Routing is substantially complete: 753 trace segments and 154 vias were added, with no overlapping-copper, via-in-pad, dangling-trace, or redundant-trace errors.
Open items
- 6 airwires remain:
EFUSE_OVP: U2 OVP → R5
3V3: U4 VOS → existing 3V3 via
- Four ground-plane connections around U6, C13, and R3
- These remained blocked after two targeted attempts; finishing them requires local copper rip-up and likely small placement adjustments.
- Non-blocking placement advisories remain for five decoupling loops and the U3→L1 switch-path detour.
Suggested next steps
- Authorize surgical movement around U2/U4/U6 and local trace rip-up to clear the six airwires.
- Re-run full DRC and power-integrity checks.
- Reconcile the routed PCB against the frame and USB-C cable clearance.