Getting Started with Flux
Verify FC ratings, USB detection and regulated-5V changes; C5/C6 qualification evidence still blocked.
Recover ESC project access (blocked: saved UUID/link cannot be resolved).
Build and check safe bring-up firmware; full flight-firmware integration remains open.
Size and place FC PCB at 39 × 39mm after electrical gates; verify before routing.
Waiting for input
Schematic is Auto-placed
The schematic has been arranged automatically. Flux can redraw it to be more readable, with components placed in related groups and wires drawn more legibly. This takes about 10-60 mins.
Authoritative revision tests — 2026-10-08
HOLD —connected schematic checkpoint, not assembly or flight release
Before manufacture
First power
Source handling
MCU/clock/USB/storage/IMU
External interfaces
Analog validation
Motor and safety validation