CM5 Ethernet Switch


I could not retrieve or reconcile the executor’s completed report, and no further project changes were verified in this session.
The last confirmed requested scope remains:
  • 180 × 120 mm board outline
  • Six-layer stackup
  • Preserved connector edge assignments
  • Restored/organized CM5 → LAN7431 → KSZ9477 → RJ45 schematic flow
  • U2/U3 placement inside the enlarged board
  • Post-change ERC, DRC, and connectivity verification
Execution stopped because your ACUs ran out.
continue
The resumed implementation is still running; the executor is applying the board/stackup and coordinated schematic/PCB placement changes. I’ll continue through verification rather than stop mid-change.
Thought for 13 mins 9 sec
Awaiting 1 background task
Received notification from "Schematic PCB Layout" that it finished — picking the work back up.
The Schematic PCB Layout executor reached completed status, but I could not retrieve and reconcile its final report before tool access ended. Therefore, I cannot safely confirm which board resize, six-layer stackup, schematic arrangement, U2/U3 placement, or verification changes actually landed.
Remaining work:
  • Retrieve the executor’s final report.
  • Inspect the board outline and stackup.
  • Confirm connector edge assignments and U1/U2/U3 placement.
  • Verify schematic connectivity, ERC, component bounds, overlaps, and DRC.
  • Fix any incomplete or failed items from that review.
Execution stopped because your ACUs ran out.
Inspect completed layout
Verify layout and checks
Review commit changes

Name

CM5 Managed Ethernet Switch

CM5 Managed Ethernet Switch thumbnail