing blocker and a verified alternative for your approval.
Research partially complete, interrupted by exhausted ACUs on 2026-10-22. Not a fully verified or approved BOM. No schematic, components, nets, footprints, placement or routing were added to the project. Library footprint existence was checked for several candidates; footprint geometry and pin mapping were not independently validated. Supplier stock is a lookup snapshot, not reserved inventory; LCSC stock does not prove JLCPCB assembly stock.
User approval gate remains: lock MPNs and footprints, present verified BOM, obtain approval, then schematic only. Do not treat approval of architecture as permission to draw the schematic or create missing parts.
The BOM is not yet locked: VS1838B has a sourcing blocker, the relay candidate’s NC rating is lower than NO, and footprint/fuse checks remain unfinished; no schematic or PCB changes were made.