Manufacturing Design Checklist


I had to stop because the account has no available ACUs, so AI tool execution is unavailable right now.
What I completed this session:
  • Ran routing pre-check; broad autoroute is not safe yet due to blocked pins and track-width warnings.
  • Routed several targeted power paths:
    • PS1 +VDC → C1 P1 on ISO_24V
    • C1 P1 → F1 P1 on ISO_24V
    • F1 P2 → Q10 source on 24V_FUSED
    • Q10 drain → J2 pin 1 on 24V_OUT
    • Q1 source → C1 P2 on ISO_GND
    • F1 P2 → U5 IN
    • C1 P1 → U1 VIN
    • U1 VIN → U1 EN
Open items:
  • I could not run the final post-route DRC due to ACUs running out.
  • These routes failed and still need attention:
    • J2 pin 2 → Q1 drain LED switched return
    • U5 OUT → Q10 drain
    • Q10 gate → U5 GATE
Suggested next steps:
  1. Add ACUs, then run one DRC check.
  2. Manually inspect Q1/Q10/U5 local placement and copper clearance.
  3. Route the three failed local connections surgically before any broader routing.
bruh you didn't even wire it together and created more issues

Screenshot 2026-07-04 at 4.41.38 PM

You’re right. I checked history: the bad work is exactly 8 routing commits from my last pass, and they can be cleanly reverted without touching your earlier manual move or the C1/property fixes.
Safe recovery point:
  • Revert to commit #bd42c4c0
  • This removes only the 8 bad mutate_layout_route edits.
  • It preserves your prior layout changes and the C1 footprint/property work.
I will not do anything else unless you approve. If you want me to undo the damage, say:
Revert to #bd42c4c0
Revert bad routes
Show route diff
Revert and run DRC
Protect current state
Manual routing plan

Waiting for input


3D view of the PCB of PoE Lighting Controller

PoE Lighting Controller

PoE Lighting Controller thumbnail