Project Idea Kickoff


Start a new project
What would you like to build, and what should it do? A rough idea is enough to start.

Waiting for input


Placement Rework Resume Notes
Scope approved
90 × 55 mm, four-layer 1.6 mm board. All 77 components TOP ONLY. Keep enclosure, mounting/support anchors, RF clearance and display-circuit reservation. No routing. User requested high-reasoning functional placement and substantially better board UI/UX, including readable labels and service access.
Verified handoff received this session
The existing placement task nl was resumed. Its first completed report and the freshly read Placement Checkpoint establish:
  • 63 components repositioned/reoriented (62 translated plus U2 rotation-only); Top 77, Bottom 0.
  • Zero component-body overlap, outside-board, overlapping-copper, pad-access, Switching Power Stage and Decoupling Loop Area findings.
  • Functional clusters: quiet ADC/load-cell rear-left, MCU/RF front-left, nearby flash, USB/charger right-rear, buck-boost right-middle, RGB supply/translation front-right. Fixed connectors/MCU/switch anchors preserved.
  • Four neckdown warnings remain; six keepout error flags include intentional owner geometry and the real USB intrusion; J1 has one Invalid Pads error and one edge warning; 17 ERC errors remain. 145 airwires, no authored routing.
  • Real USB/hardware conflict remains at the fixed aperture. Switch actuator line is 30.8271 mm beyond the PCB front edge; existing switches cannot be aligned by an in-board translation. No enclosure fit approval.
  • Display circuit/FPC remains incomplete, charging inhibited, electrical/safety gates remain.
Full evidence and coordinates are in Placement Checkpoint. These counts precede the subsequent label follow-up and must not be represented as a fresh final audit.
Label/UI follow-up and exact interruption state
Initial label work had been left unattempted when concurrent manual changes enabled the Silk: Better Designators rule and briefly changed R5 package. That rule was reported to force 0.18 mm centered references, not acceptable readability.
I authorized the same placement task to finish label/UI work: adjust scoped text rules to readable dynamic references, preserve manual package geometry and all electrical/fab rules, remove duplicate reference presentation appropriately, preserve polarity/pin-1, improve proven interface annotations, keep values hidden, and verify body/pad/text/edge clearance visually. No component movement solely for text, circuit changes, routing or mechanical edits authorized.
The follow-up ran for over an hour. I then instructed it to finish the current bounded batch and report, without open-ended cosmetic iteration. The lifecycle last returned active/interrupted; a later completion notification arrived, but its final report and mutations could NOT be read before the account ran out of ACUs. Therefore final silk changes, current revision, label results and any new findings are UNVERIFIED in this lead session. Do not claim UI/UX finished.
Resume actions
  1. Recover the final report/status of placement task nl; read the updated Placement Checkpoint and inspect current revision/image. Do not blindly launch another writer.
  2. Confirm label changes and any remaining collisions without overwriting manual package edits. Keep bounded cosmetic scope.
  3. Run one fresh independent read-only placement/usability review (not yet performed this session): actual pin-specific clustering/decoupling, mechanical access, mounting conflict, top-only, label-body/label-label/pad/edge clarity. Review the artifact rather than trusting counts.
  4. Resolve only actionable in-scope findings and verify the fixes. Keep USB footprint, actuator architecture, incomplete circuit and safety gates explicit; mechanical/BOM changes need their own authorization.
  5. Stop before routing; no manufacture/charging/fit-release claim.
Execution stopped because the account ran out of ACUs. The final layout/UI follow-up completion notification is not itself verification of the requested overall outcome.
  • Scope approved

  • Verified handoff received this session

  • Label/UI follow-up and exact interruption state

  • Resume actions